1574
|
Thursday, June 29, 2017, 11:55 |
David Wang | Conditioning Station | Repair | | | TCS HV cable and feed through installation | John Chow and I installed new TCS HV cable
and feed through with their mounting panel
back to TCS Faraday cage this Tuesday. ECO-4269 |
|
1393
|
Tuesday, November 08, 2016, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS water and vacuum pumps are switched off | TCS is vented. TM4 is disconnected and
TCS. |
|
1544
|
Friday, May 19, 2017, 12:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS and TM4 water flow measurement. |
|
|
1502
|
Monday, April 24, 2017, 16:11 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TCS TP1s is restarted. | TCS IG1S is switched on as well.
The reason to start the pump is to prepare
a possible extended TM2 conditioning at TCS |
|
2359
|
Tuesday, August 23, 2022, 10:51 |
Carla Babcock | ITE | Repair | TM4 | SiC#44 | TBHT to HV common short on SiC#44-TM4 | TM4 with SiC#44 installed developed a short
TBHT to HV common during its first heating
in ITE. Was fine before installation. Now |
|
1061
|
Tuesday, September 01, 2015, 16:55 |
Anders Mjos | Conditioning Station | Maintenance | | | TBHT power supply remvoed | The power supply is needed as a spare
for the failed TGHT p/s in ITW |
|
243
|
Friday, February 08, 2013, 11:42 |
Grant Minor | ITE | Maintenance | | | TAPC 477 resolved - ISAC elec. room gas cylinder | See attached TAPC 477 documentation. |
|
316
|
Tuesday, April 23, 2013, 15:59 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | N/A | Systems off | Both the Cooling Package and
Vacuum have been turned off in preparation
for the module move tomorrow |
|
241
|
Monday, January 28, 2013, 12:26 |
Travis Cave | Conditioning Station | Development | | | Switches connected | the switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is |
|
1084
|
Monday, September 28, 2015, 10:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | Switched off CS vacuum pumps and water system | I switched off CS vacuum pumps and water
system after Isac opps finished the TM4 conditioning
at CS. |
|
2041
|
Tuesday, January 07, 2020, 08:02 |
David Wang | Cooling | Standard Operation | | | Switch on HALCW MP2 | HALCW MP2 is switched on this morning after
yesterday cooling tower maintenance. LALCW
P5 and P6 pumps are started by isac operator |
|
1500
|
Monday, April 24, 2017, 09:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Switch off TCS water system and vacuums | The TCS bias was turn off before that.
The TM2 and TCS are still under vacuum now. |
|
1613
|
Wednesday, September 13, 2017, 10:05 |
David Wang | Conditioning Station | Repair | TM3 | | Switch off TCS water system and vacuums | Preparing vent the TCS/TM3. We will remove
TM3 service tray cover plate after
venting. |
|
2804
|
Tuesday, May 13, 2025, 13:12 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. |
|
|
2805
|
Tuesday, May 13, 2025, 13:13 |
Frank Song | MAA | Repair | | | Swap out the target hall alpha CAM. | AlphaCAM has been replaced and tested by
RPG in MAA target hall. (per Document-154779)
WorkPermit # I2025-05-13-3 |
|
1376
|
Friday, October 21, 2016, 15:10 |
Anders Mjos | South Hot-Cell | Repair | TM2 | Ta#49 | Stuck TGHT clamp bolt removal | During target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt |
|
1775
|
Tuesday, September 04, 2018, 08:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 24# | Stppped TM4 and TCS vacuum and water system at TCS. | I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now. |
|
2502
|
Friday, November 17, 2023, 11:28 |
Adam Newsome | Spent Target Vault | Maintenance | | | Storage vault: issue observed with door opening | During operation today, it was observed
that the main vault door had issues opening..
typically when the door was around 80-90% |
 |
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|
1024
|
Wednesday, July 29, 2015, 06:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | Stopped the CS and TM4 pumps and vent with argon. | Dan and I stopped the CS and TM4 pumps.
We are venting the CS with argon for UCX13
target. |
|