2591
|
Tuesday, May 14, 2024, 15:27 |
Carla Babcock | ITE | Development | TM3 | UCx#44 | TM3 conditioning and testing in ITE | Tuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV |
|
1347
|
Thursday, September 08, 2016, 16:28 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 blue insulators have been replaced. | All TM3 blue insulators except Gas,EL,
and 60 KV common on top of the module
have been replaced with new designed insulators. |
|
616
|
Friday, March 07, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM3 | | TM3 and ITE air to vacuum leak check and TM3 water lines helium test. | With TM3 located in ITE, All air to vacuum
seals on ITE primary and secondary
vacuum vessel have been leak checked |
    |
2611
|
Friday, June 14, 2024, 11:55 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#44 | TM3 UCx#44 after operation electrical check at SHC | TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the |
|
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed | TM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass |
|
321
|
Wednesday, April 24, 2013, 11:48 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | Work on TM3 source tray removal started
at 10:40 am today.
The containment box has been removed, |
|
326
|
Tuesday, April 30, 2013, 07:47 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Source Tray Removal | The source tray has sucessfully been removed
from TM3.
I will put a report in the TM3 rev |
|
2648
|
Thursday, August 08, 2024, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM3 | SiC #46 | TM3 SiC#46 electrical check at SHC with target on (After operation) | ABCD is short to 60KV bias. Othjer are
ok. see attachment.
Found afterwards that this short |
|
1510
|
Wednesday, April 26, 2017, 17:55 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 Schedule updates at the South Hot Cell and CS | Please see TM3's Updated Schedule (the
current schedule) at the SHC and TCS.
For the record I am uploading TM3's |
 |
391
|
Tuesday, July 02, 2013, 09:37 |
chad fisher | South Hot-Cell | Development | TM3 | | TM3 Rev.2 Source Tray Disposal | Tm3 Rev.2 source tary has been transfered
to the vault tunnel storage. |
|
424
|
Thursday, August 22, 2013, 19:38 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 source tray - water blocks connected and torqued | After a great struggle with the water block
jigs, the TM3 source tray was finally advanced
fully into the service tray and all water |
6x |
431
|
Tuesday, August 27, 2013, 17:18 |
Grant Minor | Conditioning Station | Repair | TM3 | no target | TM3 Rev 3 source tray - prelminary leak check results at CS | David Wang started a helium leak check
on TM3 at the CS this morning.
David will create an e-log once his |
 |
425
|
Friday, August 23, 2013, 18:32 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 - steerer wire broken from connector on module side | While continuing on the TM3 Rev 3 source
tray installation, Chad noticed today that
one of the steerer wires is broken and has |
    |
426
|
Monday, August 26, 2013, 18:22 |
Grant Minor | South Hot-Cell | Repair | TM3 | | TM3 Rev 3 - all connetions made except steerers, IMG, and entrance window | Today Chad finished making all connections
to the new source tray, except for:
- steerers - broken wire, must be |
8x |
131
|
Thursday, June 21, 2012, 14:30 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurbishment Start | Started refurb of TM3.
Planned activities:
Inspection |
|
322
|
Wednesday, April 24, 2013, 14:09 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Refurbishment E.O.D. | Optics tray has been removed from module.
Waterblock jig installation has commenced.
Of note, jig installation on TM3 has proven |
|
133
|
Monday, June 25, 2012, 07:53 |
chad fisher | South Hot-Cell | Repair | TM3 | N/A | TM3 Refurb. Work | On Friday, June 22 the following work was
carried out.
Further inspection of |
|
299
|
Tuesday, April 16, 2013, 11:20 |
chad fisher | South Hot-Cell | Repair | TM3 | | TM3 Referb. start | Front containment box cover has been removed
and heat shield circuit blank offs removed
in preparation for installation of dummy |
 |
1491
|
Wednesday, April 12, 2017, 12:51 |
David Wang | South Hot-Cell | Repair | TM3 | | TM3 Ram readings @ SHC | We have a ram installed on SHC pole
which is 0.5 meter to module shielding
block surface. the readings we got today |
|
129
|
Wednesday, June 20, 2012, 11:39 |
Grant Minor | South Hot-Cell | Development | TM3 | N/A | TM3 Planned Activites at South Hot Cell Jun 20 to 29 2012 |
Normal