ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2353
|
Tuesday, August 09, 2022, 12:19 |
Frank Song | ITE | Standard Operation | TM4 | Ta#64 | TM4 with Ta#64 disconnection in ITE |
TM4 with Ta#64 has been disconnected in ITE. |
Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
|
|
2354
|
Tuesday, August 09, 2022, 12:23 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta #64 | Electrical Check for TM4 with Ta#64 after beam at NHC |
An electrical check made at NHC right after TM4 moving from ITE. |
Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
|
|
2355
|
Wednesday, August 10, 2022, 08:10 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Sic#44 | electrical and leak check |
TM4 with Sic#44 installed and had an electrical / leak check at NHC. |
Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
|
|
2358
|
Thursday, August 18, 2022, 10:41 |
Frank Song | ITE/ITW | Standard Operation | TM4 | SiC#44 | TM4 with SiC#44 connection in ITE |
TM4 with target SiC#44 was connected in ITE on Tuesday. |
Attachment 1: TM4_with_SiC#44_connection_in_ITE.jpg
|
|
2361
|
Tuesday, September 06, 2022, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | UCx#38 | module disconnection |
TM2 with Target UCx38 was disconnected in ITW and moved to NHC |
Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
|
|
2362
|
Tuesday, September 06, 2022, 14:05 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#38 | electrical check after disconnection |
An electrical was done on the NHC for TM2 with spent Target UCx#38 on |
Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
|
|
2363
|
Thursday, September 08, 2022, 07:20 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
An electrical check was done on NHC yesterday. |
Attachment 1: TM2_with_UCx#39_E_Check.png
|
|
2365
|
Tuesday, September 13, 2022, 14:10 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | Module Connection |
TM2 with UCx#39 is connected in ITW. |
Attachment 1: TM2_with_UCx#39_connection_in_ITW.png
|
|
2370
|
Monday, October 03, 2022, 09:42 |
Frank Song | ITE | Standard Operation | TM4 | Sic#44 | module disconnection |
TM4 with SiC@44 was disconnected in ITE. |
Attachment 1: TM4_with_SiC#44_disconnected_in_ITE.png
|
|
2373
|
Tuesday, October 04, 2022, 07:19 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
an electrical was done for TM4 with target C#4 installed on NHC. |
Attachment 1: tm4_with_C#4_installed.png
|
|
2376
|
Tuesday, October 11, 2022, 12:39 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | Module Connection |
TM4 with Target C#4 was connected in ITE. |
Attachment 1: TM4_with_C#4_connection_in_ITE.png
|
|
2381
|
Tuesday, November 01, 2022, 12:37 |
Frank Song | ITW | Standard Operation | TM2 | UCx#39 | disconnection |
TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC. |
Attachment 1: TM2_with_UCx39_disconnection_in_ITW.png
|
|
2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
TM2 with spent target UCx#39 had an electric check in NHC.
After UCx 39# target was removed out., I did electrical check on TM2. @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm. A to P is still short. |
Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
|
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check |
an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS. |
Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
|
|
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection |
TM2 with UCx#40 is connected in ITW. |
Attachment 1: TM2_with_UCx#40_connection_in_ITW.png
|
|
2388
|
Tuesday, November 22, 2022, 09:44 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | module disconnection |
TM4 with C#4 was disconnected in ITE |
Attachment 1: TM4_with_C#4_disconnected_in_ITE.png
|
|
2390
|
Tuesday, November 22, 2022, 12:41 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
TM4 with C#4 is checked on NHC right after moving from ITE. |
Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
|
|
2392
|
Wednesday, November 23, 2022, 11:27 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#41 | electric and leak check after new target installed |
an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS. |
Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
|
|
2396
|
Thursday, December 01, 2022, 08:20 |
Frank Song | ITE | Standard Operation | TM4 | UCx#41 | Module Connection |
TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) |
Attachment 1: TM4_with_UCx#41_connection_in_ITE.png
|
|
2402
|
Monday, January 09, 2023, 14:19 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | TM2 with UCx40 disconnection in ITW |
TM2 with target UCx40 was disconnected in ITW and moved to NHC. |
Attachment 1: TM2_with_UCx40_disconnection_in_ITW.png
|
|