Entry  Friday, February 14, 2025, 10:48, David Wang, South Hot-Cell, Standard Operation, TM2, No target, TM2 has been moved from SHC to TCS.  

TM2 has been moved from SHC to TCS successfully. Travis and I did the move.

Entry  Tuesday, January 11, 2022, 11:51, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from NHC to SMP. 

TM2( no target ) has been moved  from NHC to SMP.  The moving is smooth and successful.

Entry  Wednesday, October 14, 2015, 12:44, David Wang, ITW, Standard Operation, TM2, ZrC#7, TM2 has been moved from ITW to SHC 

Bill and I remotely removed TM2 from ITW to SHC. The move is smooth.

Entry  Monday, January 10, 2022, 12:38, David Wang, North Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITW to NHC. 

Travis and Nadia moved TM2 from ITW to NHC this morning. The move is smooth and successful.

Entry  Tuesday, October 01, 2024, 10:55, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 has been moved from ITE to SHC. 

TM2 has been moved from ITE to SHC. Peter did the move with Travis on help.  The move is smooth.

Entry  Friday, January 04, 2019, 08:48, David Wang, ITW, Standard Operation, TM2, , TM2 has been disconnected in ITW. UCx25_TM2_disconnection_checklist.pdf

TP1, TP2 are still connected for next week leak check. All water lines in TM2 are purged with 80 psi air, each for 5 minutes.

TP1 and TP2 had been disconnected. TM2 with UCx 25  disconnection checklist, See attachment.

Entry  Wednesday, August 14, 2019, 08:55, David Wang, ITE, Standard Operation, TM2, , TM2 has been disconnected in ITE. 

TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time.

Entry  Monday, August 29, 2016, 13:34, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been disconnected at TCS 

I stopped TCS water pumps and vacuum pumps also.   TM2 and TCS will be vented tomorrow morning.

Entry  Tuesday, July 03, 2018, 14:42, David Wang, ITW, Standard Operation, TM2, Nb#8, TM2 has been connected to ITW. Nb#4_Module_connection_checklist.pdf

TM2 has been connected to ITW. All turbo pumps are started. See attachment for connection checklist.

Entry  Tuesday, June 22, 2021, 15:35, David Wang, ITW, Standard Operation, TM2, UCX33#, TM2 has been connected it ITW.  

TM2 has been connected it ITW.  All turbo pumps are started.

Entry  Tuesday, June 13, 2017, 13:41, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW. 

Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are double checked. Module connection checklist is finished.  All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning when the ITW vacuum is good enough.

Entry  Tuesday, November 14, 2017, 14:34, David Wang, ITW, Standard Operation, TM2, Ta#55, TM2 has been connected in ITW. 

TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine.

Entry  Tuesday, July 12, 2016, 12:40, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW 

All turbo-pumps are started. Everything is good so far.

Entry  Tuesday, November 24, 2020, 12:56, David Wang, ITW, Standard Operation, TM2, Nb#9, TM2 has been connected in ITW TM2_Nb#9_module_connection_checklist.pdf

TM2 has been connected to ITW. Turbo pumps are stared. ITW pumping down is fine so far.

Entry  Wednesday, February 01, 2017, 12:23, David Wang, ITE, Standard Operation, TM2, , TM2 has been connected in ITE. 

TM2 has been connected in ITE. The SST window water lines in ITE can not be connected properly to TM2. The water line connector on TM2 window is 90 degree CCW installed in direction comparing to TM4.This caused the problem. Solution: Two piece of flexible lines and extra male QC adapters have been used to fix this issue.  HV cover and HV fence in ITE work  with TM2. Other connections are good as well.

Entry  Wednesday, May 22, 2019, 11:50, David Wang, ITE, Standard Operation, TM4, , TM2 has been connected in ITE. Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf

TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.

See attachment for connection checklist.

Entry  Friday, August 16, 2019, 08:46, David Wang, ITE, Standard Operation, TM4, ZrC #8., TM2 has been connected in ITE. 

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

Entry  Monday, October 07, 2019, 14:03, David Wang, ITE, Standard Operation, TM2, Ta 59, TM2 has been connected in ITE. Ta_59_TM2_ITE__connection_checklist..pdf

Tm2 with Ta 59 has eben connected in ITE. Turbo pumps are started. See checklist

Entry  Friday, October 04, 2019, 16:43, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS. 

TM2 has been connected at TCS this morning. helium pressure test on Tm2 HS line is done. No leak.

Entry  Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS 

I connected TM2 to TCS and started water system.