Entry  Monday, October 22, 2018, 14:05, Travis Cave, ITW, Repair, , , Module move 
 ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair.
Entry  Wednesday, October 10, 2018, 10:50, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#57, Electrical Check TM#4_UC#24_Electrical_Check_SHC.pdfTM#4_Elec_Chk_No_Target_Oct-3-2018.pdfTM#4_Elec_Chk_SHC_Ta#57.pdf
 The various electrical check done on TM#4 after the UC run and before the start of the Ta run.
Entry  Wednesday, October 10, 2018, 07:52, David Wang, ITE, Standard Operation, TM4, Ta#57, TM4 has been connected in ITE. TM4_with_TA#56_connection_in_ITE.pdf
TM4 has been connected in ITE. see attachment.
Entry  Tuesday, October 09, 2018, 13:46, Travis Cave, ITE, Standard Operation, TM4, Ta#57, Module move 
 TM#4 with Ta#57 has been moved from the conditioning station to the east target station.
Entry  Tuesday, October 09, 2018, 12:32, David Wang, Conditioning Station, Repair, TM4, , TM4 steers 4 pin feedthrough CF flange 
TM4 Steers 4 pin feedthrough CF flange is replaced due an inside feed through insulator broken. CF 25 cooper seal is replaced with a new one as well.
Travis did anelectrical check. after replacement. Everything looks fine.
 
Entry  Friday, October 05, 2018, 14:41, Travis Cave, Spent Target Vault, Standard Operation, , UC#24, Spent Target Move Target_Index_2018-10-05.pdf
 UC#24 has been moved from the south hot cell to the spent target vault. The target is in pail #171 and placed in spot 4C. See attached PDF for
details.
Entry  Wednesday, October 03, 2018, 14:16, David Wang, South Hot-Cell, Standard Operation, TM4, Ta #57, Leak check TM4 Lp Ta# 57 at SHC. 
Tried to leak check TM4 Ta57# at TCS. LD failed to pump down properly at fine range. It always tripped at 4 torr. I cheeked all vacuum lines seals and
adapters on top of module to LD. Everything is good. Chad said the VCRs at SHC can not be tightened any more. Discussed with Anders, we decide to move
module TCS and helium pressure test there.  The same difficult happened last time on TM4 UCx24# at SHC when leak check. But,it is solved by pressurize
Entry  Tuesday, October 02, 2018, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#24, Module move 
 TM#4 with UC#24 has been moved from the east target station to the south hot cell.
Entry  Tuesday, October 02, 2018, 09:49, David Wang, ITE, Standard Operation, TM4, UCx 24#, TM4 was disconnected in ITE. TM2_UCx_24#_disconnection_in_ITE..pdf
TM4 was disconnected in ITE yesterday. See attachment for checklist.
Entry  Thursday, September 27, 2018, 13:58, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved from the conditioning station to the centre east silo. This will be its new home after the silo switcher-roo.
Entry  Wednesday, September 26, 2018, 07:14, David Wang, Conditioning Station, Repair, TM3, , TM3 HV test at TCS. 
I did a HV test on TM3 at TCS yesterday. HV Ramp up speed: 1KV per 5 minutes when below 30KV,1KV per 10 minutes from 30-36KV. There is no major spark
below36 KV .  I could see  lots small and big vacuum response on IG1 and PNG2 when conditioning from 30-36 KV, especially when closing to 36
KV.  However, At 36.4 KV, There is a big continuous spark occurred. It could not be stopped until I lowed the HV to 14KV. I have to ramp up from 14
Entry  Tuesday, September 25, 2018, 08:48, chad fisher, South Hot-Cell, Maintenance, , , Window leak and torque hot_cell_window_gasket_change_procedure.pdf
The south hot cell window has been found to be leaking oil. Upon inspection yesterday I found that the bolts compressing the gasket on the cold side
were "loose". I have re-torqued them to the specification provided by the manufacturer in the attached procedure.
Entry  Tuesday, September 25, 2018, 08:01, chad fisher, South Hot-Cell, Standard Operation, TM2, nSiC#1, nSiC#1 install 20180919_132304.jpg20180919_143535.jpg
On September 18th installation of nSiC#1 was attempted on TM2. As usual, new fasteners were tested previous to insertion into hot cell and employed during
installation. the last fastener to be installed was for the circuit D block. The fastener/air ratchet stalled immediately indicating a problem. The fastener
was removed and a an attempt was made trying a new spare fastener. That fastener also jammed right away but could not be removed or installed any further.
Entry  Tuesday, September 25, 2018, 07:54, David Wang, Conditioning Station, Repair, TM3, , TM3 is connected for HV test at TCS. 
water loops are by passed on top. All bias, EE, and  EL are tied together. Started water system.
Entry  Monday, September 24, 2018, 14:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#23, Spent Target Move 
 The spent UC#23 target has been moved from the south hot cell to the spent target storage. It was placed in pail #170 and place in spot #4B in
the vault.
Entry  Monday, September 24, 2018, 10:21, Anders Mjos, South Hot-Cell, Standard Operation, TM2, UC#23, Post Irradiation Examination (PIE) 20180924_161322929_iOS.jpg
UC#23 experienced short between target and heat shield as it was heated during operation. The inspection of the target after irradiation revealed that
the left target leg was close to the heat shield opening and likely the cause of the short. Marks could be seen on the leg indicating contact. See attached
photo. More photos are available on DocuShare
Entry  Friday, September 21, 2018, 10:07, David Wang, ITW, Standard Operation, TM2, SiC nano, TM2 with SiC nano target was has been connected in ITW. TM2_with_SiC_nano_connection_in_ITW..pdf
Tm2 with SiC nano has been connected in ITW. See attachment for checklist
Entry  Friday, September 21, 2018, 10:06, David Wang, ITW, Standard Operation, TM2, UCx23, TM2 was disconnected in ITW. TM2_UCx_23#_disconnection_in_ITW..pdf
TM2 was disconnected in ITW this Tuesday. See attachment for checklist.
Entry  Thursday, September 20, 2018, 14:36, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Module move 
 TM#2 with nSiC#1 has been moved from the south hot cell to the west target station.
Entry  Thursday, September 20, 2018, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, nSiC#1, Electrical Check Electrical_Chk_TM2_SHC_nSiC#1_Sept-20-2018.pdf
 TM#2 with the nSiC#1 target had its check done on it at the south hot cell see attached for results.