  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed
 electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png 
  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical checkan electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS.
 TM2_with_UCx40_electrical_check_on_NHC.png 
  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection TM2 with UCx#40 is connected in ITW.  TM2_with_UCx#40_connection_in_ITW.png 
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnectionTM4 with C#4 was disconnected in ITE  TM4_with_C#4_disconnected_in_ITE.png 
  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check TM4 with C#4 is checked on NHC
right after moving from ITE.
 TM4_with_C#4_electrical_check_right_after_moving_to_NHC.png 
  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS.
 TM4_with_UCx#41_electric_and_leak_check_on_NHC.png 
  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection TM4 with UCx#41 was connected in
ITE on Tuesday (2022-11-29) 
 TM4_with_UCx#41_connection_in_ITE.png 
  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW TM2 with target UCx40 was disconnected
in ITW and moved to NHC.
 TM2_with_UCx40_disconnection_in_ITW.png 
  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo TM2 with no target on SW silo be
electrical checked right after module moving.
 TM2_electrical_check_without_UCx40_on_SW_silo.png 
  2428   Thursday, March 30, 2023, 14:29 Frank SongITE/ITWDevelopment  Preparation of target stations for FEBIAD runsHelium cylinder and  Argon cylinder
are installed in both ITE/ITW faraday cages
, regulator for outlet pressure are not set
 1_(5).png1_(2).png 
  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC.
 TM4_with_TiC#5_20230508.png 
  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection TM4 was connected in ITE.  pics
attached FYI.
 TM4_with_TiC5_connection_in_ITE_20230509.pngTM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG 
  2442   Friday, May 19, 2023, 09:39 Frank SongSouth Hot-CellStandard OperationTM2TiC#6leak/electrical check TM2 with TiC#6 was checked on SHC,
see pic attached pls.
 TM2_with_TiC#6_leak_and_eletrical_check.png 
  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully.
 TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf 
  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cageargon is being supplied at 6 psi to TM4.   Argon_supplied_at_6psi_to_TM4_in_ITE.JPG 
  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage Gas lines pumped  gas_lines_pumped_out_to_ITW.JPG 
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection TM4 with TiC#5 was disconnected in
ITE and moved to NHC.
 TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf 
  2456   Tuesday, June 13, 2023, 11:45 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check TM4 with spent target TiC#5 electric
check after moving from ITE to NHC.
 TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png 
  2457   Tuesday, June 13, 2023, 11:49 Frank SongNorth Hot-CellStandard OperationTM4SiC#45electrical check and leak check TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC.
 TM4_with_SiC#45_leak&electric_check_on_top_of_NHC.png 
  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed.
 TM4_with_SiC#45_connected_in_ITE_20230613.pdf 