Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 40 of 140  Not logged in ELOG logo
Entry  Tuesday, November 27, 2018, 11:05, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#57, Module move 

 TM#4 with Ta#57 has been moved from the east target station to the south hot cell.

Entry  Tuesday, November 27, 2018, 13:31, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#57, Ta#57 removal 

Ta#57 has been removed from TM4.

Entry  Friday, November 30, 2018, 10:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Spent Target Move Target_Index_2018-11-30.pdf

 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details.

Entry  Wednesday, November 17, 2021, 11:42, Travis Cave, Spent Target Vault, Standard Operation, , Ta#57, Repacking of the targets. Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf

 Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details.

Entry  Thursday, August 30, 2018, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#56, UC#24, and no target, Electrical Check TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdfTM#4_No_Target_Electrical_Check_Aug-29-2018.pdfTM#4_UC#24_Electrical_Check_SHC.pdf

 Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4.

Entry  Monday, August 20, 2018, 09:55, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#56 and UC#23, Electrical Check Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf

 Electrical Checks of the last two targets Ta#56 and UC#23

Entry  Wednesday, July 18, 2018, 14:20, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#56, Ta#56 Installed 

Ta#56 has been installed onto TM4 with new fasteners. High current fasteners torqued to 130 in lbs.

RIB "shield" has been removed in  preparation for insertion of new optics tray.

Entry  Monday, July 23, 2018, 10:31, Travis Cave, ITE, Standard Operation, TM4, Ta#56, Module move 

 TM#4 with Ta#56 has been moved from the conditioning station to the east target station.

Entry  Tuesday, August 28, 2018, 10:53, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#56, Module move 

 TM#4 with Ta#56 has been moved from the east station to the south hot cell.

Entry  Tuesday, August 28, 2018, 14:19, David Wang, ITE, Standard Operation, TM4, Ta#56, TM4 Ta#56 disconenction. TM4_Ta#56_disconnection..pdf

TM4 has been disconnected in ITE this morning. See attachment.

Entry  Thursday, August 30, 2018, 11:13, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Spent Target Move Target_Index_2018-08-30.pdf

 Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details.

Entry  Friday, October 29, 2021, 12:27, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Repacking of the target. Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf

 Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details.

Entry  Thursday, November 09, 2017, 09:34, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, Leak check on TM2 HS line at SHC and TCS. 

The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak.  It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result  is same as last time check. No concern.

Entry  Thursday, November 09, 2017, 09:35, David Wang, Conditioning Station, Standard Operation, TM2, Ta#55, TM2 has been connected at TCS 

TCS vacuum system and water system have been started as well. Everything looks fine.

Entry  Thursday, November 09, 2017, 10:39, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#55, Conditioning Ta#55 

Thursday, November 09, 2017, 10:40: BIAS / EL to 30 / 15 kV. 400 uA on BIAS

Bias was stable for 1 hour. Handed over to RIB ops for heater conditioning.

Entry  Tuesday, November 14, 2017, 10:01, Travis Cave, ITW, Standard Operation, TM2, Ta#55, Module move 

 TM#2 with Ta#55 has been moved from the conditioning station to the west target station. The field was measured on the access panel to the service chase and the field was found to be 430uSv/hr at one meter from the module.

Entry  Tuesday, November 14, 2017, 14:34, David Wang, ITW, Standard Operation, TM2, Ta#55, TM2 has been connected in ITW. 

TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine.

Entry  Tuesday, February 13, 2018, 13:56, Anders Mjos, ITW, Standard Operation, TM2, Ta#55, Target module disconnected 

TM disconnected by David and Yasmine Feb 8th. One of the water couplings were leaking for a short while when disconnected. NCR 10836 submitted by Max

Entry  Monday, April 09, 2018, 09:57, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#55, Module move 

 TM#2 with Ta#55 has been moved from the west target station to the south hot cell.

Entry  Monday, April 16, 2018, 14:51, Travis Cave, Spent Target Vault, Standard Operation, , Ta#55, Spent Target Move 

 Ta#55 has been moved from the south hot cell to the spent target vault. It was 30.4mSv/hr upon removal from the hotcell, placed in pail #161 and put in spot 7A of the vault.

ELOG V2.9.2-2455