  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check

 TM2 with spent target UCx#39 had an electric check in NHC.

After UCx 39# target was removed out., I did electrical check on TM2.   @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm.  A to P is still short.

  2383   Wednesday, November 02, 2022, 11:11 Frank SongNorth Hot-CellStandard OperationTM2UCx#40electrical check

an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS.

  2387   Tuesday, November 15, 2022, 13:33 Frank SongITWStandard OperationTM2UCx#40Module Connection

 TM2 with UCx#40 is connected in ITW.

  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnection

TM4 with C#4 was disconnected in ITE

  2390   Tuesday, November 22, 2022, 12:41 Frank SongNorth Hot-CellStandard OperationTM4C#4electrical check

 TM4 with C#4 is checked on NHC right after moving from ITE.

  2392   Wednesday, November 23, 2022, 11:27 Frank SongNorth Hot-CellStandard OperationTM4UCx#41electric and leak check after new target installed

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

  2396   Thursday, December 01, 2022, 08:20 Frank SongITEStandard OperationTM4UCx#41Module Connection

 TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) 

  2402   Monday, January 09, 2023, 14:19 Frank SongITWStandard OperationTM2UCx#40TM2 with UCx40 disconnection in ITW

 TM2 with target UCx40 was disconnected in ITW and moved to NHC.

  2403   Tuesday, January 10, 2023, 10:15 Frank SongSafe Module ParkingStandard OperationTM2UCx40 removedTM2 electrical check with no target attached on SW silo

 TM2 with no target on SW silo be electrical checked right after module moving.

  2428   Thursday, March 30, 2023, 14:29 Frank SongITE/ITWDevelopment  Preparation of target stations for FEBIAD runs

Helium cylinder and  Argon cylinder are installed in both ITE/ITW faraday cages , regulator for outlet pressure are not set yet.

 

TO ITE :  Argon bottle size 14"L x 4"D with SV2 connected at pressure 900 Psi ( 70 bar )

               Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )

TO ITW: Argon bottle size 15"L x 2"D with SV2 connected at pressure 1000 Psi ( 80 bar )

              Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )

An Neon cylinder size 20"L x 6"D  at less than 100 psi ( <10 bar ) pressure stored in the cabinet of ITW cage without connection

two gas line connection pictures are attached here for reference.

  2439   Monday, May 08, 2023, 10:59 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check/leak check

 TM4 with target TiC#5 installed has been leak checked and electric checked on NHC.

  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection

 TM4 was connected in ITE.  pics attached FYI.

  2442   Friday, May 19, 2023, 09:39 Frank SongSouth Hot-CellStandard OperationTM2TiC#6leak/electrical check

 TM2 with TiC#6 was checked on SHC, see pic attached pls.

  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection

 TM2 with TiC#6 was connected in ITW (FEBIAD), turbo pumps were started successfully.

  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cage

argon is being supplied at 6 psi to TM4. 

  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection

 TM4 with TiC#5 was disconnected in ITE and moved to NHC.

  2456   Tuesday, June 13, 2023, 11:45 Frank SongNorth Hot-CellStandard OperationTM4TiC#5electrical check

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

  2457   Tuesday, June 13, 2023, 11:49 Frank SongNorth Hot-CellStandard OperationTM4SiC#45electrical check and leak check

 TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC.

  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE

 TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed.