  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1664   Friday, December 01, 2017, 16:42 Isaac EarleNorth Hot-CellRepair  NHC manipulator service visitPete Dudley, manipulator service technician
from CRL, was on site from Nov 27-30 to service
the NHC Model N manipulators (See E-log entry
 1512175169704.jpg1512175181553.jpg 
  1738   Thursday, June 21, 2018, 17:15 Isaac EarleNorth Hot-CellDevelopment  Motorla CP200 radio with throat mic tested in NHC A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells.  A High Technology Communications
  
  1756   Thursday, July 19, 2018, 14:22 Isaac EarleNorth Hot-CellDevelopment  NHC diagnostic signals - connector and wiring detailsInstallation of the diagnostic connections
between the NHC hot and cold sides has been
completed.  The cable bundle was prepared
  
  1761   Wednesday, August 01, 2018, 09:47 Isaac EarleNorth Hot-CellDevelopment  NHC diagnostic signals and control panel tested On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was
  
  1780   Wednesday, September 12, 2018, 15:22 Isaac EarleNorth Hot-CellDevelopment  NHC air and gas supply lines - test and leak checkTesting was completed today on the NHC
air and gas supply lines.  For each
line a Staubli plug was installed on the
  
  1781   Wednesday, September 12, 2018, 15:30 Isaac EarleNorth Hot-CellDevelopment  Installation of NHC operator-level lighting completed Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801.  2" x 2"
 LEDs_and_manipulators.jpgLEDs.jpgcords.jpg 
  1782   Thursday, September 13, 2018, 16:57 Isaac EarleNorth Hot-CellDevelopment  NHC grounding and mili-ohm testing The
following equipment has been connected to
the building ground located in the Target
  
  1825   Thursday, November 22, 2018, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC design approved by High Voltage EngineerTo satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage
 NHCHV.pdf 
  1826   Monday, November 26, 2018, 12:19 chad fisherNorth Hot-CellRepair  East ManipulatorIn preparation for removing the slave for
replacement I discovered that the timing
screw in the handle cable drum (master side)
 20181126_113326.jpg20181126_113338.jpg 
  1837   Friday, December 07, 2018, 08:47 chad fisherNorth Hot-CellRepair  North hot cell spare slave repairThe tong cable on the spare north hot cell
slave has been repaired. Slave came from
the factory with the tong cables straddling
 20181207_083906.jpg 
  1838   Friday, December 07, 2018, 10:37 chad fisherNorth Hot-CellRepair  Ariel connector testCompleted testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare;
  
  1839   Monday, December 10, 2018, 15:31 Isaac EarleNorth Hot-CellDevelopment  NHC remote connection testing with manipulators The following tests have been successfully
completed using the NHC manipulators:

    Ventilation pre-filter
  
  1841   Tuesday, December 18, 2018, 11:13 Isaac EarleNorth Hot-CellDevelopment  NHC manipulator slave-end swap, RH test, and various other workThe following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1:
  
  1847   Friday, January 04, 2019, 14:38 Isaac EarleNorth Hot-CellDevelopment  NHC cameras testedThe NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. 
 NHC_flange_East_and_West_views.JPGNHC_flange_North_and_South_views.JPGCamera_view_through_operator_viewing_window.JPG 
  1859   Friday, January 18, 2019, 10:26 Isaac EarleNorth Hot-CellDevelopment  NHC sealing improvements and repeat of RH test for LED lightsThe following NHC development work was
completed under WP I2019-01-09-4:

    Location of RH feature
  
  1860   Monday, January 21, 2019, 16:27 Isaac EarleNorth Hot-CellDevelopment  NHC in-cell camera wired to right side monitor The NHC right side monitor has been
wired to display the signal from the in-cell
camera.  This was tested using a snake
 20190121_154407.jpg 
  1864   Thursday, January 31, 2019, 14:16 Isaac EarleNorth Hot-CellDevelopment  NHC grounding approval Franco Mammarella was consulted regarding
electrical grounding of the NHC design (RS103
of Document-131915).  After discussing
 NHC_grounding.pdf 
  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell EntryChad entered the NHC today to tighten set-screws
on both slave side manipulators and re-align
the West side slave. Work took place using
 NHC_2020-02-27.pdf 
  2091   Friday, March 27, 2020, 08:45 Matthew GareauNorth Hot-CellMaintenance  Issues with the manipulators This is a link to all of the issues
with the NHC manipulators that I know of

  
  2158   Tuesday, October 27, 2020, 11:46 Matthew GareauNorth Hot-CellRepair  Ratcheting repair issues with both left and right master  

  