Friday, March 18, 2016, 09:42, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 vacuum sysytem has been connected at TCS
|
TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far. |
Wednesday, October 14, 2015, 12:42, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been disconnected in ITW
|
Dan and I disconnected TM2 in ITW this morning. |
Thursday, February 25, 2016, 09:27, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW
|
TM2 has been disconnected in ITW (except vacuum lines). The vacuum system is still operating. |
Monday, March 21, 2016, 15:27, David Wang, Conditioning Station, Repair, TM2, , TM2 has been disconnected at TCS
|
TM2 vacuum system has been disconnected at TCS. Venting is in process now. |
Wednesday, May 25, 2016, 14:08, David Wang, ITW, Standard Operation, TM2, Ta#48, TM2 has been connected in ITW
|
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine. |
Thursday, June 08, 2017, 08:35, David Wang, Conditioning Station, Development, TM2, , TM2 gas line reconfiguration on the module top.
|
Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected on module top this Tuesday. It is leak free with helium spray on the top of module and service tray. |
Tuesday, August 14, 2012, 14:27, David Wang, ITW, Standard Operation, TM1, UCx, TM1connection in ITW
|
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far. |
Tuesday, June 19, 2012, 16:18, David Wang, ITW, Standard Operation, TM1, Ta38, TM1connected in ITW
|
We moved TM1 to ITW today, I connected TM1 to ITW, and started all turbo pumps this afternoon. TP4s is very difficult to bring to 38 KRMP now. I have to use soft start model and tried twice to get this pump started (1.5 hours). This pump always had a difficult start time during the past 2-3 runs. I talked with Friedhelm and we think it should be replaced after this run. I will issue an e-fault on this pump and try to get a new pump from vacuum group. It will take 2 hours to change this pump. I could do this job with another person help. Or, vacuum group could do it. Don can schedule a time for this job before next run. Anyway, it should work fine for this run. The water interlock check related to TM1 is done. I will do the rest before blocks on. All TM1 water signals are strong and good. All vacuum gauge readings are good so far(below5.0xe-5 torr).
|
Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW
|
TM 1 is in ITW now. All connections are done. The turbo pumps had been started this afternoon. The vacuum looks good so far. The water interlock check which related to TM1 are done. They are good. All TM1 water signals are visually checked and they are strong. The rest interlock check ( MCR XT page) will be finished before shielding blocks moving. The MAA is locked and ITE is ready for proton beam. |
Wednesday, November 14, 2012, 10:57, David Wang, ITW, Standard Operation, TM1, , TM1connected in ITW
|
I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job. |
Monday, April 20, 2015, 10:22, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, TM1 with UCx12 has been connected to CS and ready for conditioing.
|
The TH will be locked during the TM1 conditioning time due to an interference issue between CS HV cover and a gas analysis valve on top of TM1. A work permit has been issued for the conditioning job because of it. |
Thursday, September 17, 2015, 11:50, David Wang, Spent Target Vault, Repair, TM1, , TM1 window circuit leak check 
|
Leak check TM1 window circuit soldering stems inside service cap when module is located at NE silo. LD base LR 0.0xE-9atm.cc/sec. Only 1 second tiny amount helium sprayed on stems soldering joints . LD got a quick response to high E-7 atm.cc/sec.Test is repeated again with same result. See attachments |
Tuesday, March 29, 2016, 08:38, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 water lines helium pressure check at TCS    
|
TM1 water lines helium pressure check at TCS is done. 70 psi helium was applied to water circuits. Leak detector base leak rate 0.0 x E-9 atm.cc/sec, base pressure 0.0 x E-4 torr. The result shows as below:
Ta+ |
0.0 X E-9 atm.cc/sec |
3minutes stabilizing |
Ta- |
0.0 X E-9 atm.cc/sec |
3minutes stabilizing |
Tube- |
0.0 X E-9 atm.cc/sec |
3minutes stabilizing |
Tube+ |
0.0 X E-9 atm.cc/sec |
3minutes stabilizing |
MSP |
0.0 X E-9 atm.cc/sec |
3minutes stabilizing |
EE |
0.0X E-9 atm.cc/sec |
3minutes stabilizing |
HS |
not tested without caps. |
|
Window |
E-5 range,leak on stem as we knew before. |
10seconds to E-5 |
The results is good so far as we know the window line is leak on stem in service cap. The HS will be tested later with target on.
The service cap air to vacuum seals also have been checked. The PNG1 panel and side round panel close to shutter are leak. The o-rings on them need to be replaced.
On March 30th -2016, I doubled checked the air to vacuum seal on the TM1 service cap. The side round panel is leak free actually. The PNG1 panel is leak at the bottom side. Confirmed.
On march 31th-2016, The o-ring(1-1/ 2275) on TM1 PNG1 side panel has been replaced today. The o-ring slot and mating surfaces are cleaned, and new o-ring is installed. The panel is put back to TM1 and all bolts are tightened.
See attachments. |
Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW.
|
TM1 was disconnected in ITW this morning. Heat shield circuit is purged. |
Tuesday, June 30, 2015, 15:41, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW this morning.
|
TM1 was disconnected in ITW this morning. The ITW was vented with argon last night. |
Tuesday, November 04, 2014, 13:17, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, TM1 w/ ThO#1 ready
|
Tm1 with ThO#1 is buttoned up and ready for transport. |
Tuesday, April 05, 2016, 12:36, David Wang, ITW, Standard Operation, TM1, , TM1 vacuum system has been connected in ITW.
|
All turbo -pumps are started. |
Tuesday, January 15, 2013, 10:49, David Wang, ITW, Standard Operation, TM1, no target, TM1 vacuum system connection in ITW
|
I connected TM 1 vacuum system in ITW. The TM1 and ITW will be pumped out for shut down routine leak check. |
Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status
|
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight
Saturday June 25 2011
Pressure Service Cap (SC) 3E-6 T
Pressure Containment Box (CB) 6.6E-6 T
High voltage test to 40 kV, unfortunately, the pressure is not great so we stop at 40 kV
Pressure at the end of the day: 1650H was, P SC 2.6E-6T
P CB 6.6E-6 T
Sunday June 26 2011
Pressure P SC 1.6E-6T
P CB 6.6E-6 T
It seems we have a leak. The pressure does not drop in the CB over one day.
Today June 27 2011
Pressure P SC 1.2E-6T
P CB 6.6E-6 T
We leak check the target module and found two leaks, one on the ground electrode and one on the mounting plate cooling circuit.
This is a new one. We had test this line three times before and it was ok.
Action for tomorrow.
After CS vent,
Move TM1 to SHC
Survey
Connect LD to Mounting plate cooling circuit
Open Side panel and leak check.
Meeting at 0830H |
Thursday, April 06, 2017, 12:33, David Wang, Conditioning Station, Repair, TM1, , TM1 rust inpsection and removal
|
TM1 inside service cap surface and shielding plug surface are visually inspected yesterday. No rust has been found. I cleaned all rust on top of TM1 today. Rust on TM1 silo top plate are cleaned as well. |
|