1813
|
Wednesday, October 31, 2018, 14:20 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | UC#25 | Module move |
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station. |
|
1812
|
Tuesday, October 30, 2018, 10:50 |
Travis Cave | ITW | Standard Operation | TM2 | nSiC#1 | Modules moved |
Modules were moved, ITW EX2 was moved from the conditioning station to the west target station and TM#2 ,with nSiC#1, was moved from the west target station to the south hot cell. |
|
1811
|
Monday, October 29, 2018, 10:43 |
David Wang | Conditioning Station | Repair | | | ITW exit 2 leak check at TCS. |
I did a leak check this morning on exit 2 module at TCS. LD base leak rate is 4.00XE-9atm.cc/sec, Base pressure is 0.00 X E-4 torr. All seals, bellows, and flanges are checked. The new FC5 bellow is good. There is a big leak up to 2X E-6 atm.c/sec has been found on IG1S side panel . The panel itself will be replaced this time. Machine shop is working on it.. Two small leaks in E-9 atm.cc/sec range have been found on the o-ring between service cap steel welding frame and the whole cap top cover plate in different location . All bolts on the top plate pressing down the o-ring are very tight. I can do nothing on them. However, I sprayed some vacuum seal around the leak area. The leaks are small and close to ITE TP1S. I don not think we have to replace it at this moment. Basically, The module is good to move to ITW tomorrow morning. |
|
1810
|
Friday, October 26, 2018, 09:44 |
Travis Cave | Conditioning Station | Standard Operation | | | Exit Module moved |
The west exit #2 module has been moved from the south hot cell to the conditioning station. |
|
1809
|
Thursday, October 25, 2018, 11:03 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 West |
Actuator arms, lemos, lemos and banana plug block have been disconnected in preparation for raising of the service tray. Aaron has pictures |
Attachment 1: 20181025_102518.jpg
|
|
Attachment 2: 20181025_102526.jpg
|
|
Attachment 3: 20181025_104351.jpg
|
|
Attachment 4: 20181025_104508.jpg
|
|
Attachment 5: 20181025_104717.jpg
|
|
Attachment 6: 20181025_105427.jpg
|
|
Attachment 7: 20181025_105601.jpg
|
|
Attachment 8: 20181025_104225.jpg
|
|
|
1808
|
Tuesday, October 23, 2018, 11:32 |
David Wang | South Hot-Cell | Maintenance | | | ITW RV4S leak check. |
ITW RV4S (A and B) are leak checked. They are good. |
|
1807
|
Tuesday, October 23, 2018, 10:53 |
chad fisher | South Hot-Cell | Repair | | | Exit 2 East |
Cover 1 was removed from the exit module. Confirmed with David that the actuator rod that needed to be disconnected was the far left )as viewed by the hot cell operator). The fastener for this rod was un-accessible from this side. Cover 1 was re-installed (two bolts left loose) and cover 2 was removed. fastener holding the actuator together was removed and luckily it does have a remote start. |
Attachment 1: 20181023_104541.jpg
|
|
|
1806
|
Tuesday, October 23, 2018, 10:45 |
David Wang | ITW | Standard Operation | TM2 | SiC nano | TM2 was disconnected in ITW. |
TM2(SiC nano) has been disconnected in ITW. See attachment |
Attachment 1: TM2_SiC_nano_disconnection_in_ITW.pdf
|
|
|
1805
|
Monday, October 22, 2018, 14:05 |
Travis Cave | ITW | Repair | | | Module move |
ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair. |
|
1804
|
Wednesday, October 10, 2018, 10:50 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#57 | Electrical Check |
The various electrical check done on TM#4 after the UC run and before the start of the Ta run. |
Attachment 1: TM#4_UC#24_Electrical_Check_SHC.pdf
|
|
Attachment 2: TM#4_Elec_Chk_No_Target_Oct-3-2018.pdf
|
|
Attachment 3: TM#4_Elec_Chk_SHC_Ta#57.pdf
|
|
|
1803
|
Wednesday, October 10, 2018, 07:52 |
David Wang | ITE | Standard Operation | TM4 | Ta#57 | TM4 has been connected in ITE. |
TM4 has been connected in ITE. see attachment. |
Attachment 1: TM4_with_TA#56_connection_in_ITE.pdf
|
|
|
1802
|
Tuesday, October 09, 2018, 13:46 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#57 | Module move |
TM#4 with Ta#57 has been moved from the conditioning station to the east target station. |
|
1801
|
Tuesday, October 09, 2018, 12:32 |
David Wang | Conditioning Station | Repair | TM4 | | TM4 steers 4 pin feedthrough CF flange |
TM4 Steers 4 pin feedthrough CF flange is replaced due an inside feed through insulator broken. CF 25 cooper seal is replaced with a new one as well. Travis did anelectrical check. after replacement. Everything looks fine.
