  RH-ISAC, Page 40 of 141  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  1924   Friday, May 17, 2019, 10:47 Travis CaveITEStandard OperationTM2Ta#58Module move

 TM#2 with Ta#58 has been moved from the south hot cell to the east target station.

  1959   Thursday, August 08, 2019, 09:33 Carla BabcockITEDevelopmentTM2Ta#58TM2 HV conditioning with protons, round 1

Starting HV tests on TM2 with 50uA of protons.

Tuesday, August 06, 2019, 03:37 : Ramping up 500V every 2mins or so, couple of sparks, then consistent sparks at 34kV. No vacuum response on IG1 for any sparks, even though the current spikes from around 40uA to 1300uA. Brought it down to 28kV to stop sparking. See a response on the EZL frequently.

Tuesday, August 06, 2019, 05:24 : Going above 30kV proves very difficult, lots of up and down, frequent sparks, still no vacuum response. Still seeing an EZL response.

Tuesday, August 06, 2019, 05:58 : Up to 31.5kV on bias, 1046V on EE and 15kV on EZL.

Tuesday, August 06, 2019, 06:50 : Controls are being sticky - not responding well.

Tuesday, August 06, 2019, 07:25 : Sat at 32 kV > 20mins with 2 sparks

Tuesday, August 06, 2019, 08:03 : lots of sparking at 36kV, went back down to 35kV. Current draw is 50uA.

Tuesday, August 06, 2019, 08:10 : lots of sparking after 9 mins at 35kV, had to turn it down to 34kV

Tuesday, August 06, 2019, 08:11 : Still sparking at 34, down to 33

Tuesday, August 06, 2019, 08:31 : At 33kV, sparked twice in 20mins and was going for another when the protons went off.

With protons off, the bias current dropped quickly from 66uA to 40uA and raising the bias to 40kV was not difficult.  Later bias up to 50kV. Still no conclusion on if the sparking was inside or outside of the vacuum. No vacuum response seems to indicate outside, however the influence of protons would indicate inside. To be investigated visually when TM2 comes to the HC.

  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58

Tuesday, October 01, 2019, 15:15: Started roughing.

Tuesday, October 01, 2019, 16:30: Started TPs

Tuesday, October 01, 2019, 16:34: All TPs at speed


Conditioning completed over the weekend by RIB operations. The shutter was left closed on the module, so no beam could be seen on the FC. Conditioning otherwise OK.

  2511   Friday, December 15, 2023, 11:31 Adam NewsomeSpent Target VaultStandard Operation Ta#58Pail repack, transfer to mini-storage vault

Pail 211 which contained Ta#58 spent target was repackaged into Pail 286 in the South Hot Cell.

The dose rate at approx. 1 m was 4.16 mSv/h.

Pail 286 was transferred to the mini-storage vault and placed in the outermost location. The mini-storage vault is full at this time, in preparation for the next shipment.

Attachment 1: Target_Index_2023-12-15.pdf
Target_Index_2023-12-15.pdf Target_Index_2023-12-15.pdf
  1831   Wednesday, November 28, 2018, 11:31 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57 and UC#26Electrical Check

 Electrical check of TM#4 with the old Ta#57, no target and with new IG-LIS UC#26 target. See attached PDF for details.

Attachment 1: Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf
Elec_Chk_Ta57_Post_Beam_SHC_11-28-28.pdf
Attachment 2: Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf
Elec_Chk_TM4_no_tgt_SHC_11-28-18.pdf
Attachment 3: Elec_Chk_UC26_SHC_11-28-18.pdf
Elec_Chk_UC26_SHC_11-28-18.pdf
Attachment 4: Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
Elec_Chk_UC26_IGLIS_part_SHC_11-28-18.pdf
  1802   Tuesday, October 09, 2018, 13:46 Travis CaveITEStandard OperationTM4Ta#57Module move

 TM#4 with Ta#57 has been moved from the conditioning station to the east target station.

  1803   Wednesday, October 10, 2018, 07:52 David WangITEStandard OperationTM4Ta#57TM4 has been connected in ITE.

TM4 has been connected in ITE. see attachment.

