2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check | TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed |
|
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check | an electrical check was done on NHC, TM2
with new target UCx40 is ready moving to
TCS. |
|
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection | TM2 with UCx#40 is connected in ITW. |
|
2388
|
Tuesday, November 22, 2022, 09:44 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | module disconnection | TM4 with C#4 was disconnected in ITE |
|
2390
|
Tuesday, November 22, 2022, 12:41 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check | TM4 with C#4 is checked on NHC
right after moving from ITE. |
|
2392
|
Wednesday, November 23, 2022, 11:27 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#41 | electric and leak check after new target installed | an electric check and leak check
done on NHC, TM4 with new target UCx#41 is
ready moving to TCS. |
|
2396
|
Thursday, December 01, 2022, 08:20 |
Frank Song | ITE | Standard Operation | TM4 | UCx#41 | Module Connection | TM4 with UCx#41 was connected in
ITE on Tuesday (2022-11-29) |
|
2402
|
Monday, January 09, 2023, 14:19 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | TM2 with UCx40 disconnection in ITW | TM2 with target UCx40 was disconnected
in ITW and moved to NHC. |
|
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo | TM2 with no target on SW silo be
electrical checked right after module moving. |
|
2428
|
Thursday, March 30, 2023, 14:29 |
Frank Song | ITE/ITW | Development | | | Preparation of target stations for FEBIAD runs | Helium cylinder and Argon cylinder
are installed in both ITE/ITW faraday cages
, regulator for outlet pressure are not set |
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
2440
|
Wednesday, May 10, 2023, 08:40 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | Module Connection | TM4 was connected in ITE. pics
attached FYI. |
|
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check | TM2 with TiC#6 was checked on SHC,
see pic attached pls. |
|
2447
|
Monday, May 29, 2023, 12:52 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | Module Connection | TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully. |
|
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage | argon is being supplied at 6 psi to TM4. |
|
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage | Gas lines pumped |
|
2455
|
Tuesday, June 13, 2023, 09:55 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | module disconnection | TM4 with TiC#5 was disconnected in
ITE and moved to NHC. |
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
2458
|
Wednesday, June 14, 2023, 07:10 |
Frank Song | ITE | Standard Operation | TM4 | SiC#45 | TM4 with SiC#45 connection in ITE | TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed. |
|