ID Date Author Category Type Module Target/Numberdown Subject
  1651   Tuesday, October 24, 2017, 11:58 Travis CaveITEStandard OperationTM4SiC#37Module move

 TM#4 with SiC#37 has been moved from the conditioning station to the east target station. A measurement was taken on TM#4 as it was being removed from the conditioning station, the location was on the side of the service tray access panel approx one metre away and the cover fully exposed, the reading was 750uSV/hr.

  1652   Thursday, October 26, 2017, 09:56 Anders MjosITERepairTM4SiC#37Leak on multi pin connector feedthrough

On maintenance day Tuesday, the roughing of the target station could not go below 1.5 Torr. A brief troubleshooting on Tuesday was unsuccessful in determining the cause. Leak checking continued on Wednesday by David and Anders. A leak was finally found on the multi pin connector feedthrough due to the seal between the connector and flange on top of the nylon insulator. Upon re-tightening the connector, the leak could be stopped and the module pumped down to allow starting of turbo pumps.

  1685   Tuesday, February 13, 2018, 13:54 Anders MjosITEStandard OperationTM4SiC#37Target module disconnected

TM disconnected by David and Yasmine Feb 8th

  1706   Tuesday, May 01, 2018, 11:12 Travis CaveITEStandard OperationTM4SiC#37Module move

 TM#4 with SiC#37 has been moved from the East Target Station to the South Hot cell.

  1707   Tuesday, May 01, 2018, 13:40 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check

 Electrical check of TM#4 with SiC#37 attached post beam. A short was found between the Einzel Lens and Chassis. See attached PDF for details.

Attachment 1: TM4_electrical_check_SiC37_post_beam.pdf
TM4_electrical_check_SiC37_post_beam.pdf
  1725   Monday, May 28, 2018, 14:06 Travis CaveSpent Target VaultStandard Operation SiC#37Spent Target Move

 SiC#37 has been moved from the South Hot Cell to the Spent Target Vault. It was placed in Pail #165 and put in spot 3B of the vault and it measured 25.8mSv/hr upon removal from the hot cell. See the attached PDF for details

Attachment 1: Target_Index_2018-05-28.pdf
Target_Index_2018-05-28.pdf
  1550   Tuesday, June 06, 2017, 13:42 chad fisherSouth Hot-CellStandard OperationTM2SiC#36Ta#51 removed SiC#36 installed

This afternoon Ta#51 was removed from TM2 and SiC#36 installed.

All new fasteners used. High current fasteners torqued to 130 in lbs.

 

 

  1557   Tuesday, June 13, 2017, 09:57 Travis CaveITWStandard OperationTM2SiC#36module moved

TM#2 with SiC#36 has been moved from the conditioning station to the west target station.

  1589   Tuesday, August 01, 2017, 14:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#36Electrical Check

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

Attachment 1: TM2_SiC36_SHC_elec_chk.PDF
TM2_SiC36_SHC_elec_chk.PDF
Attachment 2: TM2_SiC36_Postbeam_SHC_elec_chk.PDF
TM2_SiC36_Postbeam_SHC_elec_chk.PDF
  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move

 The spent SiC#36 has been moved from the south hot cell to the spent target vault.

Attachment 1: Vault_Storage_August_3_2017.pdf
Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf Vault_Storage_August_3_2017.pdf
  1597   Tuesday, August 15, 2017, 09:27 Anders MjosSouth Hot-CellStandard OperationTM2SiC#36Electrical Check of target in SHC

Travis Cave wrote:

The electrical check of TM#2 with SiC#36 attached. Post beam at the south hot cell. See attached results allow the before beam electrical check results are posted here as well.

by David and Chad after target removed from module:

Anode to target @500V - 65Kohm
Anode to HS - dead short
Target to HS@500V -62Kohm.

  1380   Monday, October 24, 2016, 14:44 chad fisherSouth Hot-CellStandard OperationTM2SiC#35SiC#35 installed

Sic#35 has been installed onto TM2. High current fasteners torqued to 130 in lbs.

Mating of the 9 pin connector was extremely problematic but in the end I was able to get it to mate properly. Noticed left (when facing module in hot cell) febiad coil left twisted a bit when torqued up.

Attachment 1: 20161024_141155.jpg
20161024_141155.jpg
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Checks

Results of the electrical check of TM#2 with no target after the repair and with the SiC#35 mounted on the module.

Attachment 1: TM2_elechk_notgt_SHC_repair.PDF
TM2_elechk_notgt_SHC_repair.PDF
Attachment 2: TM2_elechk_SiC35_SHC.PDF
TM2_elechk_SiC35_SHC.PDF
  1398   Tuesday, November 22, 2016, 10:45 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35module moved

TM#2 with the old SiC #35 has been moved from ITW to the south hot cell.

  1399   Tuesday, November 22, 2016, 11:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical Check

Electrical check of TM#2 with the SiC#35  post beam run. See attached PDF for details.

Attachment 1: TM2_elechk_SiC35_postbeam.PDF
TM2_elechk_SiC35_postbeam.PDF
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target move

On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details.

Attachment 1: Vault_Storage_November_24_2016.pdf
Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf Vault_Storage_November_24_2016.pdf
  1777   Thursday, September 06, 2018, 10:25 Travis CaveSpent Target VaultStandard Operation SiC#34, Ta#45,46,47, 50Spent Target Move

 Targets SiC#34 , Ta#45,46,47,50 have been moved from the spent target vault to the mini vault.

  1360   Friday, September 23, 2016, 08:55 Travis CaveConditioning StationStandard OperationTM4SiC#34Electrical Checks

The bundle of electrical checks, first one is the Iglis that failed, the second is the everything passed at the hot cell and the third is a the conditioning station under vacuum.

Attachment 1: TM4_elechk_SiC34_SHC.PDF
TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF TM4_elechk_SiC34_SHC.PDF
  1361   Saturday, September 24, 2016, 11:23 Anders MjosConditioning StationStandard OperationTM4SiC#34Conditioning SiC#34

Conditioning by ISAC operations

Saturday, September 24, 2016, 11:15: RGA on for heater conditioning. (kept off during HV conditioning)


Sunday, September 25, 2016, 07:44: TGHT and TBHT voltage jumps during heater ramping. Likely contact between target and heat shield. Contacted ISAC operations and asked to abort ramping at current values. TGHT/TBHT 500 /270 A


Monday, September 26, 2016, 08:22: ISAC operations resuming ramping to 550 A. Corrected TGHT voltage at ISAC TS was ~6.2 V at 580 A. Expected voltage at TCS would then be 6.2 + (3.4+2.9)E-3*580 = 9.9 V. Limit set at 9.5 V.

Monday, September 26, 2016, 09:09: Increased TGHT voltage limit to 9.6 V to allow it to reach 550 A.

Monday, September 26, 2016, 10:17: Voltage limit increased to 10.2 V which allowed the current to go to 575 A


Tuesday, September 27, 2016, 08:08: Conditioning complete. Ran at 575 / 270 A and 47 kV for about 1 hour. Conditioned cold to 49 kV.

Attachment 1: SiC#34.docx
Attachment 2: TCS-2016-09-22_SiC#34.rga
Attachment 3: TCS-2016-09-24_SiC#34.rga
  1364   Tuesday, September 27, 2016, 09:13 Travis CaveITEStandard OperationTM4SiC#34module moved

TM#4 with SiC #34 has been moved to the east target station.

ELOG V2.9.2-2455