Attachment 1: TM4_with_TA#56_connection_in_ITE.pdf
TM4_with_TA#56_connection_in_ITE.pdf TM4_with_TA#56_connection_in_ITE.pdf TM4_with_TA#56_connection_in_ITE.pdf
  1804   Wednesday, October 10, 2018, 10:50 Travis CaveConditioning StationStandard OperationTM4Ta#57Electrical Check

 The various electrical check done on TM#4 after the UC run and before the start of the Ta run.

Attachment 1: TM#4_UC#24_Electrical_Check_SHC.pdf
TM#4_UC#24_Electrical_Check_SHC.pdf
Attachment 2: TM#4_Elec_Chk_No_Target_Oct-3-2018.pdf
TM#4_Elec_Chk_No_Target_Oct-3-2018.pdf
Attachment 3: TM#4_Elec_Chk_SHC_Ta#57.pdf
TM#4_Elec_Chk_SHC_Ta#57.pdf
  1822   Thursday, November 22, 2018, 08:52 Anders MjosITEStandard OperationTM4Ta#57Closed ITE dump water

Paddle wheel signal was tripping proton beam in ITW. Valved off ITE dump to divert flow to ITW. Field around valve was about 600 uSv/h

  1827   Tuesday, November 27, 2018, 11:05 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57Module move

 TM#4 with Ta#57 has been moved from the east target station to the south hot cell.

  1828   Tuesday, November 27, 2018, 13:31 chad fisherSouth Hot-CellStandard OperationTM4Ta#57Ta#57 removal

Ta#57 has been removed from TM4.

  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move

 The spent Ta#57 target has been moved from the south hot cell to the spent target storage it was placed in pail 174 and placed in spot 8C in the vault. See attached PDF for details.

Attachment 1: Target_Index_2018-11-30.pdf
Target_Index_2018-11-30.pdf Target_Index_2018-11-30.pdf
  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets.

 Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details.

Attachment 1: Target_Index_2021-11-17.pdf
Target_Index_2021-11-17.pdf Target_Index_2021-11-17.pdf Target_Index_2021-11-17.pdf
Attachment 2: Target_Index_2021-11-17_mini_vault.pdf
Target_Index_2021-11-17_mini_vault.pdf Target_Index_2021-11-17_mini_vault.pdf
  1774   Thursday, August 30, 2018, 14:16 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56, UC#24, and no targetElectrical Check

 Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4.

Attachment 1: TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdf
Attachment 2: TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
TM#4_No_Target_Electrical_Check_Aug-29-2018.pdf
Attachment 3: TM#4_UC#24_Electrical_Check_SHC.pdf
TM#4_UC#24_Electrical_Check_SHC.pdf
  1768   Monday, August 20, 2018, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2Ta#56 and UC#23Electrical Check

 Electrical Checks of the last two targets Ta#56 and UC#23

Attachment 1: Electrical_Check_TM4_Ta56_SHC.pdf
Electrical_Check_TM4_Ta56_SHC.pdf
Attachment 2: Electrical_Check_TM2_UC23_CS.pdf
Electrical_Check_TM2_UC23_CS.pdf
Attachment 3: Electrical_Check_TM2_UC23_SHC.pdf
Electrical_Check_TM2_UC23_SHC.pdf
  1754   Wednesday, July 18, 2018, 14:20 chad fisherSouth Hot-CellStandard OperationTM4Ta#56Ta#56 Installed

Ta#56 has been installed onto TM4 with new fasteners. High current fasteners torqued to 130 in lbs.

RIB "shield" has been removed in  preparation for insertion of new optics tray.

  1757   Monday, July 23, 2018, 10:31 Travis CaveITEStandard OperationTM4Ta#56Module move

 TM#4 with Ta#56 has been moved from the conditioning station to the east target station.

  1769   Tuesday, August 28, 2018, 10:53 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56Module move

 TM#4 with Ta#56 has been moved from the east station to the south hot cell.

  1770   Tuesday, August 28, 2018, 14:19 David WangITEStandard OperationTM4Ta#56TM4 Ta#56 disconenction.

TM4 has been disconnected in ITE this morning. See attachment.

Attachment 1: TM4_Ta#56_disconnection..pdf
TM4_Ta#56_disconnection..pdf TM4_Ta#56_disconnection..pdf
  1773   Thursday, August 30, 2018, 11:13 Travis CaveSpent Target VaultStandard Operation Ta#56Spent Target Move

 Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details.

Attachment 1: Target_Index_2018-08-30.pdf
Target_Index_2018-08-30.pdf