  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  720   Thursday, July 31, 2014, 08:08 chad fisherSouth Hot-CellStandard OperationTM3SiC#30SiC#30 Removed and inpectSiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not  yield
any obvious signs of damage.
 TM320140731_01.jpgTM320140731_02.jpgTM320140731_03.jpgTM320140731_04.jpg 
  724   Wednesday, August 06, 2014, 11:12 Travis CaveSouth Hot-CellStandard Operation SiC#30Spent target moveSiC#30 in pail #117 has been move to the
spent target vault and placed in spot 2C.
See attached PDF for details.
 Vault_Storage_August_6_2014.pdf 
  407   Wednesday, July 24, 2013, 08:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkElectrical check on TM#4 with SiC#29 has
been done. The reading of the magnet coil
and 60kV common is low at 750 ohms, normally
 TM#4_SiC#29_FEBIAD_Tgt_Elec_Chk.PDF 
  408   Wednesday, July 24, 2013, 14:40 Travis CaveConditioning StationStandard OperationTM4SiC#29module moveTM#4 with SiC#29 has been moved from the
south hot cell to the conditioning station
move went well.
  
  410   Thursday, July 25, 2013, 09:37 Travis CaveConditioning StationStandard OperationTM4SiC#29Electrical checkElectrical check of TM#4 with SiC#29 attached.
Results are pretty much the same as yesterday
for the coil to 60kV common, and anode to
 TM#4_SiC#29_FEBIAD_TgtElecChkCS_.PDF 
  414   Tuesday, July 30, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#29module moveTM#4 with SiC #29 has been moved from the
conditioning station to the east target station,
move went well.
  
  421   Thursday, August 15, 2013, 16:35 Anders MjosITERepairTM4SiC#29Leak found on Coil 1By
pressurizing the water lines with 70 psi
 ITE_Leak_Test_2013-08-14.pdf 
  422   Monday, August 19, 2013, 10:08 Anders MjosITERepairTM4SiC#29Leak CheckAll water circuits except Coil 1 were leak
checked by David and Anders. No obvious signals
were detected except some small possible
 ITE_Leak_Test_2013-08-19.pdf 
  451   Thursday, September 12, 2013, 09:29 Travis CaveITWStandard OperationTM4SiC#29module moveTM#4 with SiC#29 has been moved to the
south hot cell move went well.
  
  452   Thursday, September 12, 2013, 10:35 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 post beam electrical check
in the south hot cell see PDF for details.
 TM#4SiC#29FEBIADelechkpostbeam.PDF 
  479   Monday, September 30, 2013, 15:59 Bevan MossSouth Hot-CellStandard OperationTM4SiC#29Module move from SW Silo to SHC TM4 was move by myself and Grant.
Move went smoothly, no hang ups.
  
  483   Tuesday, October 01, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical checkTM#4 with SiC#29 electrical check post
beam see pdf for details.
 TM#4_elec_chk_SiC#29_SHC_post2.PDF 
  497   Tuesday, October 08, 2013, 13:11 Travis CaveSpent Target VaultStandard Operation SiC#29Spent target moveSiC#29 has been moved to the spent target
vault. The target was placed in Pail #109
and placed into slot 2B it was 24.7mS/hr
 Vault_Storage_October_8_2013.pdf 
  499   Tuesday, October 08, 2013, 14:58 Anders MjosSouth Hot-CellStandard Operation SiC#29Target to Heat Shield electrical shortThe SiC#29 CTL target has been taken apart
with the help of Isaac and Chad. Electrical
measurements were done between Target and
  
  372   Wednesday, May 29, 2013, 12:07 chad fisherSouth Hot-CellDevelopment SiC#28 RFQRFQ AutopsyMajor portions of the RFQ target have now
been sucessfully dismantled. More minor dismantling
with conclude this afternoon.
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  
  353   Tuesday, May 21, 2013, 11:38 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#3 with SiC#28 (RFQ Target) has been
moved from the east target station to the
south west silo.
  
  355   Wednesday, May 22, 2013, 10:41 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south west silo to the south hot cell.
  