Tuesday, April 04, 2017, 14:40, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE
|
all turbo-pumps are started. Everything looks fine so far. |
Tuesday, May 23, 2017, 13:30, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE
|
Yasmine and I connected TM4 in ITE . All turbo pumps are started. |
Wednesday, November 02, 2016, 13:41, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been connected at TCS.
|
All turbo-pumps are started. The pumping down is good so far. |
Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS
|
It is ready for HV conditioning/ heating. |
Wednesday, August 10, 2016, 11:30, David Wang, ITE, Standard Operation, TM4, UC#17, TM4 has been connected at ITE
|
Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far. |
Wednesday, September 28, 2016, 13:43, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected at ITE
|
All ITE turbo pumps have been started since yesterday afternoon. The ITE and TM4 pumping down is good so far. |
Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS
|
TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good so far. |
Thursday, November 26, 2015, 07:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#14, TM4 has been connected at CS
|
TM4 has been connected at TCS. The water system is started. The TCS HV cover for TM4 is installed also. Basically, The TM4 is ready for conditioning. |
Wednesday, April 01, 2015, 13:12, David Wang, ITE, Standard Operation, TM4, Ta#45, TM4 has been connected in ITE
|
TM4 has been connected in ITE. ITE six turbo-pumps have been started. So far so good. |
Wednesday, June 10, 2015, 11:49, David Wang, ITE, Standard Operation, TM4, SiC #31, TM4 has been connected in ITE
|
Dan and I connected TM4 in ITE. At this stage, water is supplied to TM4 only. We checked the TM4 water signals from electrical room.They are good. The turbo-pumps will be started today once the roughing is done. |
Wednesday, July 29, 2015, 10:14, David Wang, ITE, Standard Operation, TM4, , TM4 has been connected in ITE
|
Dan and I connected TM4 in ITE. We checked all water signals on ITE cooling circuits. Everything is good. |
Tuesday, December 04, 2018, 12:36, David Wang, ITE, Standard Operation, TM4, UCx 26., TM4 has been connected in ITE/ Checklist.
|
TM4 has been connected in ITE. See attachment for connection checklist |
Wednesday, October 10, 2018, 07:52, David Wang, ITE, Standard Operation, TM4, Ta#57, TM4 has been connected in ITE.
|
TM4 has been connected in ITE. see attachment. |
Wednesday, February 03, 2021, 09:14, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 from TCS to SW silo.
|
TM4 is moved from TCS to SW silo. The moving is smooth.
|
Thursday, March 14, 2013, 07:09, David Wang, South Hot-Cell, Standard Operation, TM4, , TM4 electrical test at SHC after windown and containment box back.
|
TM4 electrical test at SHC after windown and containment box back is done. Everything is fine. |
Tuesday, January 24, 2023, 14:22, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#41, TM4 electrical check with and without target at SHC
|
TM4 electrical check with UCX41target and without target at SHC. The results are good. See attachment. |
Thursday, February 20, 2025, 10:12, David Wang, Safe Module Parking, Standard Operation, TM4, No target, TM4 electrical check at SMP(vented) without target
|
TM4 electrical check at SMP(vented) without target: PQ is dead short to RU. PQRU to 60kv bias,750Kohm at250V. other things are good. Notes: In attachment files all hand writing and circled TM2 should be TM4. the results are measured on TM4 not TM2. |
Tuesday, June 21, 2022, 17:49, Frank Song, ITE, Standard Operation, TM4, UCx#37, TM4 disconnection
|
the module with target UCx37 was disconnected in ITE. |
Tuesday, May 22, 2012, 12:36, David Wang, ITE, Standard Operation, TM4, sic 27, TM4 connection in ITE
|
All TM4 connections in ITE is done. The station and TM4 is under roughing now. |
Friday, September 13, 2019, 13:36, David Wang, ITW, Standard Operation, TM4, UCX27, TM4 conenction in ITW checklist
|
TM4 was connected in ITW this Tuesday. See attachment for checklist. |
|