Entry  Thursday, October 05, 2023, 13:50, Frank Song, ITW, Standard Operation, TM2, Ta#66, Module Connection TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
Entry  Wednesday, January 03, 2024, 13:55, David Wang, ITW, Standard Operation, TM2, Ta#66, Disconnect TM2 in ITW. TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
Entry  Wednesday, January 03, 2024, 14:03, David Wang, ITW, Standard Operation, TM2, Ta#66, ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.  ITW_2024_shut_down_leak_check.pdf
Entry  Wednesday, January 10, 2024, 11:24, Travis Cave, Spent Target Vault, Standard Operation, , Ta#66, Spent Target Move Target_Index_2023-01-10.pdf
Entry  Friday, January 12, 2024, 11:25, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#66, Ta#66 post operation electrical check at SHC TM2_Ta66_post__oeration_electrical_check.pdf
Entry  Wednesday, January 17, 2024, 20:09, Carla Babcock, South Hot-Cell, Standard Operation, , Ta#66, Ta#66 post irradiation inspection 20240109_100926(1).jpg20240109_101053.jpg20240109_102409.jpg
Entry  Friday, May 03, 2024, 12:20, Travis Cave, Spent Target Vault, Standard Operation, , Ta#66, Target repacked Target_Index_2024-05-03.pdf
Entry  Tuesday, August 29, 2023, 14:32, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#65, electrical check/leak check TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
Entry  Tuesday, August 29, 2023, 14:32, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#65, electrical check/leak check TM4_electric_and_leak_check_after_Ta#65_installed_2023-08-29.pdf
Entry  Wednesday, September 06, 2023, 08:07, Frank Song, ITE, Standard Operation, TM4, Ta#65, Module Connection TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf
Entry  Tuesday, November 07, 2023, 13:42, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#65, electrical check with the spent target TM4_with_Spent_Target_Ta#65_electrical_check_on_SHC_2023-11-07.pdf
Entry  Tuesday, November 07, 2023, 13:55, Frank Song, ITE, Standard Operation, TM4, Ta#65, module disconnection TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
Entry  Wednesday, November 22, 2023, 12:24, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#65, Spent Target Move 
Entry  Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check Ta#64.jpg
Entry  Thursday, June 23, 2022, 13:04, David Wang, Conditioning Station, Standard Operation, TM4, Ta#64, helium pressure test on TM4 HS line.  
Entry  Tuesday, June 28, 2022, 14:13, Frank Song, ITE, Standard Operation, TM4, Ta#64, Module Connection tm4_with_Ta#64_connection_in_ITE.jpg
Entry  Tuesday, August 09, 2022, 12:19, Frank Song, ITE, Standard Operation, TM4, Ta#64, TM4 with Ta#64 disconnection in ITE TM4_with_Ta#64_disconnection_in_ITE.jpeg
Entry  Thursday, August 18, 2022, 10:13, Travis Cave, Spent Target Vault, Standard Operation, , Ta#64, Spent Target Move Target_Index_2022-08-18.pdf
Entry  Thursday, November 25, 2021, 10:33, David Wang, Conditioning Station, Standard Operation, TM4, Ta#63. , helium pressure test on TM4 HS line at TCS.  
Entry  Tuesday, November 30, 2021, 11:03, David Wang, ITE, Standard Operation, TM4, Ta#63., Remotely remove TM4(Ta#63) from TCS to ITE. 