  RH-ISAC, Page 43 of 141  Not logged in ELOG logo
ID Datedown Author Category Type Module Target/Number Subject
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
  1977   Thursday, September 05, 2019, 14:18 Adam NewsomeSouth Hot-CellStandard OperationTM4UCx#27TM4 Move

TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station.

  1976   Thursday, September 05, 2019, 11:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#27UCx#27 install

Dummy Ta target has been removed from TM4 and UCx#27 installed

  1975   Wednesday, September 04, 2019, 13:53 chad fisherSouth Hot-CellRepairTM4 TM3 CB to TM4

The TM3 containment box has been installed onto TM4. No issues, leak checked ok.

 

  1974   Tuesday, September 03, 2019, 10:49 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 Move

TM4 has been moved from the Conditioning Station to the South Hot-Cell.

  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the South Hot-Cell to the Middle-East silo.

  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the Middle-East silo to the South Hot Cell.

  1971   Tuesday, August 27, 2019, 13:12 Adam NewsomeSafe Module ParkingDevelopment  SMP Remote Control Wiring Inspection

The wiring for the SMP remote control module was inspected by Joel Semilla (TRIUMF electrician). The module was plugged in to verify there were no issues. No changes were suggested, and then wiring was approved.

  1970   Friday, August 23, 2019, 14:27 Isaac EarleSafe Module ParkingDevelopment  SMP camera video cabling installed and tested

 Installation of the video lines for the SMP cameras was completed yesterday according to IRH1670 Rev B.  All four cameras were confirmed to be displaying properly in the crane control room.  The cameras are powered from an outlet wired to circuit 35/37 on Panel #443 (located in the NHCSA).  This is independent from the power supply for other existing camera systems in the Target Hall.  The SMP turntable was rotated through the full range of motion (reached CW and CCW limits) and the cable routing and reel take-up system performed as expected.

  1969   Thursday, August 22, 2019, 09:20 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the south west silo to the south hot cell.

  1968   Friday, August 16, 2019, 14:23 Carla BabcockITERepairTM2ZrC#8TM2 electrical checks in ITE

Ramped voltage on TM2 up to 30kV with no problems. Bias current is at 29uA, same as original TM2 bias current (see archiver for ITE June 15th, before protons) and similar to 31uA right after protons went off on Aug. 6.

TGHT=0A

TBHT=0A

BIAS V=30kV

BIAS current = 29uA

EZL V= 15kV

EZL current= 51uA

EE V= 1kV

EE current= 0.952mA

IG1= 8.6e-7

protons=0

This seems ok despite poor electrical checks showing 300 MOhm resistance between HV and ground. These values indicate a resistance of 1 GOhm. Let's see what happens when protons are on.

For future (optimistic) reference when testing protons:

BIAS=35kV, 35uA

EZL-17.5kV, 60uA

BIAS=38kV, 37uA

EZL=18.5kV, 63uA

  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.

TM4 is moved from TCS to SW silo this morning. The move is good.

  1966   Friday, August 16, 2019, 08:51 David WangConditioning StationRepairTM4 TM4 waterlines helium pressure test at TCS.

LD base leak rate, 0.0Xe-9atm.cc/sec. Helium pressure, 70psi. 5 minutes each circuit. No response on all water line except containment box window which has a VCR leak issue now. Window line leak rate, 2.3Xe-4 atm.cc/sec.

  1965   Friday, August 16, 2019, 08:46 David WangITEStandard OperationTM4ZrC #8.TM2 has been connected in ITE.

TM2 has been connected in ITE. turbo pumps have been started. ITE  and TM2 vacuum are good.

  1964   Thursday, August 15, 2019, 09:45 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check

 Electrical of TM#2 with ZrC#8 at the south hot cell. See attached for details.

Attachment 1: TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
  1963   Thursday, August 15, 2019, 09:36 Adam NewsomeITEStandard OperationTM2ZrC #8TM2 Move

TM2 was moved from South Hot Cell to ITE. ZrC #8 target.

  1962   Wednesday, August 14, 2019, 11:43 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58 and no target.Results of electrical checks post beam at the south hot cell.

 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached.

Attachment 1: TM2_elec_chk_Ta58_post_beam_shc.pdf
TM2_elec_chk_Ta58_post_beam_shc.pdf
Attachment 2: TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
  1961   Wednesday, August 14, 2019, 08:55 David WangITEStandard OperationTM2 TM2 has been disconnected in ITE.

TM2 has been disconnected in ITE. The bias jumper between U and T was burned out during the last beam time.

  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 Move

TM2 was moved from ITE to South Hot Cell. Tantalum 58 target.

  1959   Thursday, August 08, 2019, 09:33 Carla BabcockITEDevelopmentTM2Ta#58TM2 HV conditioning with protons, round 1

Starting HV tests on TM2 with 50uA of protons.

Tuesday, August 06, 2019, 03:37 : Ramping up 500V every 2mins or so, couple of sparks, then consistent sparks at 34kV. No vacuum response on IG1 for any sparks, even though the current spikes from around 40uA to 1300uA. Brought it down to 28kV to stop sparking. See a response on the EZL frequently.

Tuesday, August 06, 2019, 05:24 : Going above 30kV proves very difficult, lots of up and down, frequent sparks, still no vacuum response. Still seeing an EZL response.

Tuesday, August 06, 2019, 05:58 : Up to 31.5kV on bias, 1046V on EE and 15kV on EZL.

Tuesday, August 06, 2019, 06:50 : Controls are being sticky - not responding well.

Tuesday, August 06, 2019, 07:25 : Sat at 32 kV > 20mins with 2 sparks

Tuesday, August 06, 2019, 08:03 : lots of sparking at 36kV, went back down to 35kV. Current draw is 50uA.

Tuesday, August 06, 2019, 08:10 : lots of sparking after 9 mins at 35kV, had to turn it down to 34kV

Tuesday, August 06, 2019, 08:11 : Still sparking at 34, down to 33

Tuesday, August 06, 2019, 08:31 : At 33kV, sparked twice in 20mins and was going for another when the protons went off.

With protons off, the bias current dropped quickly from 66uA to 40uA and raising the bias to 40kV was not difficult.  Later bias up to 50kV. Still no conclusion on if the sparking was inside or outside of the vacuum. No vacuum response seems to indicate outside, however the influence of protons would indicate inside. To be investigated visually when TM2 comes to the HC.