Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 38 of 139  Not logged in ELOG logo
Entry  Wednesday, March 04, 2020, 14:30, David Wang, Safe Module Parking, Standard Operation, TM2, , Remove of TM2 from SMP to SHC. 
Frank and I removed TM2 from SMP to SHC. The move is successful. 
Entry  Wednesday, March 04, 2020, 11:52, David Wang, ITE, Standard Operation, , , ITE HV test without module 
ITE bias test is done to 48KV. No spark. We can not raise bias above 48KV. It looks like we have a current limit issue on control system when testing
above 48KV.  John Cow checked current limit on PS locally. It is set to 8mA which is much higher than the test current. Isac operator issued an e-fault
to control group.  
Entry  Friday, February 28, 2020, 09:36, David Wang, ITE, Repair, , , Entrance module TP1S broken piesces clean up.  
Using the camera,  Frank and I inspected the broken  blades in vacuum duct bending section. We are pretty sure some of  the  broken parts are
fallen into  bottom of entrance module and vacuum  vessel since the broken pars are over on the edge of bending section.  The blades rotated at high
speed. Basically, They were shoot to the duct  opening when they were broken from the pump. Frank and I carefully  swiped all broken parts  from the
Entry  Thursday, February 27, 2020, 16:08, Anders Mjos, North Hot-Cell, Maintenance, , , Hot Cell Entry NHC_2020-02-27.pdf
Chad entered the NHC today to tighten set-screws on both slave side manipulators and re-align the West side slave. Work took place using the HC Confined
Space Entry procedure. See attached checklist. WP I2020-02-27-4
Entry  Thursday, February 27, 2020, 10:37, David Wang, Safe Module Parking, Standard Operation, TM2, , Start of SMP vacuum pump. 
TM2 in SMP with old SiC #39 target on it. SMP vacuum pump is started. 
Entry  Thursday, February 27, 2020, 09:50, Travis Cave, Safe Module Parking, Standard Operation, TM2, SiC#39, Module move 
 TM#2 with SiC#39 has been moved from the east station to the smp.
Entry  Wednesday, February 26, 2020, 08:45, David Wang, Conditioning Station, Standard Operation, TM4, , Remove of TM4 from TCS to SW silo 
TM4 has been moved from TCS to SW silo. The move is fine. 
Entry  Thursday, February 20, 2020, 09:27, David Wang, Spent Target Vault, Standard Operation, , , Inventory of mini storage and vault. Mini_Vault_2020-02-20.pdfVault__2020-02-20.pdf
Repacked nSiC#1 in SHC and moved it to mini storage vault. Transferred UCx26 and UCx28# from vault to mini-storage. See attachment for vault and mini-storage
inventory.
Entry  Friday, February 14, 2020, 14:13, David Wang, South Hot-Cell, Standard Operation, TM4, , SIS dummy target for IGLIS TM4 electrical check Dumm_SIS_target_for_IGLIS_test_on_TM4.pdf
Electrical check and HS, window leak check result at SHC. See attachment.
Entry  Friday, February 14, 2020, 14:06, David Wang, Conditioning Station, Standard Operation, TM4, , TCS vacuum system and water sytem are switched on. 
All turbo pumps are started.  
Entry  Friday, February 14, 2020, 11:25, Travis Cave, Conditioning Station, Standard Operation, TM4, Dummy Target, Module move 
 TM#4 with dummy target has been moved from the south hot cell to the conditioning station.
Entry  Friday, February 07, 2020, 08:05, chad fisher, South Hot-Cell, Development, TM4, , Containment box off for IGLIS 
The containment box has been removed from TM4 in prep for the IGLIS wiring job.
Entry  Thursday, February 06, 2020, 13:32, Adam Newsome, South Hot-Cell, Maintenance, TM4, , TM4 moved from Conditioning Station to South Hot Cell 
 TM4 was moved from conditioning station to south hot cell in preparation for wiring replacement. No target.
Entry  Thursday, February 06, 2020, 13:31, Adam Newsome, Spent Target Vault, Standard Operation, , UC#29, UC#29 moved to vault location 6A, in pail 225 
 UC#29 in pail 225 was moved to the storage vault, location 6A. Field measured at 22.4 mSv/hr at ~1m. 
Entry  Wednesday, February 05, 2020, 11:03, David Wang, South Hot-Cell, Standard Operation, TM4, UCx 29, UCx 29 post run electrical check UCx29_post_run_electrical_check..pdf
UCx 29 TM4 post run electrical check is done before target is removed. Everything is normal on measurements.
Entry  Wednesday, February 05, 2020, 10:54, David Wang, Conditioning Station, Standard Operation, TM4, , Roughing out TM4 at TCS. 
TCS MP1 is started to rough out TM4 and TCS. TCS and TM4 will be under roughing only today and tomorrow. No plan to start TCS and TM4 turbo pumps this
time. 
Entry  Wednesday, February 05, 2020, 10:49, David Wang, Conditioning Station, Standard Operation, TM4, , Remove of TM4 from SHC to TCS. 
TM4 has been moved from SHC to TCS. No target on module. The move is successful. 
Entry  Wednesday, February 05, 2020, 08:22, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#29, UCx#29 removed 
UCx#29 has been removed from TM$ and placed in a pail backfilled with argon until it can be moved to the storage vault.
Entry  Tuesday, February 04, 2020, 14:22, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#29, Module move 
 TM#4 with UC#29 has been moved from the west target station to the south hot cell.
Entry  Monday, February 03, 2020, 09:14, David Wang, ITW, Standard Operation, TM4, UCx 29, TM4 UCx 29 disconnection checklist  UCx29__disconnection_checklist.pdf
TM4 has been disconnected in ITW. See attachment checklist. 
ELOG V2.9.2-2455