2382
|
Tuesday, November 01, 2022, 12:40 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#39 | electrical check |
TM2 with spent target UCx#39 had an electric check in NHC.
After UCx 39# target was removed out., I did electrical check on TM2. @500 V B to C is 5M ohm. all Others between are above 25Mohm. HV to Chasis is 650Mohm. A to P is still short. |
2383
|
Wednesday, November 02, 2022, 11:11 |
Frank Song | North Hot-Cell | Standard Operation | TM2 | UCx#40 | electrical check |
an electrical check was done on NHC, TM2 with new target UCx40 is ready moving to TCS. |
2387
|
Tuesday, November 15, 2022, 13:33 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | Module Connection |
TM2 with UCx#40 is connected in ITW. |
2388
|
Tuesday, November 22, 2022, 09:44 |
Frank Song | ITE | Standard Operation | TM4 | C#4 | module disconnection |
TM4 with C#4 was disconnected in ITE |
2390
|
Tuesday, November 22, 2022, 12:41 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | C#4 | electrical check |
TM4 with C#4 is checked on NHC right after moving from ITE. |
2392
|
Wednesday, November 23, 2022, 11:27 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#41 | electric and leak check after new target installed |
an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS. |
2396
|
Thursday, December 01, 2022, 08:20 |
Frank Song | ITE | Standard Operation | TM4 | UCx#41 | Module Connection |
TM4 with UCx#41 was connected in ITE on Tuesday (2022-11-29) |
2402
|
Monday, January 09, 2023, 14:19 |
Frank Song | ITW | Standard Operation | TM2 | UCx#40 | TM2 with UCx40 disconnection in ITW |
TM2 with target UCx40 was disconnected in ITW and moved to NHC. |
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo |
TM2 with no target on SW silo be electrical checked right after module moving. |
2428
|
Thursday, March 30, 2023, 14:29 |
Frank Song | ITE/ITW | Development | | | Preparation of target stations for FEBIAD runs |
Helium cylinder and Argon cylinder are installed in both ITE/ITW faraday cages , regulator for outlet pressure are not set yet.
TO ITE : Argon bottle size 14"L x 4"D with SV2 connected at pressure 900 Psi ( 70 bar )
Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )
TO ITW: Argon bottle size 15"L x 2"D with SV2 connected at pressure 1000 Psi ( 80 bar )
Helium bottle size 18"L x 7"D with SV1 connected at pressure 2000 Psi ( 130 bar )
An Neon cylinder size 20"L x 6"D at less than 100 psi ( <10 bar ) pressure stored in the cabinet of ITW cage without connection
two gas line connection pictures are attached here for reference. |
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check |
TM4 with target TiC#5 installed has been leak checked and electric checked on NHC. |
2440
|
Wednesday, May 10, 2023, 08:40 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | Module Connection |
TM4 was connected in ITE. pics attached FYI. |
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check |
TM2 with TiC#6 was checked on SHC, see pic attached pls. |
2447
|
Monday, May 29, 2023, 12:52 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | Module Connection |
TM2 with TiC#6 was connected in ITW (FEBIAD), turbo pumps were started successfully. |
2448
|
Tuesday, May 30, 2023, 12:23 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | gas lines pump out in ITE Faraday Cage |
argon is being supplied at 6 psi to TM4. |
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage |
Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure |
2455
|
Tuesday, June 13, 2023, 09:55 |
Frank Song | ITE | Standard Operation | TM4 | TiC#5 | module disconnection |
TM4 with TiC#5 was disconnected in ITE and moved to NHC. |
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check |
TM4 with spent target TiC#5 electric check after moving from ITE to NHC. |
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check |
TM4 with new target SiC#45 installed has been leak checked and electrical checked on top of NHC. |
2458
|
Wednesday, June 14, 2023, 07:10 |
Frank Song | ITE | Standard Operation | TM4 | SiC#45 | TM4 with SiC#45 connection in ITE |
TM4 with new target SiC#45 was connected in ITE, all TPs are running at their full speed. |