Wednesday, November 22, 2023, 12:24, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#65, Spent Target Move
|
The spent Ta#65 target was removed from the south hot cell and placed in the spent target vault. It was placed in pail #284 and placed in spot 2B. It
was 41 mSv/hr at 1 m upon removal. Target index spreadsheet updated. |
Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check
|
New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment. |
Thursday, June 23, 2022, 13:04, David Wang, Conditioning Station, Standard Operation, TM4, Ta#64, helium pressure test on TM4 HS line.
|
With Ta#64 installed , TM4 HS line was helium pressure tested at TCS. base leak rate is 0.0XE-9 atm.cc/sec. HS line tested leak rate is 3x E-7 atm.cc/sec
on 5 minutes 50 psi helium testing. Leak check result wasgood at NHC by helium spray method. We decided to apply water to HS and all other water lines
still. The vacuum status is closely being watched. So far, TCS pumping down trend is still good. HS line supply water valve was switched on and off couple |
Tuesday, June 28, 2022, 14:13, Frank Song, ITE, Standard Operation, TM4, Ta#64, Module Connection
|
TM4 with Ta#64 was connected in ITE. see attachment please. |
Tuesday, August 09, 2022, 12:19, Frank Song, ITE, Standard Operation, TM4, Ta#64, TM4 with Ta#64 disconnection in ITE
|
TM4 with Ta#64 has been disconnected in ITE. |
Thursday, August 18, 2022, 10:13, Travis Cave, Spent Target Vault, Standard Operation, , Ta#64, Spent Target Move
|
The spent Ta#64 target in the north hot cell has been packaged and placed in the spent target vault. Pail#273 spot #5C 86.6mSv/hr upon removal
from the north hot cell. For detail on the vault see attached PDF. |
Thursday, November 25, 2021, 10:33, David Wang, Conditioning Station, Standard Operation, TM4, Ta#63. , helium pressure test on TM4 HS line at TCS.
|
Helium pressure test on TM4 HS line at TCS is done. LD base leak rate 0.0 xE-9 atm.cc/sec. Helium pressure 70psi. HS line had been helium pressurized
for 5 minutes during the test. No response on LD. HS line with Ta#63 is leak free. |
Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE.
|
Remotely remove TM4(Ta#63) from TCS to ITE. The move is smooth and successful. |
Tuesday, November 30, 2021, 12:51, David Wang, ITE, Standard Operation, TM4, Ta#63., Tm4 has been connected in ITE.
|
TM4 has been connected in ITE. See attachment for checklist. |
Thursday, January 20, 2022, 11:09, Travis Cave, Spent Target Vault, Standard Operation, , Ta#63, Spent Target Move
|
The spent Ta#63 has been moved from the north hot cell to the spent target vault. It was place in pail#266 and
placed in spot #3B of the vault. see attached PDF for more details. |
Thursday, July 08, 2021, 11:36, David Wang, Conditioning Station, Standard Operation, TM4, Ta#62, Remotely remove TM4(Ta#62) from SHC to TCS.
|
Remotely remove TM4 (ta# 62) from SHC to TCS. The moving is smooth. |
Thursday, July 08, 2021, 11:45, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#62, TM4 Ta#62 leak check and lectrical check result at SHC and TCS.
|
At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD leak rate 0.0xE-9atm.cc/sec
, no response. |
Friday, July 30, 2021, 16:19, Carla Babcock, ITE, Repair, TM4, Ta#62, Electrical issues on Ta62
|
TLDR: TBHT voltage too high and rising too quickly with TGHT current - voltage
limited. TGHT power supply tripped breakers somehow. ITE:EL not outputting voltage.
|
Friday, September 17, 2021, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#62, Spent Target Move
|
The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details. |
Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
Friday, January 08, 2021, 09:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the east target station to the south hot cell. |
Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC.
|
Electrical check and leak check at SHC. NO leak. electrical check ok. Before target on, A is short to PQ, RU is short to HS ( 60KV bias)
as we measured before. |
Thursday, August 27, 2020, 08:21, David Wang, Conditioning Station, Standard Operation, TM2, Ta#60, Helium pressure check on TM2 HS line at TCS.
|
Helium pressurize on TM2 HS line at TCS is done. Base LR is 0.0X E-9 atm.cc/sec. 70 psi helium 3 minutes. No response. Also, The TCS vacuum pumping
down over night is good. |
Thursday, August 27, 2020, 09:42, Anders Mjos, Conditioning Station, Maintenance, TM2, Ta#60, Refilled TK2
|
Refilled TCS:TK2 from 10 in to 22 in using the newly installed valve. |
Friday, September 11, 2020, 11:25, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
Both the west entrance module and TM#2 with Ta#60 have been moved back into ITW. |
|