ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
1651
|
Tuesday, October 24, 2017, 11:58 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the conditioning station to the east target
station. A measurement was taken on TM#4 |
|
1652
|
Thursday, October 26, 2017, 09:56 |
Anders Mjos | ITE | Repair | TM4 | SiC#37 | Leak on multi pin connector feedthrough | On maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday |
|
1685
|
Tuesday, February 13, 2018, 13:54 |
Anders Mjos | ITE | Standard Operation | TM4 | SiC#37 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th |
|
1706
|
Tuesday, May 01, 2018, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#37 | Module move | TM#4 with SiC#37 has been moved from
the East Target Station to the South Hot
cell. |
|
1707
|
Tuesday, May 01, 2018, 13:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#37 | Electrical Check | Electrical check of TM#4 with SiC#37
attached post beam. A short was found between
the Einzel Lens and Chassis. See attached |
|
1725
|
Monday, May 28, 2018, 14:06 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#37 | Spent Target Move | SiC#37 has been moved from the South
Hot Cell to the Spent Target Vault. It was
placed in Pail #165 and put in spot 3B of |
|
1550
|
Tuesday, June 06, 2017, 13:42 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Ta#51 removed SiC#36 installed | This afternoon Ta#51 was removed from TM2
and SiC#36 installed.
All new fasteners used. High current |
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved | TM#2 with SiC#36 has been moved from the
conditioning station to the west target station. |
|
1589
|
Tuesday, August 01, 2017, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check | The electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam |
 |
1593
|
Thursday, August 03, 2017, 15:02 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#36 | Spent Target Move | The spent SiC#36 has been moved from
the south hot cell to the spent target vault. |
|
1597
|
Tuesday, August 15, 2017, 09:27 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | SiC#36 | Electrical Check of target in SHC |
|
|
1380
|
Monday, October 24, 2016, 14:44 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#35 | SiC#35 installed | Sic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was |
|
1382
|
Monday, October 24, 2016, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Checks | Results of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module. |
 |
1398
|
Tuesday, November 22, 2016, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | module moved | TM#2 with the old SiC #35 has been moved
from ITW to the south hot cell. |
|
1399
|
Tuesday, November 22, 2016, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | SiC#35 | Electrical Check | Electrical check of TM#2 with the SiC#35
post beam run. See attached PDF for details. |
|
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move | On November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for |
|
1777
|
Thursday, September 06, 2018, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34, Ta#45,46,47, 50 | Spent Target Move | Targets SiC#34 , Ta#45,46,47,50 have
been moved from the spent target vault to
the mini vault. |
|
1360
|
Friday, September 23, 2016, 08:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#34 | Electrical Checks | The bundle of electrical checks, first
one is the Iglis that failed, the second
is the everything passed at the hot cell |
|
1361
|
Saturday, September 24, 2016, 11:23 |
Anders Mjos | Conditioning Station | Standard Operation | TM4 | SiC#34 | Conditioning SiC#34 | Conditioning by ISAC operations
Saturday, September 24, 2016, 11:15:
RGA on for heater conditioning. (kept off |
  |
1364
|
Tuesday, September 27, 2016, 09:13 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#34 | module moved | TM#4 with SiC #34 has been moved to the
east target station. |
|