517
|
Tuesday, October 22, 2013, 14:23 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | as measured today in the electrical room
by David and Anders |
|
529
|
Friday, October 25, 2013, 13:39 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders.
|
|
532
|
Thursday, October 31, 2013, 11:38 |
Anders Mjos | ITE | Standard Operation | TM3 | NiO#2 | Padlle wheel frequency measurements | with TM4 in ITW as measured today in the
electrical room by David and Anders. |
|
537
|
Tuesday, November 12, 2013, 09:51 |
David Wang | ITE | Standard Operation | TM3 | | TM3 disconnection | TM3 has been disconnected this morning
and purged all HV water lines. I found
the power plug for all turbo pump fans wasnt |
|
548
|
Tuesday, November 19, 2013, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move | TM#3 with NiO#2 moved from ITE to the south
hot cell. |
|
551
|
Wednesday, November 20, 2013, 08:50 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | NiO#2 | NiO#2 removed | NiO#2 has been removed from TM3 |
 |
552
|
Wednesday, November 20, 2013, 09:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south hot cell to the north east silo. |
|
554
|
Thursday, November 21, 2013, 12:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | NiO#2 | End of beam target inspection - ANODE does not hold 250V | The target was inspected by Chad and Anders
in the Hot Cell. Electrical megger tests
were done during the assembly. It was found |
|
556
|
Monday, November 25, 2013, 11:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the north east silo to the south hot cell. |
|
558
|
Wednesday, November 27, 2013, 12:50 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Ground devices wiring check | Travis and I completed an electrical
check on the wiring harness for the devices
on the ground plane. All lines passed 500V |
|
559
|
Wednesday, November 27, 2013, 15:24 |
Bevan Moss | South Hot-Cell | Maintenance | TM3 | | Wiring Harness Electrical Test | Maico removed the containment box
today allow Travis and I to further test
the wiring harness. I disconnected the junction |
|
560
|
Friday, November 29, 2013, 11:54 |
chad fisher | South Hot-Cell | Repair | TM3 | | Steerer short investegation | Using in cell camera and transit the suspect
line on the steerers was inspected as best
as possible. An existing photo of the complete |
  |
561
|
Friday, November 29, 2013, 11:57 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Steerer short investegation |
|
|
562
|
Monday, December 02, 2013, 11:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south hot cell to the northeast silo. |
|
610
|
Tuesday, March 04, 2014, 10:19 |
Travis Cave | ITE | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the silo to the
east target station. |
|
613
|
Thursday, March 06, 2014, 06:58 |
David Wang | ITE | Maintenance | TM3 | | ITE vacuum and leak check on ITE BL2A window flange. | ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low |
|
616
|
Friday, March 07, 2014, 12:45 |
David Wang | ITE | Standard Operation | TM3 | | TM3 and ITE air to vacuum leak check and TM3 water lines helium test. | With TM3 located in ITE, All air to vacuum
seals on ITE primary and secondary
vacuum vessel have been leak checked |
    |
617
|
Monday, March 10, 2014, 09:39 |
Travis Cave | ITE | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the east target station to the south west
silo. |
|
637
|
Friday, April 04, 2014, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved from
the south west silo to the south hot cell. |
|
640
|
Monday, April 07, 2014, 10:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical check | TM#3 electrical check at the south hot
cell with no target to give us a base line
and show that things are ok with the module |
|