232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move | TiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a |
|
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. | vacuum leak check on TM4 service cap in
ITW was done this morning. leak
detector leak rate 0.0XE-9 atm.cc/sec. No |
|
|
2640
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW.
the move is smooth. |
|
|
2641
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW.
the move is smooth. |
|
|
2661
|
Friday, August 16, 2024, 09:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC.
The move is smooth.
|
|
|
209
|
Thursday, November 08, 2012, 08:42 |
David Wang | Conditioning Station | Standard Operation | TM1 | TiC #3 | TM1 TiC #3 target heat shield helium pressure check is done. | TM1 TiC #3 target heat shield
helium pressure check is done at conditioning
station. Applied 80 psi helium to HS circuit |
|
|
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell | Chad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The |
|
|
776
|
Monday, November 03, 2014, 11:16 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 Installed | ThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs. |
|
|
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check | TM#1 with ThO#1 electrical check see attatched
PDF for details. |
|
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. | Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec, |
|
|
779
|
Tuesday, November 04, 2014, 13:17 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | TM1 w/ ThO#1 ready | Tm1 with ThO#1 is buttoned up and ready
for transport. |
|
|
780
|
Wednesday, November 05, 2014, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | module move | TM#1 with ThO#1 has been moved from the
south hot cell to the west target station. |
|
|
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. | TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to |
|
|
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. | I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20 |
|
|
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. | Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
|
856
|
Monday, March 09, 2015, 14:01 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 removed | ThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled |
|
|
857
|
Tuesday, March 10, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Module move | TM#1 has been moved from the west station
to the south hot cell had the ThO#1 target
removed and then the modules was moved from |
|
|
860
|
Thursday, March 12, 2015, 13:33 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Target inspection | Chad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material |
|
|
861
|
Friday, March 13, 2015, 13:36 |
Travis Cave | Spent Target Vault | Standard Operation | | ThO#1 | Spent Target Move | The ThO#1 has been placed in the storage
vault placed in pail #122 in spot 2B of the
vault. It was 6.2mSv/hr upon removal from |
|
|
2114
|
Tuesday, June 30, 2020, 10:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Test Proton to Neutron Target | Module move | TM#4 has been moved from the east
target station to the south hot cell. |
|