Entry  Tuesday, December 04, 2018, 12:36, David Wang, ITE, Standard Operation, TM4, UCx 26., TM4 has been connected in ITE/ Checklist. UCx26_TM4_connection_checklist.pdf

TM4 has been connected in ITE. See attachment for connection checklist

Entry  Wednesday, October 10, 2018, 07:52, David Wang, ITE, Standard Operation, TM4, Ta#57, TM4 has been connected in ITE. TM4_with_TA#56_connection_in_ITE.pdf

TM4 has been connected in ITE. see attachment.

Entry  Wednesday, February 03, 2021, 09:14, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 from TCS to SW silo. 

TM4 is moved from TCS to SW silo. The moving is smooth.

 

 

 

 

 

 

 

 

 

 

 

Entry  Thursday, March 14, 2013, 07:09, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 electrical test at SHC after windown and containment box back. 

TM4 electrical test at SHC after windown and containment box back is done. Everything is fine.

Entry  Tuesday, January 24, 2023, 14:22, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#41, TM4 electrical check with and without target at SHC TM4_electrical_check_with_UCX41_and_without_target_2023_Jan.pdf

TM4 electrical check with UCX41target and without target at SHC.  The results are good. See attachment.

Entry  Tuesday, June 21, 2022, 17:49, Frank Song, ITE, Standard Operation, TM4, UCx#37, TM4 disconnection TM4_with_UCx#37_disconnection_in_ITE.jpg

 the module with target UCx37 was disconnected in ITE.

Entry  Tuesday, May 22, 2012, 12:36, David Wang, ITE, Standard Operation, TM4, sic 27, TM4 connection in ITE 

All TM4 connections in ITE is done. The station and TM4 is under roughing now.

Entry  Friday, September 13, 2019, 13:36, David Wang, ITW, Standard Operation, TM4, UCX27, TM4 conenction in ITW checklist TM4_UCx27_connection_checklist.pdf

TM4 was connected in ITW this Tuesday. See attachment for checklist.

Entry  Friday, January 26, 2024, 11:57, David Wang, Safe Module Parking, Standard Operation, TM4, , TM4 coil1, 2, and HS electrical check at SMP after module moving. 

TM4 coil1, 2 and HS are all OL at 250V at SMP after module move. This week, Chad and Carl fixed short issue on coil1, 2 and HS by insert dropped ultem ring back to position at SHC.

Entry  Friday, September 13, 2013, 08:05, David Wang, South Hot-Cell, Repair, TM4, , TM4 coil 1 leak check in SHC TM4_coil_1_leak_check.pdf

Leak checked TM4 coil1 in SHC with Isaac . The leak detector only can pump down to 1.5xE-7 atm.cc/sec. The leak detector got the response once the helium valve is open, not even close to the leak area. The leak detector got a very big response when the helium probe was put close to the coil terminal block on target front side and spray helium for 2 clicks. The leak detector got a small  response when the probe was put close to water block area and spray helium for 2 clicks. The leak is located on the front target side coil line but not from water blocks. The leak is too big to be further pin pointed by this method. See attachment

Entry  Monday, August 11, 2014, 14:27, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 are vented with argon and disconnected at CS. 

TM4 are vented with argon and disconnected at CS this morning.

Entry  Thursday, March 16, 2017, 10:32, David Wang, Spent Target Vault, Repair, TM4, , TM4 and its silo rust photos 13x

I watched rust on TM4 and its silo. Most of rust are on est side of module and silo. See attachments

Entry  Friday, July 05, 2024, 12:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC#7, TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation . 

TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation have been done.  all results are good. I will attach the checklist when printer is back to work.

TM4 HS line was helium pressure tested at TCS this morning. No leak. Also i leak checked TM4 top all air to  vacuum seals at TCS. Everything is good.

TiC #7 is a febiad target.TM4 top has been configured for febiad target. checked pin 2-2 to bias, target ,and chassis at 250V. they are all OL.  

 

Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 

TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.

Entry  Thursday, March 13, 2014, 07:35, David Wang, ITW, Standard Operation, TM4, , TM4 and ITW turbo pumps have been started 

I connected ITW  vacuum system to TM4. TM4 and ITW turbo pumps have been started successfully. The pumping down is good so far.

Entry  Wednesday, March 19, 2014, 15:46, David Wang, ITW, Standard Operation, TM4, , TM4 and ITE air to vacuum leak check and TM4 water lines helium test. 7x

With TM4 located in ITW, All air to vacuum seals  on ITW primary and secondary vacuum vessels have been leak  checked with leak detector hooked directly onto the TM4 service cap.The base LR :00xE-9atm.cc/sec. The ITW IG1 was 1.16xE-6 torr which was good. No leak has been found during the checking.Also, the TM4 water lines(except HS) had been  pressurized with 70 psi helium on each for 2 minutes. There was no response during the test. The ITW and TM4 are good on leak checking.See attachment pictures

Entry  Tuesday, June 02, 2015, 14:39, David Wang, Conditioning Station, Standard Operation, TM4, SiC #31, TM4 and CS turbo- pumps are started . 

TM4 and CS turbo-pumps are started this afternoon. Everything is good so far.

Entry  Friday, July 06, 2012, 14:38, David Wang, Conditioning Station, Standard Operation, TM4, UO#3, TM4 UO#3 target heat shield helium pressure check is done. 

Connected leak detector to TM4 and CS vacuum system. The vacuum readings on TM4 and CS:PNG4 3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic box) 3.9xE-6 Torr. Leak detector base pressure:6.0xE-3 torr, base leak rate: 1.0xE-9 atm.cc/sec. Applied 80 psi helium to heat shield circuit for 5 mins . There is no response on leak detector. The heat shield circuit is leak tight.

Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf

Electrical and leak check are good. See attachment.