  1566   Monday, June 26, 2017, 11:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#52UC#20 Removed Ta#52 installedUC#20 has been removed from TM4 and put
in a bucket back-filled with argon. Ta#52
has been installed onto TM4 with new fasteners.
  
  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station.
  
  1568   Tuesday, June 27, 2017, 10:26 David WangSouth Hot-CellStandard OperationTM4Ta#52Leak check on TM4 HS line at SHCLD base LR:0.0Xe-9 atm.cc/sec. No leak
has been found during the check.  The
HS line will be helium pressurized at TCS
  
  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical CheckResults of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum.
 TM4_Ta52_Elec_chk_SHC_CSvac.PDF 
  1571   Wednesday, June 28, 2017, 10:00 David WangConditioning StationStandard OperationTM4Ta#52TM2 has been connected at TCSI started TCS water system.   
  1572   Wednesday, June 28, 2017, 16:43 Anders MjosConditioning StationStandard OperationTM4Ta#52Conditioning Ta#52NEW HV cable for BIAS installed earlier
this week.
Wednesday, June 28, 2017, 16:42:
 Ta#52.docx 
  1576   Wednesday, July 05, 2017, 11:18 Anders MjosConditioning StationMaintenanceTM4Ta#52Changed electrical configuration to cathode bias John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode.
  
  1581   Tuesday, July 11, 2017, 10:20 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station.
  
  1602   Monday, August 28, 2017, 11:28 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the east station to the south hot cell.
  
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target moveThe spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details.
 Vault_Storage_August_30_2017.pdf 
  1486   Tuesday, April 11, 2017, 11:30 Travis CaveSouth Hot-CellStandard OperationTM2Ta#51Electrical CheckElectrical check performed on TM#2 with
Ta#51, see attached PDF.
 TM2_Ta51_SHC_elec_chk.PDF 
  1487   Tuesday, April 11, 2017, 14:02 Travis CaveConditioning StationStandard OperationTM2Ta#51module movedTM#2 with Ta#51 has been moved from the
south hot cell to the conditioning station.
  
  1496   Thursday, April 13, 2017, 11:44 Anders MjosConditioning StationStandard OperationTM2Ta#51Conditioning Ta#51 Thursday, April 13, 2017, 11:43:
Water package started.
  
  1908   Thursday, April 18, 2019, 10:04 Travis CaveSouth Hot-CellMaintenance Ta#50, SiC#34, Ta#46, Ta#47, and Ta#45Target transfer from old pail to new pail. Targets Ta#50 and SiC#34 have been
transferred from their old pails to new ones.
Ta#50 was done on April 12th 2019 it was
  
  1429   Friday, January 27, 2017, 08:46 chad fisherSouth Hot-CellStandard OperationTM4Ta#50 Ta#50 RemovedTa#50 has been was removed from TM4 on
Wednesday, January 25th.
  
  1388   Wednesday, November 02, 2016, 09:12 Travis CaveConditioning StationStandard OperationTM4Ta#50module movedTM#4 with Ta#50 has been moved from the
south hot cell to the conditioning station.
  
  1394   Tuesday, November 08, 2016, 10:23 Travis CaveITEStandard OperationTM4Ta#50module movedTM#4 with Ta#50 has been moved to the east
target station.
  
  1428   Friday, January 27, 2017, 08:44 chad fisherSouth Hot-CellStandard OperationTM2Ta#50UCx #18 - Ta Feibiad Dummy installed. Target Change Waterline interferenceOn Tuesday, January 24th UCx#18 was removed
from TM2 and Ta febiad dummy installed. I
encountered the same issue mounting the new
 TM2_Waterline_interference.jpg 
  2047   Monday, January 13, 2020, 14:19 Travis CaveSpent Target VaultStandard Operation Ta#49 and Ta#52spent target repackaging and moved to mini vault. Targeta Ta#49 and Ta#52 have been
repackaged anf moved to the mini vault. Ta#49
was taken out of pail number 146 and placed
  
  1334   Wednesday, August 24, 2016, 11:06 Travis CaveSouth Hot-CellStandard OperationTM2Ta#49module moved and electrical checkTM#2 with Ta#49 has had its electrical
check and was moved to the conditioning station.
see the attached pdf for the electrical check
 TM2_elechk_SiC34_SHC.PDF 