Friday, June 08, 2012, 11:07, David Wang, Conditioning Station, Standard Operation, TM1, Ta38, conditioning staion and TM1 is under TP1 and TP2 pumping now.
Friday, June 08, 2012, 15:03, Don Jackson, South Hot-Cell, Standard Operation, TM1, Ta38, Electrical Check on new Ta38 at hot cell
Monday, June 11, 2012, 14:41, David Wang, Conditioning Station, Standard Operation, TM1, Ta38, Heat shield helium pressure test
Tuesday, June 19, 2012, 16:18, David Wang, ITW, Standard Operation, TM1, Ta38, TM1connected in ITW
Tuesday, July 31, 2012, 09:52, David Wang, ITW, Standard Operation, TM1, Ta38, TM1 disconnected in ITW
Tuesday, July 19, 2011, 12:25, maicodallavalle, South Hot-Cell, Standard Operation, TM4, Ta36, TM4 Ta36 Target was put into the south hot cell.
Tuesday, October 08, 2024, 11:46, David Wang, ITE, Standard Operation, TM2, Ta#68., Tm2 has been moved form SHC to ITE.
Friday, September 06, 2024, 14:28, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68(Spare), Ta#68(Spare) removed from TM4 and into Anteroom
Friday, August 16, 2024, 15:32, Aaron Tam, South Hot-Cell, Standard Operation, TM4, Ta#68 LP-SIS, Target Ta#68 loaded onto TM4
Monday, August 19, 2024, 09:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#68 , TM4 has been moved from SHC to TCS.
Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check
Tuesday, October 08, 2024, 11:20, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 install onto TM2, w/ Troubleshooting
17x
Wednesday, October 09, 2024, 14:04, Frank Song, ITE, Standard Operation, TM2, Ta#68, Module Connection
Tuesday, December 03, 2024, 10:10, Frank Song, ITE, Standard Operation, TM2, Ta#68, module disconnection
Tuesday, December 03, 2024, 15:53, Aaron Tam, South Hot-Cell, Standard Operation, TM2, Ta#68, Ta#68 Removal
22x
Wednesday, December 04, 2024, 14:30, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Ta#68 PIE
32x
Thursday, December 05, 2024, 11:43, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68, Pail loading - Ta#68 & Others into Pail#300
Thursday, December 05, 2024, 12:00, Adam Newsome, Spent Target Vault, Standard Operation, , Ta#68, Spent target move - Ta#68 in Pail 300
Tuesday, August 13, 2024, 14:23, David Wang, ITE, Standard Operation, TM3, Ta#67., TM2 with Ta#target has been moved from SHC to ITE.
Friday, September 06, 2024, 10:01, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#67 back up. , TM4 has been moved from SMP to SHC.