1076
|
Wednesday, September 23, 2015, 08:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Module moved |
TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station. |
1077
|
Wednesday, September 23, 2015, 13:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Electrical Check |
TM#4 electrical check at the conditioning station with Ta#46 target. |
Attachment 1: TM4Ta46elecchkCS.PDF
|
|
1079
|
Wednesday, September 23, 2015, 14:35 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | TM4 has been connected at CS |
TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good so far. |
1080
|
Thursday, September 24, 2015, 07:00 |
David Wang | Conditioning Station | Maintenance | TM4 | Ta#46 | Turned off TCS all vacuum pumps and water pumps. |
TCS:MP1 back up pressure went up too high (700mtorr).I turned off all the pumps.The TCS is under vacuum still. TCS water package cooling fans showed error on control page.The water pumps are stopped also.
Restarted the vacuum pumps 40 minutes after stopping. Everything is back to normal. The MP1 back up pressure need to be monitored frequently before we have a final solution on this issue.
Reset the CS cooling package on roof and restarted the water pumps. The system is running good so far. |
1081
|
Thursday, September 24, 2015, 14:59 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM4 | Ta#46 | start high voltage conditioning |
|
1084
|
Monday, September 28, 2015, 10:10 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#46 | Switched off CS vacuum pumps and water system |
I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS. |
1085
|
Tuesday, September 29, 2015, 09:38 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#46 | Module moved |
TM#4 with Ta#46 has been moved to ITE from the conditioning station. |
1086
|
Tuesday, September 29, 2015, 12:31 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | TM4 has been connected in ITE |
Dan and I connected TM4 in ITE. The turbo- pumps are started. Water supply to TM4 only at this stage. Everything is good so far. |
1091
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. |
The ITE is configured to take proton beam. |
1092
|
Tuesday, October 06, 2015, 12:50 |
David Wang | ITE | Standard Operation | TM4 | Ta#46 | 5 Shielding blocks have been transferred from ITW to ITE. |
The ITE is configured to take proton beam. |
1133
|
Wednesday, November 25, 2015, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Module moved |
Yesterday TM#4 with Ta#46 was moved from the east station to the south hot cell. |
1141
|
Thursday, November 26, 2015, 08:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#46 | Spent Target move |
Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details. |
Attachment 1: Vault_Storage_November_26_2015.pdf
|
|
867
|
Monday, March 23, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | | Ta#45 | Ta#45 inserted into hot cell |
Ta#45 has been inserted into the hot cell. Swipe taken of inner tool port area: 100000 counts/min. |
869
|
Tuesday, March 24, 2015, 09:47 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Ta#45 installed |
Ta#45 has been installed onto TM4 and is ready for leak and electrical check. High current fasteners torqued to 130 in.lbs.
|
870
|
Tuesday, March 24, 2015, 13:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Electrical check |
TM#4 electrical checks with and without the target installed, installed target is Ta#45. |
Attachment 1: TM4_no_tgt_elec_chk_CS.PDF
|
|
Attachment 2: TM4_Ta45_elec_chk_SHC.PDF
|
|
872
|
Wednesday, March 25, 2015, 14:25 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#45 | Leak check on TM4 HS water line with new Ta#45 target. at SHC |
Chad and I leak checked TM4 HS water line with new Ta#45 target installed at SHC. Leak detector base leak rate 0.0Xe-9 atm.cc/sec, base pressure 0.0Xe-4 torr. Chad sprayed helium twice on each of HS 2 VCR joints.No leak has been found. The joints are leak tight. The helium pressure test will be done at CS later. |
873
|
Wednesday, March 25, 2015, 14:34 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 and CS turbo- pumps are started . |
I connected TM4 and CS vacuum system after TM4 move. CS roughing pump was started first this morning. Later, Anders, Bill and I started 3 turbo pumps on TM4 and CS. The pumping down is good so far. The CS vacuum system ion gauges are turned on also. |
874
|
Thursday, March 26, 2015, 09:20 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#45 | Electrical check |
Electrical check of TM#4 with Ta#45 at the conditioning station, see attached pdf for details. |
Attachment 1: TM4_Ta#45_tgt_elec_chk_CS.PDF
|
|
875
|
Friday, March 27, 2015, 10:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | Helium pressure test on TM4 HS line at CS |
The helium pressure test on TM4 HS line at conditioning station is done. No leak. I also leak checked all vacuum seals on TM4 service cap. They are all good. |
Attachment 1: 001.JPG
|
|
Attachment 2: 005.JPG
|
|
Attachment 3: 006.JPG
|
|
876
|
Friday, March 27, 2015, 11:29 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#45 | TM4 is connected at CS |
TM4 has been connected at CS which includes high current cables, water lines, EE cable, and Enizel lens cable. The HV cover has been installed onto the TM4 service cap.The CS water system is started. All water signals are good so far. Anders will start HV and heaters conditioning on next Monday. |
Attachment 1: 010.JPG
|
|
Attachment 2: 013.JPG
|
|
Attachment 3: 012.JPG
|
|