  1076   Wednesday, September 23, 2015, 08:38 Travis CaveConditioning StationStandard OperationTM4Ta#46Module moved

TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station.

  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical Check

TM#4 electrical check at the conditioning station with Ta#46 target.

Attachment 1: TM4Ta46elecchkCS.PDF
TM4Ta46elecchkCS.PDF
  1079   Wednesday, September 23, 2015, 14:35 David WangConditioning StationStandard OperationTM4Ta#46TM4 has been connected at CS

TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good so far.

  1080   Thursday, September 24, 2015, 07:00 David WangConditioning StationMaintenanceTM4Ta#46Turned off TCS all vacuum pumps and water pumps.

TCS:MP1 back up pressure went up too high (700mtorr).I turned off all the pumps.The TCS is under vacuum still. TCS water  package cooling fans showed error on control page.The water pumps are stopped  also.

Restarted the vacuum pumps 40 minutes after stopping. Everything is back to normal. The MP1 back up pressure need to be monitored frequently before we have a final solution on this issue.

Reset the CS cooling package on roof and restarted the water  pumps. The system is running good so far.

  1081   Thursday, September 24, 2015, 14:59 Friedhelm AmesConditioning StationStandard OperationTM4Ta#46start high voltage conditioning
  1084   Monday, September 28, 2015, 10:10 David WangConditioning StationStandard OperationTM4Ta#46Switched off CS vacuum pumps and water system

I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS.

  1085   Tuesday, September 29, 2015, 09:38 Travis CaveITEStandard OperationTM4Ta#46Module moved

TM#4 with Ta#46 has been moved to ITE from the conditioning station.

  1086   Tuesday, September 29, 2015, 12:31 David WangITEStandard OperationTM4Ta#46TM4 has been connected in ITE

Dan and I connected TM4 in ITE. The turbo- pumps are started. Water supply to TM4 only at this stage. Everything is good so far.

  1091   Tuesday, October 06, 2015, 12:50 David WangITEStandard OperationTM4Ta#465 Shielding blocks have been transferred from ITW to ITE.

The ITE is configured to take proton beam.

  1092   Tuesday, October 06, 2015, 12:50 David WangITEStandard OperationTM4Ta#465 Shielding blocks have been transferred from ITW to ITE.

The ITE is configured to take proton beam.

  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module moved

Yesterday TM#4 with Ta#46 was moved from the east station to the south hot cell.

  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target move

Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details.

Attachment 1: Vault_Storage_November_26_2015.pdf
Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf
  867   Monday, March 23, 2015, 14:03 chad fisherSouth Hot-CellStandard Operation Ta#45Ta#45 inserted into hot cell

Ta#45 has been inserted into the hot cell. Swipe taken of inner tool port area: 100000 counts/min.

  869   Tuesday, March 24, 2015, 09:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#45Ta#45 installed

Ta#45 has been installed onto TM4 and is ready for leak and electrical check. High current fasteners torqued to 130 in.lbs.

 

 

  870   Tuesday, March 24, 2015, 13:57 Travis CaveSouth Hot-CellStandard OperationTM4Ta#45Electrical check

TM#4 electrical checks with and without the target installed, installed target is Ta#45.

Attachment 1: TM4_no_tgt_elec_chk_CS.PDF
TM4_no_tgt_elec_chk_CS.PDF
Attachment 2: TM4_Ta45_elec_chk_SHC.PDF
TM4_Ta45_elec_chk_SHC.PDF
  872   Wednesday, March 25, 2015, 14:25 David WangSouth Hot-CellStandard OperationTM4Ta#45Leak check on TM4 HS water line with new Ta#45 target. at SHC

Chad and I leak checked TM4 HS water line with new Ta#45 target installed at SHC. Leak detector base leak rate 0.0Xe-9 atm.cc/sec, base pressure 0.0Xe-4 torr. Chad sprayed helium twice on each of HS 2 VCR joints.No leak has been found. The joints are leak tight. The helium pressure test  will be done at CS later.

  873   Wednesday, March 25, 2015, 14:34 David WangConditioning StationStandard OperationTM4Ta#45 TM4 and CS turbo- pumps are started .

I connected TM4 and CS vacuum system after TM4 move. CS roughing pump was started first this morning. Later, Anders, Bill and I started 3 turbo pumps on TM4 and CS. The pumping down is good so far. The CS vacuum system ion gauges are turned on also.

  874   Thursday, March 26, 2015, 09:20 Travis CaveConditioning StationStandard OperationTM4Ta#45Electrical check

Electrical check of TM#4 with Ta#45 at the conditioning station, see attached pdf for details.

Attachment 1: TM4_Ta#45_tgt_elec_chk_CS.PDF
TM4_Ta#45_tgt_elec_chk_CS.PDF
  875   Friday, March 27, 2015, 10:03 David WangConditioning StationStandard OperationTM4Ta#45Helium pressure test on TM4 HS line at CS

The helium pressure test on TM4 HS line at conditioning station is done. No leak. I also leak checked all vacuum seals on TM4 service cap. They are all good.

Attachment 1: 001.JPG
001.JPG
Attachment 2: 005.JPG
005.JPG
Attachment 3: 006.JPG
006.JPG
  876   Friday, March 27, 2015, 11:29 David WangConditioning StationStandard OperationTM4Ta#45TM4 is connected at CS

TM4 has been connected at CS which includes high current cables, water lines, EE cable, and Enizel lens cable. The HV cover has been  installed onto the TM4 service cap.The CS water system is started. All water signals are good so far.   Anders will start  HV and heaters conditioning on next Monday.