  RH-ISAC, Page 48 of 138  Not logged in ELOG logo
  ID Datedown Author Category Type Module Target/Number Subject Text Attachments
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module moveTM#2 with UC#25 has been moved from the south
hot cell to the conditioning station.
  
  1812   Tuesday, October 30, 2018, 10:50 Travis CaveITWStandard OperationTM2nSiC#1Modules moved Modules were moved, ITW EX2 was moved
from the conditioning station to the west
target station and TM#2 ,with nSiC#1, 
  
  1811   Monday, October 29, 2018, 10:43 David WangConditioning StationRepair  ITW exit 2 leak check at TCS.I did a leak check this morning on exit
2 module at TCS. LD base  leak rate
is 4.00XE-9atm.cc/sec, Base pressure is 0.00
  
  1810   Friday, October 26, 2018, 09:44 Travis CaveConditioning StationStandard Operation  Exit Module movedThe west exit #2 module has been moved from
the south hot cell to the conditioning station.
  
  1809   Thursday, October 25, 2018, 11:03 chad fisherSouth Hot-CellRepair  Exit 2 WestActuator arms, lemos, lemos and banana
plug block have been disconnected in preparation
for raising of the service tray. Aaron has
 8x 
  1808   Tuesday, October 23, 2018, 11:32 David WangSouth Hot-CellMaintenance  ITW RV4S leak check.ITW RV4S (A and B) are leak checked. They
are good.  
  
  1807   Tuesday, October 23, 2018, 10:53 chad fisherSouth Hot-CellRepair  Exit 2 EastCover 1 was removed from the exit module.
Confirmed with David that the actuator rod
that needed to be disconnected was the far
 20181023_104541.jpg 
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.TM2(SiC nano) has been disconnected in
ITW. See attachment
 TM2_SiC_nano_disconnection_in_ITW.pdf 
  1805   Monday, October 22, 2018, 14:05 Travis CaveITWRepair  Module move ITW Exit #2 has been moved from the
west station to the south hot cell for a
bellows repair.
  
  1804   Wednesday, October 10, 2018, 10:50 Travis CaveConditioning StationStandard OperationTM4Ta#57Electrical Check The various electrical check done
on TM#4 after the UC run and before the start
of the Ta run.
 TM#4_UC#24_Electrical_Check_SHC.pdfTM#4_Elec_Chk_No_Target_Oct-3-2018.pdfTM#4_Elec_Chk_SHC_Ta#57.pdf 
  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.TM4 has been connected in ITE. see attachment.  TM4_with_TA#56_connection_in_ITE.pdf 
  1802   Tuesday, October 09, 2018, 13:46 Travis CaveITEStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the conditioning station to the east target
station.
  
  1801   Tuesday, October 09, 2018, 12:32 David WangConditioning StationRepairTM4 TM4 steers 4 pin feedthrough CF flangeTM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with
  
  1800   Friday, October 05, 2018, 14:41 Travis CaveSpent Target VaultStandard Operation UC#24Spent Target Move UC#24 has been moved from the south
hot cell to the spent target vault. The target
is in pail #171 and placed in spot 4C. See
 Target_Index_2018-10-05.pdf 
  1799   Wednesday, October 03, 2018, 14:16 David WangSouth Hot-CellStandard OperationTM4Ta #57Leak check TM4 Lp Ta# 57 at SHC.Tried to leak check TM4 Ta57# at TCS. LD
failed to pump down properly at fine range.
It always tripped at 4 torr. I cheeked all
  
  1798   Tuesday, October 02, 2018, 09:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#24Module move TM#4 with UC#24 has been moved from
the east target station to the south hot
cell.
  
  1797   Tuesday, October 02, 2018, 09:49 David WangITEStandard OperationTM4UCx 24#TM4 was disconnected in ITE.TM4 was disconnected in ITE yesterday.
See attachment for checklist.
 TM2_UCx_24#_disconnection_in_ITE..pdf 
  1796   Thursday, September 27, 2018, 13:58 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo. This will
be its new home after the silo switcher-roo.
  
  1795   Wednesday, September 26, 2018, 07:14 David WangConditioning StationRepairTM3 TM3 HV test at TCS.I did a HV test on TM3 at TCS yesterday.
HV Ramp up speed: 1KV per 5 minutes when
below 30KV,1KV per 10 minutes from 30-36KV.
  
  1794   Tuesday, September 25, 2018, 08:48 chad fisherSouth Hot-CellMaintenance  Window leak and torqueThe south hot cell window has been found
to be leaking oil. Upon inspection yesterday
I found that the bolts compressing the gasket
 hot_cell_window_gasket_change_procedure.pdf 