  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module movedTM#2 with the old SiC #35 has been moved
from ITW to the south hot cell.
  
  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical CheckElectrical check of TM#2 with the SiC#35 
post beam run. See attached PDF for details.
 TM2_elechk_SiC35_postbeam.PDF 
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target moveOn November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for
 Vault_Storage_November_24_2016.pdf 
  1777   Thursday, September 06, 2018, 10:25 Travis CaveSpent Target VaultStandard Operation SiC#34, Ta#45,46,47, 50Spent Target Move Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault.
  
  1360   Friday, September 23, 2016, 08:55 Travis CaveConditioning StationStandard OperationTM4SiC#34Electrical ChecksThe bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell
 TM4_elechk_SiC34_SHC.PDF 
  1361   Saturday, September 24, 2016, 11:23 Anders MjosConditioning StationStandard OperationTM4SiC#34Conditioning SiC#34Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15:
RGA on for heater conditioning. (kept off
 SiC#34.docxTCS-2016-09-22_SiC#34.rgaTCS-2016-09-24_SiC#34.rga 
  1364   Tuesday, September 27, 2016, 09:13 Travis CaveITEStandard OperationTM4SiC#34module movedTM#4 with SiC #34 has been moved to the
east target station.
  
  1374   Thursday, October 20, 2016, 14:17 Anders MjosITERepairTM4SiC#34HV enclosure inspection The HV enclosure and module connections
were inspected by David and Anders on Wednesday
19th in an attempt to find any HV problems
 SiC#34_Dose_Map_Target_Pit.pdfSiC#34_Dose_Measurements.xlsx 
  1392   Monday, November 07, 2016, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#34Spent Target moveSpent SiC#34 was moved on the 3rd of November
and  placed in the spent target vault.
See attached pdf for details.
 Vault_Storage_November_3_2016.pdf 
  1273   Wednesday, July 06, 2016, 09:16 chad fisherSouth Hot-CellStandard OperationTM2SiC#33Ta#48 removed SiC#33 installedTa#48 has been removed from TM2 and SiC#33
installed.
  
  1275   Wednesday, July 06, 2016, 13:38 Travis CaveConditioning StationStandard OperationTM2SiC#33module movedTM#2 with SiC#33 has been moved from the
south hot cell to the conditioning station.
  
  1277   Wednesday, July 06, 2016, 15:23 Anders MjosConditioning StationStandard OperationTM2SiC#33Conditioning SiC#33 Wednesday, July 06, 2016, 15:23:
RGA on. IGs on

Friday, July 08, 2016, 17:07:
 SiC#33.docxTCS-2016-07-06-SiC#33.rga 
  1281   Tuesday, July 12, 2016, 09:59 Travis CaveITWStandard OperationTM2SiC#33module movedTM#2 with SiC#33 has been moved from the
conditioning station to the west target station.
  
  1327   Tuesday, August 23, 2016, 10:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#33module movedTM#3 with SiC#33 has been moved from the
west station to the south hot cell.
  
  1328   Tuesday, August 23, 2016, 13:31 chad fisherSouth Hot-CellStandard OperationTM2SiC#33SiC#33 RemovedSiC#33 has been removed from TM2.   
  1335   Wednesday, August 24, 2016, 14:37 Anders MjosSouth Hot-CellStandard Operation SiC#33PIE The target was inspected by Anders
and Chad. The target was in good condition
as can be seen on the photos on DocuShare.
  
  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target moveSiC#33 was placed into pail #141 which
in turn was placed into slot 2B of the vault.
I was 295mS/hr upon removal from the south
 Vault_Storage_August_25_2016.pdf 
  1105   Monday, October 19, 2015, 11:53 chad fisherSouth Hot-CellStandard OperationTM2SiC#32SiC#32 installed on TM2SiC#32 has been installed on TM2. High
current fasteners torqued to 130 in lbs.
  
  1106   Monday, October 19, 2015, 15:52 Anders MjosSouth Hot-CellStandard OperationTM2SiC#32Electrical and leak check An electrical check was completed
by Travis C and Anders M. Note ~250 kOhm
between Target and 60 kV common. Leak check
 ITW-TM2-SiC#32-HP-FEBIAD_Electrical_Check_SHC_(pre).pdf 
  1107   Tuesday, October 20, 2015, 10:18 Travis CaveITWStandard OperationTM2SiC#32Module movedTM#2 with SiC#32 has been moved from the
south hot cell to the west target station.
  