1600
|
Thursday, August 17, 2017, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | 4/6 NHC roof blocks installed | Roof blocks IRH1641, IRH1642, IRH1643,
and IRH1644 have been fully assembled, labeled,
and installed as per drawing IRH1652. Fabrication |
7x |
1635
|
Friday, October 06, 2017, 11:12 |
Isaac Earle | North Hot-Cell | Development | | | NHC module port shield block and TCS vessel shield block installed | The NHC module port shield block
(IRH1645) and the TCS vessel shield block
(IRH1646) were installed yesterday in the |
    |
1636
|
Friday, October 06, 2017, 11:21 |
Isaac Earle | North Hot-Cell | Development | | | ISAC-1 active sump drain pipe modified | The 4" PVC drain line in the ISAC-1
active sump was modified so that the drain
pipe terminates below the low level water |
  |
1664
|
Friday, December 01, 2017, 16:42 |
Isaac Earle | North Hot-Cell | Repair | | | NHC manipulator service visit | Pete Dudley, manipulator service technician
from CRL, was on site from Nov 27-30 to service
the NHC Model N manipulators (See E-log entry |
 |
1738
|
Thursday, June 21, 2018, 17:15 |
Isaac Earle | North Hot-Cell | Development | | | Motorla CP200 radio with throat mic tested in NHC | A Motorla CP200 portable two-way
radio was tested today for use inside the
ISAC hot cells. A High Technology Communications |
|
1756
|
Thursday, July 19, 2018, 14:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals - connector and wiring details | Installation of the diagnostic connections
between the NHC hot and cold sides has been
completed. The cable bundle was prepared |
|
1761
|
Wednesday, August 01, 2018, 09:47 |
Isaac Earle | North Hot-Cell | Development | | | NHC diagnostic signals and control panel tested | On July 30th the NHC diagnostic
signals were tested:
- 9 pin CPC: a shorting plug was |
|
1780
|
Wednesday, September 12, 2018, 15:22 |
Isaac Earle | North Hot-Cell | Development | | | NHC air and gas supply lines - test and leak check | Testing was completed today on the NHC
air and gas supply lines. For each
line a Staubli plug was installed on the |
|
1781
|
Wednesday, September 12, 2018, 15:30 |
Isaac Earle | North Hot-Cell | Development | | | Installation of NHC operator-level lighting completed | Installation of of operator-level
lighting in the NHC was completed today according
to drawing IRH1801. 2" x 2" |
  |
1782
|
Thursday, September 13, 2018, 16:57 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding and mili-ohm testing | The
following equipment has been connected to
the building ground located in the Target |
|
1825
|
Thursday, November 22, 2018, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC design approved by High Voltage Engineer | To satisfy RS 101 from the NHC requirements
specification (Document-131915) Tomislav
Hurskovec was consulted regarding high voltage |
|
1839
|
Monday, December 10, 2018, 15:31 |
Isaac Earle | North Hot-Cell | Development | | | NHC remote connection testing with manipulators | The following tests have been successfully
completed using the NHC manipulators:
Ventilation pre-filter |
|
1841
|
Tuesday, December 18, 2018, 11:13 |
Isaac Earle | North Hot-Cell | Development | | | NHC manipulator slave-end swap, RH test, and various other work | The following
North Hot Cell work was completed over the
last week under work permit I2018-12-12-1: |
|
1847
|
Friday, January 04, 2019, 14:38 |
Isaac Earle | North Hot-Cell | Development | | | NHC cameras tested | The NHC module support flange cameras (4
total) as well as the NHCSA camera were tested
today and confirmed to be working properly. |
  |
1857
|
Friday, January 11, 2019, 13:59 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor selection decision | SMP drivetrain design work is currently
underway. Alejandro has selected a
suitable 1200:1 reducer which will give a |
|
1859
|
Friday, January 18, 2019, 10:26 |
Isaac Earle | North Hot-Cell | Development | | | NHC sealing improvements and repeat of RH test for LED lights | The following NHC development work was
completed under WP I2019-01-09-4:
Location of RH feature |
|
1860
|
Monday, January 21, 2019, 16:27 |
Isaac Earle | North Hot-Cell | Development | | | NHC in-cell camera wired to right side monitor | The NHC right side monitor has been
wired to display the signal from the in-cell
camera. This was tested using a snake |
|
1864
|
Thursday, January 31, 2019, 14:16 |
Isaac Earle | North Hot-Cell | Development | | | NHC grounding approval | Franco Mammarella was consulted regarding
electrical grounding of the NHC design (RS103
of Document-131915). After discussing |
|
1865
|
Monday, February 11, 2019, 10:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel moved to Target Hall | On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical |
6x |
1873
|
Thursday, February 21, 2019, 15:10 |
Isaac Earle | Safe Module Parking | Development | | | Seismic requirements for SMP | Dragan Mitrovic, TRIUMF structural engineer,
was consulted earlier this week regarding
seismic requirements for the SMP assembly. |
|