Note only a megger check was performed on the affected steering lines. Open load was measured on all lines. (Travis Cave) |
|
1800
|
Friday, October 05, 2018, 14:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#24 | Spent Target Move |
UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for details. |
Attachment 1: Target_Index_2018-10-05.pdf
|
|
|
1799
|
Wednesday, October 03, 2018, 14:16 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta #57 | Leak check TM4 Lp Ta# 57 at SHC. |
Tried to leak check TM4 Ta57# at TCS. LD failed to pump down properly at fine range. It always tripped at 4 torr. I cheeked all vacuum lines seals and adapters on top of module to LD. Everything is good. Chad said the VCRs at SHC can not be tightened any more. Discussed with Anders, we decide to move module TCS and helium pressure test there. The same difficult happened last time on TM4 UCx24# at SHC when leak check. But,it is solved by pressurize the line at SHC last time.
The HS line was pressurized with 70 psi helium on Oct 04th at TCS.. LD 0,00X E-9atm.cc/sec no change in 2 minutes. No leak. |
|
1798
|
Tuesday, October 02, 2018, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#24 | Module move |
TM#4 with UC#24 has been moved from the east target station to the south hot cell. |
|
1797
|
Tuesday, October 02, 2018, 09:49 |
David Wang | ITE | Standard Operation | TM4 | UCx 24# | TM4 was disconnected in ITE. |
TM4 was disconnected in ITE yesterday. See attachment for checklist. |
Attachment 1: TM2_UCx_24#_disconnection_in_ITE..pdf
|
|
|
1796
|
Thursday, September 27, 2018, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move |
TM#3 has been moved from the conditioning station to the centre east silo. This will be its new home after the silo switcher-roo. |
|
1795
|
Wednesday, September 26, 2018, 07:14 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 HV test at TCS. |
I did a HV test on TM3 at TCS yesterday. HV Ramp up speed: 1KV per 5 minutes when below 30KV,1KV per 10 minutes from 30-36KV. There is no major spark below36 KV . I could see lots small and big vacuum response on IG1 and PNG2 when conditioning from 30-36 KV, especially when closing to 36 KV. However, At 36.4 KV, There is a big continuous spark occurred. It could not be stopped until I lowed the HV to 14KV. I have to ramp up from 14 KV again. This behavior on TM3 HV test is same as before we saw. The module can not pass 36KV at present condition. During the test., EL is tied to 60KV bias. The HV cover on TM3 top is installed. And, Service tray cover plate is installed on TM3. |
|
1794
|
Tuesday, September 25, 2018, 08:48 |
chad fisher | South Hot-Cell | Maintenance | | | Window leak and torque |
The south hot cell window has been found to be leaking oil. Upon inspection yesterday I found that the bolts compressing the gasket on the cold side were "loose". I have re-torqued them to the specification provided by the manufacturer in the attached procedure. |
Attachment 1: hot_cell_window_gasket_change_procedure.pdf
|
|