Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 61 of 141  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE

 TM4 with Ta#64 has been disconnected in ITE.

Attachment 1: TM4_with_Ta#64_disconnection_in_ITE.jpeg
TM4_with_Ta#64_disconnection_in_ITE.jpeg
  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC

 An electrical check made at NHC right after TM4 moving from ITE.

Attachment 1: tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

Attachment 1: TM4_with_Sic#44_eletrical_and_leak_check.jpg
TM4_with_Sic#44_eletrical_and_leak_check.jpg
  2358   Thursday, August 18, 2022, 10:41 Frank SongITE/ITWStandard OperationTM4SiC#44TM4 with SiC#44 connection in ITE

 TM4 with target SiC#44 was connected in ITE on Tuesday.

Attachment 1: TM4_with_SiC#44_connection_in_ITE.jpg
TM4_with_SiC#44_connection_in_ITE.jpg
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection

 TM2 with Target UCx38 was disconnected in ITW and moved to NHC

Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
TM2_with_UCx38_disconnection_in_ITW.png
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection

 An electrical was done on the NHC for TM2 with spent Target UCx#38 on

Attachment 1: TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 An electrical check was done on NHC yesterday.

Attachment 1: TM2_with_UCx#39_E_Check.png
TM2_with_UCx#39_E_Check.png
  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection

 TM2 with UCx#39 is connected in ITW.

Attachment 1: TM2_with_UCx#39_connection_in_ITW.png
TM2_with_UCx#39_connection_in_ITW.png
  2370   Monday, October 03, 2022, 09:42 Frank SongITEStandard OperationTM4Sic#44module disconnection

 TM4 with SiC@44 was disconnected in ITE.

Attachment 1: TM4_with_SiC#44_disconnected_in_ITE.png
TM4_with_SiC#44_disconnected_in_ITE.png
  2373   Tuesday, October 04, 2022, 07:19 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 an electrical was done for TM4 with target C#4 installed on NHC.

Attachment 1: tm4_with_C#4_installed.png
tm4_with_C#4_installed.png
  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection

 TM4 with Target C#4 was connected in ITE.

Attachment 1: TM4_with_C#4_connection_in_ITE.png
TM4_with_C#4_connection_in_ITE.png
  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection

 TM2 with spent target UCx#39 was disconnected in ITW then moved to NHC.

Attachment 1: TM2_with_UCx39_disconnection_in_ITW.png
TM2_with_UCx39_disconnection_in_ITW.png
  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

Attachment 1: electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical check

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

Attachment 1: TM2_with_UCx40_electrical_check_on_NHC.png
TM2_with_UCx40_electrical_check_on_NHC.png
  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection

 TM2 with UCx#40 is connected in ITW.

Attachment 1: TM2_with_UCx#40_connection_in_ITW.png
TM2_with_UCx#40_connection_in_ITW.png
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnection

TM4 with C#4 was disconnected in ITE

Attachment 1: TM4_with_C#4_disconnected_in_ITE.png
TM4_with_C#4_disconnected_in_ITE.png
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

Attachment 1: TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
TM4_with_UCx#41_electric_and_leak_check_on_NHC.png
  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

Attachment 1: TM4_with_UCx#41_connection_in_ITE.png
TM4_with_UCx#41_connection_in_ITE.png
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

Attachment 1: TM2_with_UCx40_disconnection_in_ITW.png
TM2_with_UCx40_disconnection_in_ITW.png
ELOG V2.9.2-2455