|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
|
2269
|
Wednesday, November 17, 2021, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Repacking of the targets. | Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details. |
|
|
1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check | Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed |
|
|
1768
|
Monday, August 20, 2018, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#56 and UC#23 | Electrical Check | Electrical Checks of the last two
targets Ta#56 and UC#23 |
|
|
1754
|
Wednesday, July 18, 2018, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#56 | Ta#56 Installed | Ta#56 has been installed onto TM4 with
new fasteners. High current fasteners torqued
to 130 in lbs. |
|
|
1757
|
Monday, July 23, 2018, 10:31 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#56 | Module move | TM#4 with Ta#56 has been moved from
the conditioning station to the east target
station. |
|
|
1769
|
Tuesday, August 28, 2018, 10:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56 | Module move | TM#4 with Ta#56 has been moved from
the east station to the south hot cell. |
|
|
1770
|
Tuesday, August 28, 2018, 14:19 |
David Wang | ITE | Standard Operation | TM4 | Ta#56 | TM4 Ta#56 disconenction. | TM4 has been disconnected in ITE this morning.
See attachment. |
|
|
1773
|
Thursday, August 30, 2018, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Spent Target Move | Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault. |
|
|
2261
|
Friday, October 29, 2021, 12:27 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Repacking of the target. | Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon |
|
|
1656
|
Thursday, November 09, 2017, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | Leak check on TM2 HS line at SHC and TCS. | The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak. It was helium pressurized |
|
|
1657
|
Thursday, November 09, 2017, 09:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | TM2 has been connected at TCS | TCS vacuum system and water system have
been started as well. Everything looks fine. |
|
|
1658
|
Thursday, November 09, 2017, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#55 | Conditioning Ta#55 | Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed |
|
|
1661
|
Tuesday, November 14, 2017, 10:01 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access |
|
|
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. | TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine. |
|
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
|
1698
|
Monday, April 09, 2018, 09:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell. |
|
|
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move | Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell, |
|
|
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check | The results of the various electrical
check done on the target module on November
7th and 8th of 2017. Checks were done with |
|
|
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check | Electrical check of TM#2 with Ta#54 at
the south hot cell. See attached PDF for
details. |
|
|
1627
|
Wednesday, September 27, 2017, 08:00 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Ta#54 installed | Containment box has been replaced onto
TM2, interior of containment box vacuumed,
and Ta#54 installed with new fasteners (high |
|