  1628   Wednesday, September 27, 2017, 09:02 Travis CaveConditioning StationStandard OperationTM2Ta#54Module move

 TM#2 with Ta#54 has been moved from the south hot cell to the conditioning station.

  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installed

Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130 in lbs).

  1626   Tuesday, September 26, 2017, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#54Electrical Check

Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details.

Attachment 1: TM2_Ta54_elec_chk_SHC.PDF
TM2_Ta54_elec_chk_SHC.PDF
  1625   Friday, September 22, 2017, 14:15 chad fisherSouth Hot-CellRepairTM2 TM2 containment box off

TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).

Attachment 1: 20170922_140546.jpg
20170922_140546.jpg
Attachment 2: 20170922_140927.jpg
20170922_140927.jpg
  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.

Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.

 Panels are installed back after the inspection.

See attachments

Attachment 1: TM2_serica_cap_inspection_002.JPG
TM2_serica_cap_inspection_002.JPG
Attachment 2: TM2_serica_cap_inspection_003.JPG
TM2_serica_cap_inspection_003.JPG
Attachment 3: TM2_serica_cap_inspection_004.JPG
TM2_serica_cap_inspection_004.JPG
Attachment 4: TM2_serica_cap_inspection_005.JPG
TM2_serica_cap_inspection_005.JPG
Attachment 5: TM2_serica_cap_inspection_008.JPG
TM2_serica_cap_inspection_008.JPG
  1623   Friday, September 22, 2017, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetElectrical Check

Electrical check of TM#2 after the insulator change on thursday september 21.

Attachment 1: TM2_notgt_elec_chk_shc_09212017.PDF
TM2_notgt_elec_chk_shc_09212017.PDF
  1622   Thursday, September 21, 2017, 16:26 Anders MjosSouth Hot-CellStandard OperationTM2 Inspection of Source Tray

Chad and Anders inspected the Source Tray today using the camera in the hot cell. A dark spot was observed on one of the four insulators separating the Extraction Electrode from the Ground Electrode. This could potentially influence the high leakage current. Some discolored areas were also observed in the Service Tray, but these was present when the module was built. See attachment for details.

Attachment 1: TM2_Source_Tray_EE_Insulator.pdf
TM2_Source_Tray_EE_Insulator.pdf TM2_Source_Tray_EE_Insulator.pdf
  1621   Thursday, September 21, 2017, 12:07 chad fisherSouth Hot-CellRepairTM2 Insulator Replacement

Insulators ITD0053 and 54 have been replaced. All fasteners torqued to 56 in lbs.

 

  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical Check

Electrical checks of TM#2 with Ta#53 and also with out a target.

Attachment 1: TM2_Ta53_elec_chk_shc.PDF
TM2_Ta53_elec_chk_shc.PDF
Attachment 2: TM2_Ta53_elec_chk_post_beam_shc.PDF
TM2_Ta53_elec_chk_post_beam_shc.PDF
Attachment 3: TM2_notgt_elec_chk_shc_09202017.PDF
TM2_notgt_elec_chk_shc_09202017.PDF
  1619   Wednesday, September 20, 2017, 13:38 chad fisherSouth Hot-CellRepairTM2 TM2 Insulator replacement

Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.

Attachment 1: 20170920_132813.jpg
20170920_132813.jpg
Attachment 2: 20170920_132820.jpg
20170920_132820.jpg
Attachment 3: 20170920_133244.jpg
20170920_133244.jpg
  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move

 TM#2 with Ta#53 has been moved from the west target station to the south hot cell.

  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator Maintenence

Entered hot cell to preform replacement of slave tong cable. Existing cable shows no signs of wear so it has been re-installed. A spare tong cable has been loaded into a spare tong while in the hot cell in preparation for next time this cable needs to be replaced.

  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved back to the silo from the conditioning station.

  1615   Wednesday, September 13, 2017, 16:13 David WangConditioning StationRepairTM3 TCS turbo pumps are started.

TCS and TM3 all vacuum pumps are started. Everything is fine.

  1614   Wednesday, September 13, 2017, 16:05 David WangConditioning StationRepairTM3 remove Tm3 service tray cover plate

TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo.

  1613   Wednesday, September 13, 2017, 10:05 David WangConditioning StationRepairTM3 Switch off TCS water system and vacuums

Preparing vent the TCS/TM3. We will remove TM3 service tray cover plate  after venting.

  1612   Friday, September 08, 2017, 14:08 David WangConditioning StationRepairTM3 TCS and TM3

TM3 is located at TCS and it is pumping down now. TCS water system has been started.  All TCS water lines for TM3 module internal cooling are bypassed and looped at TCS top ground plate. Water only supply to TCS high  current conductors.

  1611   Friday, September 08, 2017, 11:20 Travis CaveConditioning StationStandard OperationTM3no targetModule move

 TM#3 has been moved from the north east silo to the conditioning station.

  1610   Tuesday, September 05, 2017, 10:25 Travis CaveITEStandard OperationTM4UC#21Module move

 TM#4 with UC#21 has been moved from the conditioning station to the east target station.

  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.

Argon vent and disconnect TM4 at TCS.