  562   Monday, December 02, 2013, 11:29 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the northeast silo.
  
  610   Tuesday, March 04, 2014, 10:19 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 has been moved from the silo to the
east target station.
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  616   Friday, March 07, 2014, 12:45 David WangITEStandard OperationTM3 TM3 and ITE air to vacuum leak check and TM3 water lines helium test.With TM3 located in ITE, All air to vacuum
seals  on ITE primary and secondary
vacuum vessel have been leak  checked
 001.JPG002.JPG003.JPG010.JPG013.JPG 
  617   Monday, March 10, 2014, 09:39 Travis CaveITEStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the east target station to the south west
silo.
  
  637   Friday, April 04, 2014, 14:16 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south west silo to the south hot cell.
  
  640   Monday, April 07, 2014, 10:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical checkTM#3 electrical check at the south hot 
cell with no target to give us a base line
and show that things are ok with the module
 TM#3_elec_test_no_target.PDF 
  641   Monday, April 07, 2014, 11:49 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical checkElectrical test of TM#3 with TiC#4 attached.
See PDF.
 TM#3_elec_test_TiC#4_surf.PDF 
  642   Monday, April 07, 2014, 14:13 chad fisherSouth Hot-CellStandard OperationTM3TiC#4TiC#4 installationTiC#4 has been installed onto TM3   
  643   Tuesday, April 08, 2014, 09:05 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
south hot cell to the conditioning station.
  
  644   Wednesday, April 09, 2014, 11:10 David WangSouth Hot-CellStandard OperationTM3 TM3 heat shield circuit leack check at SHCThis Monday morning, Chad and I leak checked
heat shielding circuit on TM3 with new target
installed. The base LR on LD :0.0xE-9 atm.cc/sec,
  
  645   Thursday, April 10, 2014, 14:03 Bevan MossConditioning StationStandard OperationTM3TiC#4HV conditioning The TiC#4 target that is on TM3 was
conditioned to 25kV today with the EINZEL
lens at 12.5kV. There was one spark shortly
 10042014_Tm3_TiC#4_HV_conditioning.JPG10042014_TM3_TiC#4_HV_conditioning.txt 
  646   Friday, April 11, 2014, 11:35 David WangConditioning StationStandard OperationTM3 Helium pressure test on TM3 HS water line with new Ta target. at CSThe helium pressure test on TM3 HS water
line with new Ta target is finished at CS.
The circuit is leak tight.. No any response
 6x 
  650   Tuesday, April 15, 2014, 08:53 Travis CaveITEStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
conditioning station to the east target station.
  
  651   Wednesday, April 16, 2014, 10:16 Anders MjosITWDevelopmentTM3Ta#42Flow meters installed on Heat Shield and Coil water return 

    
  
  654   Monday, May 05, 2014, 10:40 Travis CaveITEStandard OperationTM3TiC#4module moveTM#3 with TiC#4 has been moved from the
east station to the south west silo.
  
  655   Monday, May 05, 2014, 13:05 David WangITERepairTM3 ITE target module flange seal has been replaced.ITE target module flange seal has been
replaced.The flan surface and the o-ring
groove have been cleaned with Acetone before
 004.JPG008.JPG008.JPG007.JPG 
  656   Monday, May 05, 2014, 13:11 David WangITERepairTM3  ITE Entrance module has been disconnected.ITE entrance module has been disconnected
and the lifting yoke is installed for module
move. See attached pictures.
 011.JPG025.JPG033.JPG035.JPG032.JPG 
  658   Wednesday, May 07, 2014, 10:08 David WangITERepairTM3 ITE entrance module flange seal had been replaced.ITE entrance module flange seal had been
replaced yesterday.The flange and the seal
groove were cleaned with Acetone before the
 7x 
  659   Wednesday, May 07, 2014, 10:15 David WangITERepairTM3 ITE TM3, entrance module and BL2A3 window flange seals leak check..ITE TM3, entrance module, and 2A3 window
flange seals have been leak checked this
morning after 2 new seals replacement.The
  