ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2269
|
Wednesday, November 17, 2021, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Repacking of the targets. |
Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details. |
1774
|
Thursday, August 30, 2018, 14:16 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56, UC#24, and no target | Electrical Check |
Results of the electrical check with the spent Ta#56 attached, no target attached and the UC#24 attached. These test were performed on TM#4. |
1768
|
Monday, August 20, 2018, 09:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#56 and UC#23 | Electrical Check |
Electrical Checks of the last two targets Ta#56 and UC#23 |
1754
|
Wednesday, July 18, 2018, 14:20 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#56 | Ta#56 Installed |
Ta#56 has been installed onto TM4 with new fasteners. High current fasteners torqued to 130 in lbs.
RIB "shield" has been removed in preparation for insertion of new optics tray. |
1757
|
Monday, July 23, 2018, 10:31 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#56 | Module move |
TM#4 with Ta#56 has been moved from the conditioning station to the east target station. |
1769
|
Tuesday, August 28, 2018, 10:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#56 | Module move |
TM#4 with Ta#56 has been moved from the east station to the south hot cell. |
1770
|
Tuesday, August 28, 2018, 14:19 |
David Wang | ITE | Standard Operation | TM4 | Ta#56 | TM4 Ta#56 disconenction. |
TM4 has been disconnected in ITE this morning. See attachment. |
1773
|
Thursday, August 30, 2018, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Spent Target Move |
Ta#56 has been moved from the south hot cell to the storage vault. It was placed in pail#169 and place in slot 2C of the vault. Also the vault is now full with 24 spent targets and can no longer accept any new targets. See the attached PDF for further details. |
2261
|
Friday, October 29, 2021, 12:27 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Repacking of the target. |
Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details. |
1656
|
Thursday, November 09, 2017, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | Leak check on TM2 HS line at SHC and TCS. |
The TM2 HS line was leak checked at SHC yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed by Chad, NO leak. It was helium pressurized at TCS this morning. Leak rat:2.5 XE-7 atm.c/sec. The result is same as last time check. No concern. |
1657
|
Thursday, November 09, 2017, 09:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | TM2 has been connected at TCS |
TCS vacuum system and water system have been started as well. Everything looks fine. |
1658
|
Thursday, November 09, 2017, 10:39 |
Anders Mjos | Conditioning Station | Standard Operation | TM2 | Ta#55 | Conditioning Ta#55 |
Thursday, November 09, 2017, 10:40: BIAS / EL to 30 / 15 kV. 400 uA on BIAS
Bias was stable for 1 hour. Handed over to RIB ops for heater conditioning. |
1661
|
Tuesday, November 14, 2017, 10:01 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#55 | Module move |
TM#2 with Ta#55 has been moved from the conditioning station to the west target station. The field was measured on the access panel to the service chase and the field was found to be 430uSv/hr at one meter from the module. |
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. |
TM2 has been connected in ITW. All turbo-pumps are started. Everything works fine. |
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected |
TM disconnected by David and Yasmine Feb 8th. One of the water couplings were leaking for a short while when disconnected. NCR 10836 submitted by Max |
1698
|
Monday, April 09, 2018, 09:57 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#55 | Module move |
TM#2 with Ta#55 has been moved from the west target station to the south hot cell. |
1700
|
Monday, April 16, 2018, 14:51 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#55 | Spent Target Move |
Ta#55 has been moved from the south hot cell to the spent target vault. It was 30.4mSv/hr upon removal from the hotcell, placed in pail #161 and put in spot 7A of the vault. |
1659
|
Monday, November 13, 2017, 13:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 and #55 | Electrical Check |
The results of the various electrical check done on the target module on November 7th and 8th of 2017. Checks were done with the old Ta#54 target without a target and finally with the new Ta#55 target. See the attached PDF for results. |
1626
|
Tuesday, September 26, 2017, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Electrical Check |
Electrical check of TM#2 with Ta#54 at the south hot cell. See attached PDF for details. |
1627
|
Wednesday, September 27, 2017, 08:00 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#54 | Ta#54 installed |
Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130 in lbs). |