2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE |
Nb#10 never worked online - repeller had no effect on the beam and one of the RF wires was touching HVC. Max 60pA was seen on the source cup. See notes here ITW-TM2-Nb#10/#11-LP-IGLIS (Web view)
Target was handled roughly after use - kicked around in NHC for a long time, then loaded into a pail (multipin had to be dettached for this) then moved to SHC, unloaded from pail, then plates covering the RF electrodes had to be pried off. Lots of knocking and shaking.
Theory was that the repeller wire was disconnected. But found it not obviously broken, had good continuity from the ring tongue to the end of the wire pulled out of the multipin, even after all the abuse. Same for the RF (from the end of the electrode to the end of the wire pulled out of the multipin). Did find some of the multipin wires were flaky - if moved around they showed intermittent shorts to HVC. But not clear if this is from the rough handling afterwards or not. The problem was not in the module since NB#11 ran immediately afterwards with no issues. Most likely culprit seems to be the insulation beads on the wires. Should look for more robust insulation solutions. On the other hand, the connections of the wires to the electrodes seems very good.
Still not sure why no effect of the repeller was seen. Could be a intermittent break/short, though this seems unlikely. Maybe the connection in the multipin was not good? I did not get a chance to inspect that. |
|
2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE |
TiC#7 failed after two weeks of operations - measurements in the electrical room indicated that the negative side of the CHT was broken (35kOhms to the rest of the target). This was likely due to a large number of proton trips during this target run. At every trip I could see the CHT voltage getting higher and more unstable. This cahnge in voltage was reflected in the unstable anode current and fluctuating RIB beam intensity, as a direct result of the fluctuating power on the CHT. The break was confirmed in PIE, loosening the screws caused the target container to come off without the cathode. Otherwise nothing unusual was seen. The anode wire connections seem very robust, dragging the target around with the multipin disconnected, flipping it up and down, etc and the anode wire stayed attached. Though we saw lots of outgassing on this target, things looked the normal level of dirty. There was no buildup between PE and EE. |
|
2666
|
Monday, August 19, 2024, 15:29 |
Frank Song | ITW/ITE | Standard Operation | TM2 | Ta#67 | shielding blocks transfer |
5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving. |
|
2665
|
Monday, August 19, 2024, 09:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#68 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. The move is successful. |
|
2664
|
Friday, August 16, 2024, 15:32 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | Ta#68 LP-SIS | Target Ta#68 loaded onto TM4 |
Target Ta#68 loaded onto TM4
-leak check passed
-Target electrode conductor screws torqued to 130 in-lbs
-electrical check passed
Containment box cover re-installed
photo attached |
|
2663
|
Friday, August 16, 2024, 15:28 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#7 HP-FEBIAD | TiC#7 Target Removed from TM4 |
TiC#7 Target Removed from TM4. - Photos attached
TiC#7 Currently sitting in SHC waiting for disposal |
|
2662
|
Friday, August 16, 2024, 13:29 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Ta#68 | electrical check/leak check |
New target Ta#68 is installed on TM4 and be leak/electric checked. Pls see attachment. |
|
2661
|
Friday, August 16, 2024, 09:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from SMP to SHC. |
TM4 has been moved from SMP to SHC. The move is smooth.
|
|
2660
|
Friday, August 16, 2024, 08:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#46 | Spent Target Move |
SiC#46 (pail 293) was placed in the vault (spot 3B) on Wednesday the 14th of August. It was 111 mSv/hr when removed from the south hot cell. See attached PDF for details. |
|
2659
|
Wednesday, August 14, 2024, 11:29 |
Aaron Tam | Waste Package/Ship | Standard Operation | | SiC#46 | Target Disposal and visual check |
SiC#46 loaded into pail 293 successfully along with other hotcell waste
Upon visual inspection of the target, a spark-sign was spotted on the perimeter of the extraction electrode. Metallic looking material also found built up between the extraction electrode and the backing plate of the target
Photo attached |
|
2658
|
Tuesday, August 13, 2024, 14:23 |
David Wang | ITE | Standard Operation | TM3 | Ta#67. | TM2 with Ta#target has been moved from SHC to ITE. |
TM2 with Ta#target has been moved from SHC to ITE. the move is smooth. |
|
2657
|
Tuesday, August 13, 2024, 14:18 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | Module Connection |
TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now. |
|
2656
|
Tuesday, August 13, 2024, 08:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#67 | electrical check/leak check |
TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls. |
|
2655
|
Monday, August 12, 2024, 15:55 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#67 LP-SIS | Target Loading |
Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel
|
|
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered |
With the new TiC#8 target installed on TM3, there was a ~7kOhm connection between TGHT/TBHT (A/B/C/D) and HV common. The standard electrical check on the module showed standard values, so it was assumed the problem was inside the target.
Started removing bolts/water connections one by one to see if any of them had an effect on the measurement. Found that disconnecting the multipin on the target from the mating connector on the source tray resolved the issue. Determined that the only way this could happen is if a spark cut through the insulation covering the multipin wires. Because of the way they are routed, they can touch the water lines and they are definitely touching waterline C, TBHT-. We do not typically check continuity of multipins to all water lines, just to HVC, so did not see this in the standard electrical check. Measurements verified that pin 2-4 was touching water line C, creating a short from TGHT/TBHT to HV common when the multipin connector is attached, since the pins are shorted to HVC inside the connector when they are not used.
Issue was solved by removing the target into the ante room, removing connector 1 all together since it was not used, and removing the grounding on the other pins, leaving only pin 2-2 connected for the anode.
In future we will change the IGLIS wiring so pin 2-4 is not used, and redesign the cable routing so it cannot touch the blocks. For the immediate term, we will add to the electrical check a check of each pin to TBHT/TGHT/COIL. |
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. |
TM3 has been connected in ITW. See attachment for checklist. |
|
2652
|
Friday, August 09, 2024, 18:20 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from SHC to ITW. |
With TiC # 8 installed, TM3 has been moved from SHc to ITW. The move is smooth. |
|
2651
|
Friday, August 09, 2024, 18:18 |
David Wang | ITW | Standard Operation | TM4 | TiC#7 | Tm4 has been moved from ITW to SMP. |
Tm4 has been moved from ITW to SMP. the move is successful. |
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check |
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
|
2649
|
Friday, August 09, 2024, 08:11 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | module disconnection |
TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS. |