ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed
 Target_Index_2019-10-28.pdf 
  2021   Tuesday, November 05, 2019, 10:19 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Module move TM#2 with Ta#59 has been moved from
the ITE to the south hot cell.
  
  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check Results of the electrical check of
TM#2 with the old Ta#59 target and target
free.
 Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdfElec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf 
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details.
 Target_Index_2019-11-08.pdf 
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault
 Target_Index_2019-11-14_Mini_Vault.pdf 
  2031   Tuesday, November 26, 2019, 10:24 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38Module move TM#2 with SiC#38 has been moved from
ITE to the south hot cell.
  
  2033   Friday, November 29, 2019, 11:02 Travis CaveSouth Hot-CellStandard OperationTM2SiC#38 SiC#39Electrical Check Results from the electrical check
with the old SiC#38 target and the new SiC#39.
 Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf 
  2034   Friday, November 29, 2019, 11:03 Travis CaveSouth Hot-CellStandard OperationTM2SiC#39Module move TM#2 with the SiC#39 target has been
moved from the south hot cell to the east
target station.
  
  2044   Thursday, January 09, 2020, 13:49 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the south
west silo to the conditioning station.
  
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  2050   Thursday, January 16, 2020, 09:37 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo.
  
  2058   Tuesday, February 04, 2020, 14:22 Travis CaveSouth Hot-CellStandard OperationTM4UC#29Module move TM#4 with UC#29 has been moved from
the west target station to the south hot
cell.
  
  2066   Friday, February 14, 2020, 11:25 Travis CaveConditioning StationStandard OperationTM4Dummy TargetModule move TM#4 with dummy target has been moved
from the south hot cell to the conditioning
station.
  
  2071   Thursday, February 27, 2020, 09:50 Travis CaveSafe Module ParkingStandard OperationTM2SiC#39Module move TM#2 with SiC#39 has been moved from
the east station to the smp.
  
  2081   Wednesday, March 11, 2020, 10:39 Travis CaveITEMaintenance  Entrance module move The entrance module has been moved
to the east station to the south hot cell
for inspection from the turbo pump explosion.
  
  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move The east entrance module has been
moved from the south hot cell back to the
east target station.
  
  2085   Monday, March 16, 2020, 09:25 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the silo
to the south hot cell.
  
  2086   Tuesday, March 17, 2020, 11:42 Travis CaveITEStandard OperationTM4P to N targetModule move TM#4 with the P to N target has been
moved from the south hot cell to the east
target station.
  
  2102   Tuesday, June 16, 2020, 09:37 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 with no target has been moved
from the south west silo to the south hot
cell.
  
  2105   Thursday, June 18, 2020, 09:11 Travis CaveITWStandard OperationTM2Graphite #1Module move TM#2 with the graphite #1 target
has been moved from the south hot cell to
the west target station.
  