Entry  Monday, December 02, 2013, 11:29, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the south hot cell to the northeast silo.
Entry  Tuesday, March 04, 2014, 10:19, Travis Cave, ITE, Standard Operation, TM3, no target, module move 
TM#3 has been moved from the silo to the east target station.
Entry  Thursday, March 06, 2014, 06:58, David Wang, ITE, Maintenance, TM3, , ITE vacuum and leak check on ITE BL2A window flange. 
ITE and TM3 Turbo pumps have been started successfully yesterday. The vacuum reading on all ITE high vacuum gauges are at low E-6 range after one night
pumping down which are good so far. There is no any sign of leak on BL2A window and the flange seal on ITE side. Yesterday afternoon, Ron , Edi ,and I 
did a leak check on the ITE BL2A window flange(2aTunnel side). The leak detector was hooked onto BL2A in tunnel. Ron and I supplied helium from TH 
Entry  Friday, March 07, 2014, 12:45, David Wang, ITE, Standard Operation, TM3, , TM3 and ITE air to vacuum leak check and TM3 water lines helium test. 001.JPG002.JPG003.JPG010.JPG013.JPG
With TM3 located in ITE, All air to vacuum seals  on ITE primary and secondary vacuum vessel have been leak  checked with leak detector hooked
directly on the TM3 service cap.The base LR :00xE-9atm.cc/sec. The ITE IG1 was 1.6xE-6 torr which was good. No leak has been found during the checking.Also,
the TM3 water lines(except HS) had been  pressurized with 70 psi helium on each for 2 minutes. There was no response during the test. The ITE and
Entry  Monday, March 10, 2014, 09:39, Travis Cave, ITE, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the east target station to the south west silo.
Entry  Friday, April 04, 2014, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the south west silo to the south hot cell.
Entry  Monday, April 07, 2014, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_test_no_target.PDF
TM#3 electrical check at the south hot  cell with no target to give us a base line and show that things are ok with the module for the start of
the running year.
Entry  Monday, April 07, 2014, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check TM#3_elec_test_TiC#4_surf.PDF
Electrical test of TM#3 with TiC#4 attached. See PDF.
Entry  Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation 
TiC#4 has been installed onto TM3
Entry  Tuesday, April 08, 2014, 09:05, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move 
TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, April 09, 2014, 11:10, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 heat shield circuit leack check at SHC 
This Monday morning, Chad and I leak checked heat shielding circuit on TM3 with new target installed. The base LR on LD :0.0xE-9 atm.cc/sec, base pressure
0.0xE-4 torr. Chad sprayed helium twice on the VCR joints. No leak has been found. The circuit will be pressured with helium at CS.
Entry  Thursday, April 10, 2014, 14:03, Bevan Moss, Conditioning Station, Standard Operation, TM3, TiC#4, HV conditioning 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt
 The TiC#4 target that is on TM3 was conditioned to 25kV today with the EINZEL lens at 12.5kV. There was one spark shortly after reaching 25kV that
reset the bias PS and another one  after the module sat at 25kV for ~30 minutes. Attached is the strip tool data and screen shot. Prior to starting
the conditioning the power on the chiller needed to by cycled as the VFD on the fans had tripped due to a recurring inrush problem.
Entry  Friday, April 11, 2014, 11:35, David Wang, Conditioning Station, Standard Operation, TM3, , Helium pressure test on TM3 HS water line with new Ta target. at CS 6x
The helium pressure test on TM3 HS water line with new Ta target is finished at CS. The circuit is leak tight.. No any response on LD. See pictures.
Entry  Tuesday, April 15, 2014, 08:53, Travis Cave, ITE, Standard Operation, TM3, TiC#4, module move 
TM#3 with TiC#4 has been moved from the conditioning station to the east target station.
    Reply  Wednesday, April 16, 2014, 10:16, Anders Mjos, ITW, Development, TM3, Ta#42, Flow meters installed on Heat Shield and Coil water return 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Monday, May 05, 2014, 10:40, Travis Cave, ITE, Standard Operation, TM3, TiC#4, module move 
TM#3 with TiC#4 has been moved from the east station to the south west silo.
Entry  Monday, May 05, 2014, 13:05, David Wang, ITE, Repair, TM3, , ITE target module flange seal has been replaced. 004.JPG008.JPG008.JPG007.JPG
ITE target module flange seal has been replaced.The flan surface and the o-ring groove have been cleaned with Acetone before the new seal is installed.
See attached picture.
Entry  Monday, May 05, 2014, 13:11, David Wang, ITE, Repair, TM3, , ITE Entrance module has been disconnected. 011.JPG025.JPG033.JPG035.JPG032.JPG
ITE entrance module has been disconnected and the lifting yoke is installed for module move. See attached pictures.
Entry  Wednesday, May 07, 2014, 10:08, David Wang, ITE, Repair, TM3, , ITE entrance module flange seal had been replaced. 7x
ITE entrance module flange seal had been replaced yesterday.The flange and the seal groove were cleaned with Acetone before the new seal is installed.
See pictures
Entry  Wednesday, May 07, 2014, 10:15, David Wang, ITE, Repair, TM3, , ITE TM3, entrance module and BL2A3 window flange seals leak check.. 
ITE TM3, entrance module, and 2A3 window flange seals have been leak checked this morning after 2 new seals replacement.The LD base leak rate was 0.0xE-9
atm.cc/sec,  base pressure was 0.0 XE-4 Torr. I sprayed lots helium around the TM3, entrance module and 2A3 flange seals. No any response had been
found on LD during the  spraying. All three flanges are sealed perfectly now.