  1827   Tuesday, November 27, 2018, 11:05 Travis CaveSouth Hot-CellStandard OperationTM4Ta#57Module move TM#4 with Ta#57 has been moved from
the east target station to the south hot
cell.
  
  1828   Tuesday, November 27, 2018, 13:31 chad fisherSouth Hot-CellStandard OperationTM4Ta#57Ta#57 removalTa#57 has been removed from TM4.   
  1834   Friday, November 30, 2018, 10:28 Travis CaveSpent Target VaultStandard Operation Ta#57Spent Target Move The spent Ta#57 target has been moved
from the south hot cell to the spent target
storage it was placed in pail 174 and placed
 Target_Index_2018-11-30.pdf 
  2269   Wednesday, November 17, 2021, 11:42 Travis CaveSpent Target VaultStandard Operation Ta#57Repacking of the targets. Ta#57 was repacked and placed in
the mini vault. The pail was changed from
#174 to #263. See attached PDF for more details.
 Target_Index_2021-11-17.pdfTarget_Index_2021-11-17_mini_vault.pdf 
  1774   Thursday, August 30, 2018, 14:16 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56, UC#24, and no targetElectrical Check Results of the electrical check with
the spent Ta#56 attached, no target attached
and the UC#24 attached. These test were performed
 TM#4_Ta#56_Electrical_Check_Post_Beam_at_SHC.pdfTM#4_No_Target_Electrical_Check_Aug-29-2018.pdfTM#4_UC#24_Electrical_Check_SHC.pdf 
  1768   Monday, August 20, 2018, 09:55 Travis CaveSouth Hot-CellStandard OperationTM2Ta#56 and UC#23Electrical Check Electrical Checks of the last two
targets Ta#56 and UC#23
 Electrical_Check_TM4_Ta56_SHC.pdfElectrical_Check_TM2_UC23_CS.pdfElectrical_Check_TM2_UC23_SHC.pdf 
  1754   Wednesday, July 18, 2018, 14:20 chad fisherSouth Hot-CellStandard OperationTM4Ta#56Ta#56 InstalledTa#56 has been installed onto TM4 with
new fasteners. High current fasteners torqued
to 130 in lbs.
  
  1757   Monday, July 23, 2018, 10:31 Travis CaveITEStandard OperationTM4Ta#56Module move TM#4 with Ta#56 has been moved from
the conditioning station to the east target
station.
  
  1769   Tuesday, August 28, 2018, 10:53 Travis CaveSouth Hot-CellStandard OperationTM4Ta#56Module move TM#4 with Ta#56 has been moved from
the east station to the south hot cell.
  
  1770   Tuesday, August 28, 2018, 14:19 David WangITEStandard OperationTM4Ta#56TM4 Ta#56 disconenction.TM4 has been disconnected in ITE this morning.
See attachment.
 TM4_Ta#56_disconnection..pdf 
  1773   Thursday, August 30, 2018, 11:13 Travis CaveSpent Target VaultStandard Operation Ta#56Spent Target Move Ta#56 has been moved from the south
hot cell to the storage vault. It was placed
in pail#169 and place in slot 2C of the vault.
 Target_Index_2018-08-30.pdf 
  2261   Friday, October 29, 2021, 12:27 Travis CaveSpent Target VaultStandard Operation Ta#56Repacking of the target. Ta#56 in pail #169 was repacked and
placed into #269 and was placed in the mini
vault at the back. It was 3.86mSv/hr upon
 Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf 
  1656   Thursday, November 09, 2017, 09:34 David WangConditioning StationStandard OperationTM2Ta#55Leak check on TM2 HS line at SHC and TCS.The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak.  It was helium pressurized
  
  1657   Thursday, November 09, 2017, 09:35 David WangConditioning StationStandard OperationTM2Ta#55TM2 has been connected at TCSTCS vacuum system and water system have
been started as well. Everything looks fine.
  
  1658   Thursday, November 09, 2017, 10:39 Anders MjosConditioning StationStandard OperationTM2Ta#55Conditioning Ta#55Thursday, November 09, 2017, 10:40: BIAS
/ EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed
  
  1661   Tuesday, November 14, 2017, 10:01 Travis CaveITWStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access
  
  1662   Tuesday, November 14, 2017, 14:34 David WangITWStandard OperationTM2Ta#55TM2 has been connected in ITW.TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine.
  
  1686   Tuesday, February 13, 2018, 13:56 Anders MjosITWStandard OperationTM2Ta#55Target module disconnectedTM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR
  
  1698   Monday, April 09, 2018, 09:57 Travis CaveSouth Hot-CellStandard OperationTM2Ta#55Module move TM#2 with Ta#55 has been moved from
the west target station to the south hot
cell.
  
  1700   Monday, April 16, 2018, 14:51 Travis CaveSpent Target VaultStandard Operation Ta#55Spent Target Move Ta#55 has been moved from the south
hot cell to the spent target vault. It was
30.4mSv/hr upon removal from the hotcell,
  