Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 48 of 141  Not logged in ELOG logo
ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1250   Thursday, June 02, 2016, 18:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

    

       
            
 DSC_0821.JPGDSC_0822.JPG 
  1251   Friday, June 03, 2016, 11:35 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule movedTM#3 has been moved back to the north east
silo.
  
  1252   Friday, June 03, 2016, 16:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

    

       
            
  
  1284   Wednesday, July 13, 2016, 08:47 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1287   Monday, July 18, 2016, 13:56 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule movedTM#3 is now in the south hot cell.   
  1288   Monday, July 18, 2016, 14:14 David WangConditioning StationRepairTM3 TM3 leak checked at TCSLast Friday July-15, TM3 was leak checked
at TCS. All air to vacuum seals on service
cap are good.  Helium pressure test
  
  1289   Tuesday, July 19, 2016, 14:35 Aurelia LaxdalConditioning StationRepairTM3 TM3 leak checked at TCS

    

       
            
  
  1290   Friday, July 22, 2016, 10:57 David WangConditioning StationRepairTM3 TM3 has been moved and connected at TCSI started vacuum system.
I started TCS water system. The chiller
does not work properly still. But, It will
  
  1291   Monday, July 25, 2016, 08:15 Anders MjosConditioning StationRepairTM3 HV Test Monday, July 25, 2016, 08:14: Enabled
staging for chiller
Monday, July 25, 2016, 08:33: Disabled
 TM3_HV_conditioning_2016-07-25.docxTCS-2016-07-25_TM3_no_target.rgaTCS-2016-07-26_TM3_no_target.rga 
  1293   Thursday, July 28, 2016, 11:27 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 with no target has been moved from
the conditioning station to the NE silo.
  
  1312   Wednesday, August 10, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stoppedThe TCS is venting now. The TM3 blue insulator
replacement job will be started soon.
  
  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 is now back in the the north east
silo.
  
  1346   Wednesday, September 07, 2016, 11:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the NE Silo to
the conditioning station.
  
  1347   Thursday, September 08, 2016, 16:28 David WangConditioning StationRepairTM3 TM3 blue insulators have been replaced.All TM3 blue insulators except Gas,EL,
and 60 KV common  on top of the module
have been replaced with new designed insulators.
  
  1348   Thursday, September 08, 2016, 16:30 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.start of roughing now.
 start of TCS and TM3 turbo-pumps.
Everything is good so far.
  
  1349   Monday, September 12, 2016, 09:25 David WangConditioning StationRepairTM3 TM3 leak checked at TCSAfter blue insulators replacement, TM3
service cap are leak checked. LD base leak
rate 0.0xe-9 atm.cc/sec. I sprayed lots helium
  
  1350   Tuesday, September 13, 2016, 13:52 Anders MjosConditioning StationStandard OperationTM3 HV Test with new insulators on Service Cap (vacuum to air)Tuesday, September 12, 2016, 10:00: RGA
on

Tuesday, September 13, 2016,
 TM3_HV_conditioning_2016-09-13.docxTCS-2016-09-11_TM3_New_Blue_Insulators.rga 