  1865   Monday, February 11, 2019, 10:26 Isaac EarleSafe Module ParkingDevelopment  SMP shield box and vacuum vessel moved to Target Hall  On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical
 6x 
  1873   Thursday, February 21, 2019, 15:10 Isaac EarleSafe Module ParkingDevelopment  Seismic requirements for SMPDragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. 
  
  1903   Monday, April 01, 2019, 14:56 Isaac EarleSafe Module ParkingDevelopment  SMP shield box and vacuum vessel installed in final location Last week drilling of the additional
required holes in the SMP shield box was
completed in the Target Hall.  This
 20190401_101459.jpg20190401_110433.jpg20190401_144133.jpg20190401_110353.jpg 
  1904   Thursday, April 04, 2019, 14:49 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum vessel support roller friction checkWith the SMP vacuum vessel now installed
inside the shield box, a test was performed
to measure the torque required to rotate
 CRR_check_for_as-built_SMP_-_April_4_2019.pdf 
  1921   Wednesday, May 15, 2019, 16:06 Isaac EarleSafe Module ParkingDevelopment  SMP module support flange installed and leak checkedThe SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683.  Dow Corning 111 sealing
 20190515_094730.jpg20190515_094740.jpg20190515_103253.jpg20190515_103824.jpg 
  1944   Thursday, June 20, 2019, 15:09 Isaac EarleSafe Module ParkingDevelopment  SMP motor wiring inspected by electricianThe AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). 
  
  1946   Thursday, July 04, 2019, 08:57 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum system installed July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then
 20190703_122635.jpg20190703_122646.jpg20190703_122702.jpg 
  1955   Friday, July 26, 2019, 15:43 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum control system completed The SMP vacuum control system has
been wired and setup to be controlled from
EPICS.  Backing valve control (SMP:BV1)
 SMP_vacuum_system_EPICS_screen.png 
  1970   Friday, August 23, 2019, 14:27 Isaac EarleSafe Module ParkingDevelopment  SMP camera video cabling installed and tested Installation of the video lines for
the SMP cameras was completed yesterday according
to IRH1670 Rev B.  All four cameras
  
  1990   Monday, September 30, 2019, 11:27 Isaac EarleSafe Module ParkingDevelopment  SMP vacuum vessel modifications completedThe SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D.  In addition a tube stub was added
  
  2007   Tuesday, October 15, 2019, 16:42 Isaac EarleSafe Module ParkingDevelopment  SMP flange alignment tested using shield plug As a preliminary test in preparation
for SMP commissioning, one of the steel module
shield plugs was installed into the SMP to
 smp1.jpgsmp2.jpgsmp3.jpgsmp4.jpg 
  2010   Tuesday, October 22, 2019, 16:26 Isaac EarleSafe Module ParkingDevelopment  SMP shield box groundingA braided grounding strap was attached
to the aluminum gear box support on the SMP
shield box structure, and grounded by attaching
  
  2016   Monday, October 28, 2019, 12:00 Isaac EarleSafe Module ParkingDevelopment  SMP shielding attenuation measured & compared to theoretical valuesThe attenuation of the SMP shielding was
measured as part of SMP commissioning (Document-170404,
R1, Section 4, Test #8)
  
  2037   Thursday, December 12, 2019, 14:39 Isaac EarleSafe Module ParkingDevelopment  SMP assembly shifted 1.0" northThe SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity
  
  2196   Thursday, March 04, 2021, 16:30 Isaac EarleNorth Hot-CellDevelopment  NHC gas delivery lines leak checked The North Hot Cell gas delivery lines
(labeled 1, 2, and 3 on the hot and cold
side panels) were leak checked today. 
  
  2200   Monday, March 15, 2021, 13:01 Isaac EarleCraneDevelopment  Plate & pin lift assembly load testing (ITA6550)In mid-2020 design analysis was completed
on the steel plate & pin assemblies (ITA6550)
used to connect the ISAC target hall crane
 11x 
  68   Tuesday, January 10, 2012, 11:51 Grant MinorConditioning StationRepair  IMC at Cond. Station is VENTED - DO NOT PUT MODULE INHi Remote Handling,
The guage on the IMC circuit in the
Target Hall is reading atmosphere, and the
 IMC_Installation_and_Leak_Check_April_28_2011_011.jpg 
  129   Wednesday, June 20, 2012, 11:39 Grant MinorSouth Hot-CellDevelopmentTM3N/ATM3 Planned Activites at South Hot Cell Jun 20 to 29 2012

Normal
0




false
false
false
  
  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  