Entry  Monday, June 10, 2019, 08:26, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Ramping voltage on TM4 w/o source tray 
TM4 in conditioning station with no source tray, extraction electrode set to HV bias. Brought up to 30kV over the weekend by ISAC ops with no issues.
BIAS=30kV
EL=15kV
Entry  Friday, June 07, 2019, 13:11, David Wang, Conditioning Station, Development, TM4, , TCS and TM4.  
TM4 has been connected at TCS for HV test. TCS water system and vacuum pumps are switched on. 
Entry  Friday, June 07, 2019, 08:56, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move 
 TM#4 has been moved from the south hot cell to the conditioning station.
Entry  Thursday, June 06, 2019, 10:01, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, no source Tray, Electrical Check TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf
 Results from the electrical check of TM#4 at the south hot cell with no source tray. R&U are shorted and when meggered A&P have a value
of 193k ohms. See attached for details.
Entry  Tuesday, June 04, 2019, 08:46, David Wang, ITE, Standard Operation, TM2, , ITE water signal interlock check. 
ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1
circuit on Module since now. 
Entry  Friday, May 24, 2019, 09:11, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 
 TM#4 has been moved from the south west silo to the south hot cell.
Entry  Thursday, May 23, 2019, 11:22, Travis Cave, South Hot-Cell, Maintenance, , , Removing garbage from the south hot cell. 
 A 55 Gal. drum was remotely lowered into the south hot cell. It was then filled with compressable waste. Then the drum was remotely removed from
the south hot cell. The drum measured about 20microSv/hr upon removal from the south hot cell.
Entry  Thursday, May 23, 2019, 08:39, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Module move 
 TM#1 has been moved from the south hot cell to the northwest silo.
Entry  Wednesday, May 22, 2019, 11:52, David Wang, Conditioning Station, Maintenance, TM1, , TM1 inpsection. 
TM1 shielding plates and their holding bolts are inspected. No corrosion.  TM1 is located at TCS now. Both TP1 and TP2 are started.
Entry  Wednesday, May 22, 2019, 11:50, David Wang, ITE, Standard Operation, TM4, , TM2 has been connected in ITE. Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.
See attachment for connection checklist.
Entry  Wednesday, May 22, 2019, 08:33, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move 
 TM#1 has been moved from the north west silo to the conditioning station for the day it will be moved back to the silo tomorrow morning.
Entry  Friday, May 17, 2019, 16:46, Adam Newsome, Safe Module Parking, Development, , , SMP Controls Installation Update IMG_20190417_100838.jpgIMG_20190417_100843.jpgIMG_20190517_162230.jpgIMG_20190517_162305.jpg
 
The following controls-related items were installed for the SMP project:
- Cable tray
Entry  Friday, May 17, 2019, 10:47, Travis Cave, ITE, Standard Operation, TM2, Ta#58, Module move 
 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.
Entry  Thursday, May 16, 2019, 14:35, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#58, Electrical Check Ta#58_TM2_SHC_electrical_chk_May_16_2019.pdfElectrical_Chk_TM2_no_target_May_15_2019_SHC.pdf
 Results of the electrical check of TM#2 without target and with the new Ta#58 target.
Entry  Thursday, May 16, 2019, 12:31, chad fisher, South Hot-Cell, Standard Operation, TM2, Ta#58, Ta #58 installed 
Ta #58 has been installed onto TM2. All new silver plated high current fasteners. All torqued to 130 in lbs.
Entry  Wednesday, May 15, 2019, 16:06, Isaac Earle, Safe Module Parking, Development, , , SMP module support flange installed and leak checked 20190515_094730.jpg20190515_094740.jpg20190515_103253.jpg20190515_103824.jpg
The SMP module support flange sub-assembly (IRH1755) was installed today according to drawing IRH1683.  Dow Corning 111 sealing compound was used
to keep the o-ring adhered to the lower groove during transportation and installation.  The TCS shield plug (IRH1646) was then installed on the SMP
module flange which has vacuum connections for leak checking.  Vacuum was pulled on the SMP vessel using the Varian 979 leak detector.  After
Entry  Monday, May 13, 2019, 11:22, David Wang, ITW, Repair, , , ITW entrance module has been connnected. 
Entrance module has been connected back to ITW. Everything is normal.
Entry  Monday, May 13, 2019, 09:55, Travis Cave, ITW, Standard Operation, , , Entrance module move 
 The West Entrance module has been moved from the south hot cell to the west target station.
Entry  Friday, May 10, 2019, 10:23, chad fisher, South Hot-Cell, Repair, , , West Entrance module wire scanner replacement 20190509_085908.jpg20190510_101235.jpg
West entrance module - visible broken or disconnected wire visible on old/existing wire scanner. Wire scanner removed, new one installed.
Entry  Wednesday, May 08, 2019, 10:29, Travis Cave, South Hot-Cell, Standard Operation, , , Entrance module move 
 The entrance module has been moved from the west station to the south hot cell.