  1924   Friday, May 17, 2019, 10:47 Travis CaveITEStandard OperationTM2Ta#58Module move

 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.

  1923   Thursday, May 16, 2019, 14:35 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58Electrical Check

 Results of the electrical check of TM#2 without target and with the new Ta#58 target.

Attachment 1: Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdf
Attachment 2: Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
Electrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
  1922   Thursday, May 16, 2019, 12:31 chad fisherSouth Hot-CellStandard OperationTM2Ta#58Ta #58 installed

Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs.

  1921   Wednesday, May 15, 2019, 16:06 Isaac EarleSafe Module ParkingDevelopment  SMP module support flange installed and leak checked

The SMP module support flange sub-assembly (IRH1755) was installed today according to drawing IRH1683.  Dow Corning 111 sealing compound was used to keep the o-ring adhered to the lower groove during transportation and installation.  The TCS shield plug (IRH1646) was then installed on the SMP module flange which has vacuum connections for leak checking.  Vacuum was pulled on the SMP vessel using the Varian 979 leak detector.  After approximately 3.5 hours of pumping the test port pressure was at 2.4E-2 Torr and leak rate was 7.9E-8atm*cc/s.  Helium was configured with the regulator set at 10psi and flow rate of >10 bubbles per second in Windex and then applied slowly around the perimeter of the vacuum flange (IRH1686) and it's mating components on both  the top and the bottom.  There was no response on the leak detector indicating the seals on both sides of the module flange are leak tight.

 

20190515_094730.jpg

 

20190515_094740.jpg

 

20190515_103253.jpg

 

20190515_103824.jpg

 

 

 

 

 

  1920   Monday, May 13, 2019, 11:22 David WangITWRepair  ITW entrance module has been connnected.

Entrance module has been connected back to ITW. Everything is normal.

  1919   Monday, May 13, 2019, 09:55 Travis CaveITWStandard Operation  Entrance module move

 The West Entrance module has been moved from the south hot cell to the west target station.

  1918   Friday, May 10, 2019, 10:23 chad fisherSouth Hot-CellRepair  West Entrance module wire scanner replacement

West entrance module - visible broken or disconnected wire visible on old/existing wire scanner. Wire scanner removed, new one installed.

Attachment 1: 20190509_085908.jpg
20190509_085908.jpg
Attachment 2: 20190510_101235.jpg
20190510_101235.jpg
  1917   Wednesday, May 08, 2019, 10:29 Travis CaveSouth Hot-CellStandard Operation  Entrance module move

 The entrance module has been moved from the west station to the south hot cell.

  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move

 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell.

Attachment 1: Target_Index_2019-05-02.pdf
Target_Index_2019-05-02.pdf Target_Index_2019-05-02.pdf
  1915   Wednesday, May 01, 2019, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical Check

 Electrical check of the TM#4 with no target attached at the south hot cell before being moved to the south west silo.

Attachment 1: TM4_elec_chk_no_tgt_shc_may_1_2019.pdf
TM4_elec_chk_no_tgt_shc_may_1_2019.pdf
  1914   Wednesday, May 01, 2019, 09:34 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has now been moved to the south west silo.

  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removal

UC#26 has been removed from TM4.

Attachment 1: 20190501_072940[1].jpg
20190501_072940[1].jpg
  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check

 Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached.

Attachment 1: Elec_CHk_UC26_SHC_post_beam.pdf
Elec_CHk_UC26_SHC_post_beam.pdf
  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from ITE to the south hot cell.

  1910   Monday, April 29, 2019, 09:32 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Spent targets moved to mini vault.

 The following targets have been moved from the spent target vault to the mini vault:

#127 - SiC#31 (front)

#132 - SiC#32 

#145 - UC#19

#150 - UC#20

#159 - UC#21 (back) 

  1909   Monday, April 29, 2019, 07:56 chad fisherSouth Hot-CellDevelopment  Pail transfers

Two pail transfers took place April 25th.

Ta#47 transfered from pail 137 to pail 201. existing plastic bag from 137 showed many areas of typical age/rad damage related failure.

