Wednesday, December 13, 2023, 11:42, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - TCS TO SHC
|
TM3 has been moved from the target conditioning station to the south hot cell. |
Tuesday, November 28, 2023, 12:58, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - Silo to SHC
|
TM3 was moved from the Silo to South Hot Cell. |
Friday, December 15, 2023, 11:07, Adam Newsome, Conditioning Station, Standard Operation, TM3, , TM3 Move - SHC to TCS
|
TM3 was moved from the SHC to the TCS (no target installed). |
Friday, March 15, 2024, 10:04, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move - SHC to NE Silo
|
TM3 was moved from SHC to NE silo. Cable tray was recently installed. |
Thursday, August 29, 2019, 12:54, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move
|
TM3 has been moved from the Middle-East silo to the South Hot Cell. |
Tuesday, September 03, 2019, 10:48, Adam Newsome, South Hot-Cell, Standard Operation, TM3, , TM3 Move
|
TM3 has been moved from the South Hot-Cell to the Middle-East silo. |
Monday, December 07, 2020, 12:20, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move
|
TM3 has been moved from the South Hot Cell to the Conditioning Station. No containment box. |
Thursday, December 10, 2020, 15:07, Adam Newsome, South Hot-Cell, Development, TM3, , TM3 Move
|
TM3 was remotely moved from the conditioning station to the South Hot Cell. No containment box. |
Monday, January 04, 2021, 12:13, Adam Newsome, Conditioning Station, Development, TM3, , TM3 Move
|
TM3 was remotely moved from the South Hot Cell to the conditioning station. No containment box. |
Sunday, April 30, 2017, 20:57, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS
|
Please see attachment for TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS. |
Thursday, April 13, 2017, 10:32, chad fisher, South Hot-Cell, Repair, TM3, , TM3 Lower Service Tray Video Inspection
|
A video inspection of the lower service tray was performed this morning. Camera was inserted upwards into the service tray/service chase from the containment
box. One potential spark mark was identified as well as epoxy not flush with insulator. Fiberglass does not extend into service tray/chase much and does
not look, from initial inspection that it will be too difficult to remove. |
Wednesday, April 26, 2017, 16:52, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , TM3 Lower Service Tray Video Inspection
|
chad fisher wrote:
A video inspection of the lower service tray was performed this morning. Camera was inserted upwards |
Wednesday, April 12, 2017, 16:39, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 Inspection at the South Hot Cell 
|
Found spark signs on TM3's containment on the side of the water blocks. They may be OLD or/and NEW sparking signs, but this in not determined at this
moment. Please see picture: first attachment. First and second attachment show the profiles of water block and HV lines. |
Tuesday, May 02, 2017, 18:33, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017
|
Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines. THIS TEST AT ATMOSPHERE IS THE FIRST ONE AFTER THE FIBER
GLASS WAS REMOVED.
Please note: |
Thursday, April 27, 2017, 19:59, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere for Each Line(s) April 27, 2017
|
Today a HV test at atmosphere was performed for Each Line(s), while floating the other lines.
Please note the Einzel Lens line (Y) was grounded.
Tests performed: |
Wednesday, April 26, 2017, 17:37, Aurelia Laxdal, South Hot-Cell, Repair, TM3, no target, TM3 HV tests at atmosphere Pictures from April 19-21, 2017  
|
Please see the first two pictures of the HV test at atmosphere done on April 19.
|
Wednesday, September 26, 2018, 07:14, David Wang, Conditioning Station, Repair, TM3, , TM3 HV test at TCS.
|
I did a HV test on TM3 at TCS yesterday. HV Ramp up speed: 1KV per 5 minutes when below 30KV,1KV per 10 minutes from 30-36KV. There is no major spark
below36 KV . I could see lots small and big vacuum response on IG1 and PNG2 when conditioning from 30-36 KV, especially when closing to 36
KV. However, At 36.4 KV, There is a big continuous spark occurred. It could not be stopped until I lowed the HV to 14KV. I have to ramp up from 14 |
Friday, May 05, 2017, 19:36, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 65kV
|
Today TM3 HV conditioning went up to 65kV. I'll leave it here over night. ISAC OPS have instructions to keep an alarm on the HV, and ion gauge and turbo
pump (TP2 tripped 3 times due to sparking). |
Thursday, May 04, 2017, 19:10, Aurelia Laxdal, Conditioning Station, Repair, TM3, no target, TM3 HV test at TCS up to 50kV
|
Today TM3 was conditioned up to 50kV. At 50kV sparking started and to go higher in voltage it needs more conditioning time. Lowered it to 49kV for the
night. |
Wednesday, September 04, 2019, 13:53, chad fisher, South Hot-Cell, Repair, TM4, , TM3 CB to TM4
|
The TM3 containment box has been installed onto TM4. No issues, leak checked ok.
|
|