Entry  Friday, March 18, 2016, 09:42, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 vacuum sysytem has been connected at TCS 
TM2 vacuum system has been connected at TCS. Started roughing pump. Everything is good so far.
Entry  Wednesday, October 14, 2015, 12:42, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been disconnected in ITW  
Dan and I disconnected TM2 in ITW this morning.
Entry  Thursday, February 25, 2016, 09:27, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW 
TM2 has been disconnected in ITW (except vacuum lines). The vacuum system is still operating.
Entry  Monday, March 21, 2016, 15:27, David Wang, Conditioning Station, Repair, TM2, , TM2 has been disconnected at TCS 
TM2 vacuum system has been disconnected at TCS. Venting is in process now.
Entry  Wednesday, May 25, 2016, 14:08, David Wang, ITW, Standard Operation, TM2, Ta#48, TM2 has been connected in ITW 
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine.
Entry  Thursday, June 08, 2017, 08:35, David Wang, Conditioning Station, Development, TM2, , TM2 gas line reconfiguration on the module top. TM2_gas_line_on_the_top_002.JPG
Reconfigured TM2 gas line on the module top. It matches with the febiad gas line we are using on service tray now. Facing the module, both of them should
be that right side line of two SST lines on feed-through. The gas line on TM2 was leak checked with a blind cap installed on service tray side and LD connected
on module top this Tuesday. It is leak free with helium spray on the top of module and service tray.
Entry  Tuesday, August 14, 2012, 14:27, David Wang, ITW, Standard Operation, TM1, UCx, TM1connection in ITW 
Connected TM1 in ITW,started 6 turbo pumps, and finished TM1 water interlock check . Every thing is good so far.
Entry  Tuesday, June 19, 2012, 16:18, David Wang, ITW, Standard Operation, TM1, Ta38, TM1connected in ITW 

 
  Normal
  0
  
   
   

  
   
   
  
  MicrosoftInternetExplorer4




st1\:*{behavior:url(#ieooui)
Entry  Tuesday, September 25, 2012, 14:33, David Wang, ITW, Standard Operation, TM1, Nb#7, TM1connected in ITW 
TM 1 is in ITW now. All connections are done. The turbo pumps had been started  this afternoon. The vacuum looks good so far. The water interlock check
which  related to TM1 are done. They are good. All TM1 water signals are visually  checked and they are strong.  The rest interlock check ( MCR
XT page) will be  finished before shielding blocks moving. The MAA is locked and ITE is ready for  proton beam.        
Entry  Wednesday, November 14, 2012, 10:57, David Wang, ITW, Standard Operation, TM1, , TM1connected in ITW 
I connected TM1 in ITW yesterday. Everything is good so far. Travis was with me when i did the job.
Entry  Monday, April 20, 2015, 10:22, David Wang, Conditioning Station, Standard Operation, TM1, UCx12, TM1 with UCx12 has been connected to CS and ready for conditioing. 
The TH will be locked during the TM1 conditioning time due to  an interference issue between CS HV cover and a gas analysis valve on top of TM1.
A work permit has been issued for the conditioning job because of it.
Entry  Thursday, September 17, 2015, 11:50, David Wang, Spent Target Vault, Repair, TM1, , TM1 window circuit leak check TM1_leak_soldering_stems_001.JPGTM1_leak_soldering_stems_003.JPG
 Leak check TM1 window circuit soldering stems inside service cap when module is located at NE silo. LD base LR 0.0xE-9atm.cc/sec.  Only 1
second tiny amount  helium sprayed on stems soldering joints . LD got a quick response to high E-7 atm.cc/sec.Test is repeated again with same result. 
See attachments
Entry  Tuesday, March 29, 2016, 08:38, David Wang, Conditioning Station, Standard Operation, TM1, , TM1 water lines helium pressure check at TCS TM1_PNG1_panel_o-ring_replacement_001.JPGTM1_PNG1_panel_o-ring_replacement_002.JPGTM1_PNG1_panel_o-ring_replacement_004.JPGTM1_PNG1_panel_o-ring_replacement_005.JPGTM1_PNG1_panel_o-ring_replacement_006.JPG
TM1 water lines helium pressure check at TCS is done. 70 psi helium was applied to water circuits. Leak detector base leak rate 0.0 x E-9 atm.cc/sec,
base pressure 0.0 x E-4 torr. The result shows as below:
 
Entry  Tuesday, October 14, 2014, 12:19, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW. 
TM1 was disconnected in ITW this morning. Heat shield circuit is purged.
Entry  Tuesday, June 30, 2015, 15:41, David Wang, ITW, Standard Operation, TM1, , TM1 was disconnected in ITW this morning. 
TM1 was disconnected in ITW  this morning. The ITW was vented with argon last night.
Entry  Tuesday, November 04, 2014, 13:17, chad fisher, South Hot-Cell, Standard Operation, TM1, ThO#1, TM1 w/ ThO#1 ready 
Tm1 with ThO#1 is buttoned up and ready for transport.
Entry  Tuesday, April 05, 2016, 12:36, David Wang, ITW, Standard Operation, TM1, , TM1 vacuum system has been connected in ITW. 
 All turbo -pumps are started.
Entry  Tuesday, January 15, 2013, 10:49, David Wang, ITW, Standard Operation, TM1, no target, TM1 vacuum system connection in ITW 
I connected TM 1 vacuum system in ITW. The TM1 and ITW will be pumped out for shut down routine leak check.
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight
Entry  Thursday, April 06, 2017, 12:33, David Wang, Conditioning Station, Repair, TM1, , TM1 rust inpsection and removal 
TM1 inside service cap surface and shielding plug surface are visually inspected yesterday. No rust has been found. I cleaned all rust on top of TM1 
today.  Rust on TM1 silo  top plate are cleaned as well.