ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  232   Tuesday, January 15, 2013, 14:37 Travis CaveSpent Target VaultStandard Operation TiC#3Spent target moveTiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a
 Vault_Storage_January_15_2013.pdf 
  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW. vacuum leak check on TM4 service cap in
ITW was done this morning.   leak
detector leak rate 0.0XE-9 atm.cc/sec. No
  
  2640   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth. 
  
  2641   Tuesday, July 16, 2024, 11:15 David WangITWStandard OperationTM4TiC #7 febiad. TM4 has been moved from TCS to ITW. TM4 has been moved from TCS to ITW. 
the move is smooth.
  
  2661   Friday, August 16, 2024, 09:50 David WangSouth Hot-CellStandard OperationTM4TiC #7 febiad.TM4 has been moved from SMP to SHC.TM4 has been moved from  SMP to SHC.
The move is smooth.
 
  
  209   Thursday, November 08, 2012, 08:42 David WangConditioning StationStandard OperationTM1TiC #3TM1 TiC #3 target heat shield helium pressure check is done.TM1 TiC #3 target  heat shield 
helium pressure check  is done at conditioning
station. Applied 80 psi helium to HS circuit
  
  208   Wednesday, November 07, 2012, 11:09 David WangSouth Hot-CellStandard OperationTM1TiC TM1 heat shield circuit leak check with TiC target at hot cellChad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The
  
  776   Monday, November 03, 2014, 11:16 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 InstalledThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs.
  
  777   Monday, November 03, 2014, 13:47 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Electrical checkTM#1 with ThO#1 electrical check see attatched
PDF for details.
 TM1_elec_check_ThO1_SHC.PDF 
  778   Tuesday, November 04, 2014, 11:05 David WangSouth Hot-CellStandard OperationTM1ThO#1Leak check on TM1 HS water line withThO#1 installed.Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec,
  
  779   Tuesday, November 04, 2014, 13:17 chad fisherSouth Hot-CellStandard OperationTM1ThO#1TM1 w/ ThO#1 readyTm1 with ThO#1 is buttoned up and ready
for transport.
  
  780   Wednesday, November 05, 2014, 10:20 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1module moveTM#1 with ThO#1 has been moved from the
south hot cell to the west target station.
  
  782   Thursday, November 06, 2014, 08:07 David WangITWStandard OperationTM1ThO#1TM1 has been connected in ITW.TM1 has been connected in ITW. All turbo
pumps are started. The pumping down on ITW
is good so far. The water is supplied to
  
  783   Thursday, November 06, 2014, 08:55 David WangITWRepairTM1ThO#1 primary vacuum back up pressureITH CG1 ,CG2,CG4A were high.I found primary vacuum back up pressure
ITH CG1, CG2, and CG4A were unusually high
this morning. They should be about 10 -20
  
  785   Thursday, November 13, 2014, 13:52 David WangITWStandard OperationTM1ThO#15 Shielding blocks have been transferred from ITE to ITW.Dan and I transferred 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam.
  
  856   Monday, March 09, 2015, 14:01 chad fisherSouth Hot-CellStandard OperationTM1ThO#1ThO#1 removedThO#1 has been removed from TM1 and placed
into the plastic dissection box.
Containment box cover has been reinstalled
  
  857   Tuesday, March 10, 2015, 09:01 Travis CaveSouth Hot-CellStandard OperationTM1ThO#1Module moveTM#1 has been moved from the west station
to the south hot cell had the ThO#1 target
removed and then the modules was moved from
 TM1_THO_elec_chk_postbeamSHC.PDF 
  860   Thursday, March 12, 2015, 13:33 Anders MjosSouth Hot-CellStandard OperationTM1ThO#1Target inspectionChad, Anders and Alex inspected the target
this morning. The target had no significant
visible damage to the container. Some material
  
  861   Friday, March 13, 2015, 13:36 Travis CaveSpent Target VaultStandard Operation ThO#1Spent Target MoveThe ThO#1 has been placed in the storage
vault placed in pail #122 in spot 2B of the
vault. It was 6.2mSv/hr upon removal from
 Storage_Vault_March_13_2015.pdf 
  2114   Tuesday, June 30, 2020, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4Test Proton to Neutron TargetModule move TM#4 has been moved from the east
target station to the south hot cell.
  