  1280   Monday, July 11, 2016, 10:59 Travis CaveSpent Target VaultStandard Operation Ta#48Spent Target moveThe spent Ta#48 was moved from the south
hot cell to the spent target vault. I was
placed in pail 139 and is in spot 6C in the
 Vault_Storage_July_11_2016.pdf 
  1195   Wednesday, April 06, 2016, 14:03 chad fisherSouth Hot-CellStandard OperationTM4Ta#47UCx#14 removed Ta#47 installedUCx#14 has been removed from TM4 and Ta#47
installed. No marks on 9 pin connector on
UCx#14.
  
  1197   Thursday, April 07, 2016, 09:24 Travis CaveConditioning StationMaintenanceTM4Ta#47module movedTM#4 has been moved from the south hot
cell to the conditioning station.
  
  1206   Tuesday, April 12, 2016, 09:08 Travis CaveITEStandard OperationTM4Ta#47module movedTM#4 with Ta#47 has been moved from the
conditioning station to the east target station.
  
  1253   Tuesday, June 07, 2016, 11:36 David WangITEStandard OperationTM4Ta#47TM4 has been disconnected in ITE.Dan and I disconnected TM4 in ITE. HS water
lines has been purged.
  
  1254   Tuesday, June 07, 2016, 11:37 David WangITEStandard OperationTM4Ta#47TM4 has been moved from ITE to SHCBill and Yasmine did the move. Everything
is good.
  
  1255   Tuesday, June 07, 2016, 11:42 David WangSouth Hot-CellStandard OperationTM4Ta#47electrical check on TM4 with old Ta target at SHC.I did an electrical check on TM4 with the
old target still installed. The number is
a little bit low on 500V mega check between
 electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdfelectrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf 
  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target moveThe spent Ta#47 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail #137 in spot 4C of
 Vault_Storage_June_15_2016.pdf 
  1074   Tuesday, September 22, 2015, 11:39 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check with Ta#46 attached.  TM4Ta46elecchkSHC.PDF 
  1075   Tuesday, September 22, 2015, 13:15 David WangSouth Hot-CellStandard Operation Ta#46Leak check on TM4 HS water line with new Ta#46 target. at SHCChad and I leak checked the HS line at
SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.
  
  1076   Wednesday, September 23, 2015, 08:38 Travis CaveConditioning StationStandard OperationTM4Ta#46Module movedTM#4 with Ta#46 has been moved from the
south hot cell to the conditioning station.
  
  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check at the conditioning
station with Ta#46 target.
 TM4Ta46elecchkCS.PDF 
  1079   Wednesday, September 23, 2015, 14:35 David WangConditioning StationStandard OperationTM4Ta#46TM4 has been connected at CSTM4 has been connected at CS. Turbo- pumps
and water system are started and running
. The HV cover has been installed on the
  
  1080   Thursday, September 24, 2015, 07:00 David WangConditioning StationMaintenanceTM4Ta#46Turned off TCS all vacuum pumps and water pumps.TCS:MP1 back up pressure went up too high
(700mtorr).I turned off all the pumps.The
TCS is under vacuum still. TCS water 
  
  1081   Thursday, September 24, 2015, 14:59 Friedhelm AmesConditioning StationStandard OperationTM4Ta#46start high voltage conditioning    
  1084   Monday, September 28, 2015, 10:10 David WangConditioning StationStandard OperationTM4Ta#46Switched off CS vacuum pumps and water systemI switched off CS vacuum pumps and water
system after Isac opps finished the TM4 conditioning
at CS.
  
  1085   Tuesday, September 29, 2015, 09:38 Travis CaveITEStandard OperationTM4Ta#46Module movedTM#4 with Ta#46 has been moved to ITE from
the conditioning station.
  
  1086   Tuesday, September 29, 2015, 12:31 David WangITEStandard OperationTM4Ta#46TM4 has been connected in ITEDan and I connected TM4 in ITE. The turbo-
pumps are started. Water supply to TM4 only
at this stage. Everything is good so far.
  
  1091   Tuesday, October 06, 2015, 12:50 David WangITEStandard OperationTM4Ta#465 Shielding blocks have been transferred from ITW to ITE.The ITE is configured to take proton beam.   
  1092   Tuesday, October 06, 2015, 12:50 David WangITEStandard OperationTM4Ta#465 Shielding blocks have been transferred from ITW to ITE.The ITE is configured to take proton beam.   