Entry  Tuesday, November 26, 2019, 10:24, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#38, Module move 

 TM#2 with SiC#38 has been moved from ITE to the south hot cell.

Entry  Friday, November 29, 2019, 11:02, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#38 SiC#39, Electrical Check Elec_chk_SiC#38_SHC_post_beam_TM2_11-26-2019.pdfElec_chk_SiC#39_SHC_TM2_11-29-2019.pdf

 Results from the electrical check with the old SiC#38 target and the new SiC#39.

Entry  Friday, November 29, 2019, 11:03, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#39, Module move 

 TM#2 with the SiC#39 target has been moved from the south hot cell to the east target station.

Entry  Thursday, January 09, 2020, 13:49, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the south west silo to the conditioning station.

Entry  Monday, January 13, 2020, 14:19, Travis Cave, Spent Target Vault, Standard Operation, , Ta#49 and Ta#52, spent target repackaging and moved to mini vault. 

 Targeta Ta#49 and Ta#52 have been repackaged anf moved to the mini vault. Ta#49 was taken out of pail number 146 and placed into pail 229. Ta#52 was taken out of pail number 152 and placed into pail 230.

Entry  Thursday, January 16, 2020, 09:37, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the conditioning station to the centre east silo.

Entry  Tuesday, February 04, 2020, 14:22, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#29, Module move 

 TM#4 with UC#29 has been moved from the west target station to the south hot cell.

Entry  Friday, February 14, 2020, 11:25, Travis Cave, Conditioning Station, Standard Operation, TM4, Dummy Target, Module move 

 TM#4 with dummy target has been moved from the south hot cell to the conditioning station.

Entry  Thursday, February 27, 2020, 09:50, Travis Cave, Safe Module Parking, Standard Operation, TM2, SiC#39, Module move 

 TM#2 with SiC#39 has been moved from the east station to the smp.

Entry  Wednesday, March 11, 2020, 10:39, Travis Cave, ITE, Maintenance, , , Entrance module move 

 The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion.

Entry  Friday, March 13, 2020, 09:24, Travis Cave, ITE, Standard Operation, , , Entrance module move 

 The east entrance module has been moved from the south hot cell back to the east target station.

Entry  Monday, March 16, 2020, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 

 TM#4 has been moved from the silo to the south hot cell.

Entry  Tuesday, March 17, 2020, 11:42, Travis Cave, ITE, Standard Operation, TM4, P to N target, Module move 

 TM#4 with the P to N target has been moved from the south hot cell to the east target station.

Entry  Tuesday, June 16, 2020, 09:37, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 with no target has been moved from the south west silo to the south hot cell.

Entry  Thursday, June 18, 2020, 09:11, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move 

 TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station.

Entry  Thursday, June 25, 2020, 09:45, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move 

 TM#2 with the graphite #1 target has been moved from the south hot cell to the west target station.

Entry  Tuesday, June 30, 2020, 10:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, Test Proton to Neutron Target, Module move 

 TM#4 has been moved from the east target station to the south hot cell.

Entry  Friday, July 03, 2020, 14:08, Travis Cave, ITE, Standard Operation, TM4, UC#30, Module move 

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

Entry  Tuesday, July 07, 2020, 09:16, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module.

Entry  Monday, July 13, 2020, 10:01, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the conditioning station to the silo.

 