  RH-ISAC, Page 35 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  783   Thursday, November 06, 2014, 08:55 David WangITWRepairTM1ThO#1 primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20
  
  785   Thursday, November 13, 2014, 13:52 David WangITWStandard OperationTM1ThO#15 Shielding blocks have been transferred from ITE to ITW.Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  856   Monday, March 09, 2015, 14:01 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 removedThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled
  
  857   Tuesday, March 10, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Module moveTM#1 has been moved from the west station
to the south hot cell had the ThO#1 target
removed and then the modules was moved from
 TM1_THO_elec_chk_postbeamSHC.PDF 
  860   Thursday, March 12, 2015, 13:33 Anders MjosSouth Hot-CellStandard OperationTM1ThO#1Target inspectionChad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material
  
  861   Friday, March 13, 2015, 13:36 Travis CaveSpent Target VaultStandard Operation ThO#1Spent Target MoveThe ThO#1 has been placed in the storage
vault placed in pail #122 in spot 2B of the
vault. It was 6.2mSv/hr upon removal from
 Storage_Vault_March_13_2015.pdf 
  2114   Tuesday, June 30, 2020, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4Test Proton to Neutron TargetModule move TM#4 has been moved from the east
target station to the south hot cell.
  
  34   Monday, October 03, 2011, 14:52 Travis CaveSouth Hot-CellStandard OperationTM1TaC#1Electrical checkTM#1 with TaC#1 installed passed the electrical
test. With a value of 882MOhms that was meggered
from the heat shield to the chassis, all
  
  35   Tuesday, October 04, 2011, 14:13 Travis CaveITWStandard OperationTM1TaC#1Move ot TM#1Move of TM#1 with the TaC#1 target has
been moved from the south hot cell to the
west target station.
  
  50   Monday, November 14, 2011, 14:07 Travis CaveITWStandard OperationTM1TaC#1Module moveTM#1 with TaC#1 from the west target station
to the south hot cell. Move went well.
  
  52   Wednesday, November 16, 2011, 07:44 chad fisherSouth Hot-CellStandard OperationTM1TaC#1TaC#1 Removal and inspectionNovember 15, 2011 removed TaC#1 from TM1
and inspected TM1 for any obivous signs of
trouble (Problems with EE at end of run).
  
  53   Wednesday, November 16, 2011, 07:46 chad fisherSouth Hot-CellStandard OperationTM1TaC#1Inspection of TaC#1Inspection of TaC#1 showed that the oven
was indeed broken on the A+ (left oven leg)
side of the central block.
  
  54   Thursday, November 17, 2011, 11:51 Travis CaveSpent Target VaultStandard Operation TaC#1Spent target moveTaC#1 was moved from the south hot cell
to the storage vault. It was placed in pail#92
and put in vault slot 7B. It was 239mSv/hr
  
  567   Wednesday, December 04, 2013, 11:05 David WangITWStandard OperationTM4Ta41#I disconnected TM4 in ITWI disconnected TM4 in ITW .The job took
about 20minutes and I got 0.11 msv dose.
  
  119   Wednesday, June 06, 2012, 14:33 David WangSouth Hot-CellStandard OperationTM1Ta38leak check heat shield circuitChad and I did a leak check on heat shield
circuit after target is installed on TM1.The
leak detector pumping down is smooth. The
  
  120   Thursday, June 07, 2012, 11:58 Bevan MossConditioning StationStandard OperationTM1Ta38Module Move from SHC to TCSTM1 was moved from SHC to the TCS. The
mode took roughly 1 hour. During the move
the north east corner of the containment
  