  2639   Friday, July 12, 2024, 08:51 Riley SykesSafe Module ParkingMaintenance  SMP chain guard SS washers were added to all slotted
holes on SMP chainguard cover plate
  
  2745   Thursday, January 09, 2025, 11:46 David WangSafe Module ParkingStandard OperationTM4No targetSMP is under vacuum for TM4 storage during shut down.  SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down.
  
  2762   Monday, February 03, 2025, 13:04 David WangSafe Module ParkingMaintenance  ITW/ITW 24VDC electrical connectors for TP BVs MRO.ITW/ITW 24VDC electrical connectors for
TP BVs MRO has been done.  
  
  2773   Thursday, February 20, 2025, 10:12 David WangSafe Module ParkingStandard OperationTM4No targetTM4 electrical check at SMP(vented) without targetTM4 electrical check at SMP(vented) without
target: PQ is dead short to RU. PQRU to 60kv
bias,750Kohm at250V. other things are good.
 TM2_electrical_check_at_SMP.pdf 
  2820   Friday, June 20, 2025, 10:46 Jason ZhangSafe Module ParkingMaintenance  Annual electrical and mechanical inspection of Safe Module Parking  An annual electrical
and mechanical inspection was performed on
  
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  1221   Wednesday, May 04, 2016, 11:14 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Scope DecisionA meeting was held on May 4, 2016 to determine
the scope of the North Hot Cell project.
 The following was agreed upon by those
  
  1294   Friday, July 29, 2016, 14:27 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Measurements & Cleanup The North
Hot Cell was accessed today via the Ante
  
  1307   Friday, August 05, 2016, 14:13 Isaac EarleNorth Hot-CellDevelopment  Preparations for NHC Ventilation TestA hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room.  This will
  
  1315   Wednesday, August 10, 2016, 14:38 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Ventilation Test ResultsTesting was performed on August 9th on
the ISAC nuclear ventilation system to determine
if the existing ventilation system can achieve
  
  1345   Wednesday, September 07, 2016, 11:39 Isaac EarleNorth Hot-CellDevelopment  NHC North / South Wall Gap Measurements Measurements were taken today of
the NHC north/south wall gap at the location
where the NHC/TCS partition wall will be
  
  1353   Thursday, September 15, 2016, 11:05 Isaac EarleNorth Hot-CellDevelopment  NHC / SHC feedthrough panel removedThe sheet metal panel covering the NHC/SHC
feedthrough port was removed today using
a slide-hammer to pull out the concrete anchors
 original_panel.JPGpanel_removed.JPGtemp_panel.JPG 
  1395   Tuesday, November 08, 2016, 14:04 Isaac EarleNorth Hot-CellDevelopment  Interference check with TCS turbo pump and proposed NHC duct routingDavid Wang and I accessed the NHC today
to check if the proposed duct routing (IRH1618)
will interfere with servicing or replacement
 IMG_7577.JPGIMG_7583.JPGIMG_7582.JPG 
  1416   Friday, December 09, 2016, 14:58 Isaac EarleNorth Hot-CellDevelopment  NHC service area floor and top of roof block painted The concrete floor in the North Hot
Cell service area and the top of the NHC
roof block in the target hall have been painted
 NHC_SA_before_and_after.jpgNHC_roof_before_and_after.jpg 
  1421   Tuesday, January 17, 2017, 13:45 Isaac EarleNorth Hot-CellDevelopment  NHC ducting installed The new ducting section connecting
the existing duct termination in the TCS
space to the NHC partition wall has been
 IMG_7688.JPGIMG_7716.JPGIMG_7723.JPGIMG_7721.JPG 
  1423   Wednesday, January 18, 2017, 11:53 Isaac EarleNorth Hot-CellDevelopment  NHC partition wall installation complete The final panels of the partition
wall were installed today as per drawing
IRH1609.  Sealing, finishing, and painting
 IMG_7728.JPG 
  1435   Tuesday, February 07, 2017, 15:57 Isaac EarleNorth Hot-CellDevelopment  Ventilation Ducting Gasket Installed Lead gasket IRH1633 was installed
today according to assembly drawing IRH1618
Rev B.
  
  1437   Thursday, February 09, 2017, 14:07 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Shielding Window Gaskets Changed The North Hot Cell shielding window
gaskets have been changed and the window
has been filled with new oil.  Although
 23x 
  1440   Friday, February 24, 2017, 15:12 Isaac EarleNorth Hot-CellDevelopment  NHC interior walls/floor/ceiling re-finished, sealed, and paintedThe North Hot Cell interior walls, floor,
and ceiling were re-finished, sealed, and
painted by Omni Coating from Feb 6 - 17 under
 8x 
  1442   Tuesday, February 28, 2017, 17:51 Isaac EarleNorth Hot-CellDevelopment  NHC flanged ducting connection sealed The North Hot Cell ducting (IRH1617)
has been sealed with a bead of Sikaflex 1a
polyurethane construction sealant where the
 IMG_8012.JPG 