 

Ta#45 in pail 124 was transfered to pail 202. Pail 124 also contained the shutter and "roof mounted" img gauge from TM2 that were removed in 2015 in addition to a bunch of fasteners, heat shrink tubing (from lock lever rings from an previous methods of spent target packaging) etc. The original plastic bag in pail 124 had completely failed and shredded and flaky. The shutter and extraction electrode from Ta#47 were put in pail 202 with Ta#45...cabling of the shutter being completely intertwined with the target.

Attachment 1: 20190425_133750.jpg
20190425_133750.jpg
Attachment 2: 20190425_134106.jpg
20190425_134106.jpg
  1908   Thursday, April 18, 2019, 10:04 Travis CaveSouth Hot-CellMaintenance Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45Target transfer from old pail to new pail.

 Targets Ta#50 and SiC#34 have been transferred from their old pails to new ones. Ta#50 was done on April 12th 2019 it was moved from pail #148 to pail #200 and a new field measurement was done and found to be 3.57mSv/hr. SiC#34 was done on April 18th 2019 it was moved from pail #143 to pail # 206 and a new field measurement was done and found to be 2.20mSv/hr. Both measurements were done by the RAM that is mounted at the south hot cell.

 

April 24 2019

Target Ta#46 has now been transferred to a new pail with a number 207 from pail 143 it was 3.62 mSv/hr when removed from the south hot cell.

 

April 25 2019

Target Ta#47 has now been transferred to a new pail with a number 201 from pail 137 it was 2.25mSv/hr when removed from the south hot cell. The bag that the target was in has shown signs of degradation.

Target Ta#45 has now been transferred to a new pail with a number 202 from pail 124 it was 1.45mSv/hr when removed from the south hot cell. The bag that the target was in was destroyed. Also in the pail was a shutter, IMG Gauge, some altem parts, wire and bolts.

The extraction electrode from Ta#47 was added to this pail as it was left behind from last transfer.

  1907   Wednesday, April 17, 2019, 12:03 chad fisherSouth Hot-CellRepair  Manipulator repair

Broken handle cable of east manipulator has been replaced and manipulator is operational again.

  1906   Friday, April 12, 2019, 11:44 chad fisherSouth Hot-CellStandard Operation  Pail transfer

Pail transfer was undertaken in the south hot cell. went very well except near the end the master tong cable of the right hand manipulator broke. Not entirely a surprise due to the amount of use it has seen lately.

  1905   Friday, April 05, 2019, 13:44 chad fisherSpent Target VaultDevelopment  2019 Pail drop tests
  • Drop test performed January 8, 2019 with 25 lb target, UN pail and lug cover. Drop failed. Lug cover half removed. Pictures and video in docushare collection 24626.
  • Second test January8, 2019 UN pail, "new" dish cover, old lock lever ring, 25 lb target. Single drop from 1.2m onto latch, no sealant. No leaks 24 hours later. Pictures in docushare collection 24626

 

  • Drop test performed April 2, 2019 repeat of previous test using until that was loaded in north hot cell test. Target punctured can. Pictures in docushare collection 24626.

 

  • Drop test performed April 5, 2019 repeat of previous test with the addition of a aluminum sleeve (0.05" thick) inside the pail between pail and target.

New UN rated pail with 9.55 kg target, 1.2 kg 16 gauge Al sleeve (10.75 OD x 14.75" tall), 3 liters of water with red food coloring no sealant on gasket.

First drop standard drop test from 1.2m onto latch

Second drop test 1.2m onto bottom of pail

Third drop 1.2m onto side of pail

Drops 4-6 1.2m onto lid

Pail was left inverted for an hour after the first three drops with no leaks after 1 hour.

No leaks after the remaining 3 drops .Bottom very damaged suggesting need for protective disc in bottom of pail.

Pictures can be found in docushare Collection-24627

 

  • Drop tests performed May 2, 2019 with 9.7 kg target, 1.346 kg of mixed module and target components, sleeve and disc. First drop on latch from 1.2m, no leak, second drop straight on bottom from 1.2m, no leak, third drop on side from 1.2m leak. Drop test described in more detail in document drop test witness document on docushare. Pictures and video in docushare collection 24626.

 

 

 