675
|
Monday, June 02, 2014, 15:40 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | TM1 and CS turbo pumps have been started.
The vacuum readings are fine on all gauges. |
|
|
709
|
Thursday, July 17, 2014, 11:49 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 and CS turbo pumps have been started | I connected TM1 at CS. All turbo pumps
have been started. The pumping down is
good so far. |
|
|
615
|
Thursday, March 06, 2014, 14:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 air to vacuum and water lines leak check at CS. | TM1 air to vacuum and water lines leak
check at CS are finished this afternoon.
The leak detector is hooked directly |
8x |
|
1065
|
Thursday, September 10, 2015, 08:55 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Leak Diag. | Vacuum leak check on the window line circuit
of TM1 took place yesterday and again to
confirm this morning. Both days the response |
|
|
1069
|
Tuesday, September 15, 2015, 11:06 |
chad fisher | South Hot-Cell | Repair | TM1 | | TM1 Window Gasket Replacement | Replaced the custom silver gaskets on the
entrance window panel of TM1 this morning...this
has eliminated an sign of leak at this joint, |
|
|
157
|
Thursday, August 02, 2012, 07:48 |
David Wang | Conditioning Station | Standard Operation | TM1 | UCx | TM1 UCx target heat shield helium pressure check is done. | Connected leak detector to TM1 and CS vacuum
system. The vacuum readings on TM1 and
CS:PNG4 3.6 xE-6 Torr, IG1 1.1xE-6torr, IG4(diagnostic |
|
|
209
|
Thursday, November 08, 2012, 08:42 |
David Wang | Conditioning Station | Standard Operation | TM1 | TiC #3 | TM1 TiC #3 target heat shield helium pressure check is done. | TM1 TiC #3 target heat shield
helium pressure check is done at conditioning
station. Applied 80 psi helium to HS circuit |
|
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. | Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All high
vacuum gauge readings at CS and TM1 are at |
|
|
676
|
Tuesday, June 03, 2014, 09:12 |
David Wang | Conditioning Station | Standard Operation | TM1 | UC9# | TM1 HS line helium pressure test and TM1 electrical check at CS | TM1 HS line helium pressure test and TM1
electrical check at CS under vacuum are finished.
Everything is good. See attachment |
7x |
|
11
|
Thursday, July 21, 2011, 17:39 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs | Over the
period of July 20-21st TM1 had several repairs
completed and tested. The easiest of the |
|
|
12
|
Friday, July 22, 2011, 10:30 |
Bevan Moss | Conditioning Station | Repair | TM1 | | TM1 Ground Electrode, Thermocouple line, Stem, panel, repairs |
|
|
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
|
30
|
Wednesday, September 28, 2011, 11:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | TM#4 moved from South Hot Cell to to North East Silo. | TM#4 moved from South Hot Cell to to North
East Silo, move went well. |
|
|
2219
|
Tuesday, May 25, 2021, 16:20 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 refilled | Tank refilled from 12 in to 25 in using
the new valve. |
|
|
819
|
Monday, December 15, 2014, 08:50 |
Anders Mjos | Conditioning Station | Maintenance | TM2 | | TK2 level below 15 in (secondary loop) | The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping. |
|
|
909
|
Monday, May 04, 2015, 13:32 |
Anders Mjos | Conditioning Station | Maintenance | | | TK2 expansion tank topped up | Caled cyclotron ops to open P23 and confirmed
penthouse valve open.
Filled up TK2 to 21 in water leve. |
|
|
1527
|
Monday, May 08, 2017, 09:49 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update weekly | Update TH schedule weekly to show the job
process. |
|
|
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly | See attachments. |
|
|
1498
|
Wednesday, April 19, 2017, 08:29 |
David Wang | Conditioning Station | Standard Operation | | | TH schedule 132 update in first beam week | Update schedule to show job process in
TH. See attachment 1,2. |
|
|
2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|